Notice of Deviation from Insp on 870805-0902.Deviation Noted:Administrative Controls Not Contained in Procedure to Ensure Adequate Retesting of Sys or Design Features Which Have Been Maintained or Modified Following Testing
ML20236C610
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/23/1987
From:
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20236C585 List:
References
50-445-87-16, 50-446-87-13, NUDOCS 8710270269
Download: ML20236C610 (1)


Text

- _ - _ _ _ ,

I APPENDIX B NOTICE OF DEVIATION ,

TU Electric Dockets: 50-445/87-16 50-446/87-13 Comanche Peak Steam Electric Station, Permits: CPPR-126 Units 1 and 2 CPPR-127 l

l As a result of the NRC inspection conducted on August 5 through September 2, 1987, and in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the following deviation was identified:

Appendix 1A(B) of the FSAR commits the applicant to Regulatory Guide 1.68, Revision 2, August 1978. Regulatory Position C.2 of l Regulatory Guide (RG) 1.68 (Revision 2 of August 1978), requires, i in part, the establishment of administrative controls to ensure adequate retesting of systems or design features maintained or modified during or following preoperational testing. RG 1.68 requires that upon licensing, all safety related systems and design 1 features must meet the preoperational test acceptance criteria as described in the FSAR with any and all exceptions identified to the NRC and appropriately justified.

In deviation from the above, Operations Administrative Procedure j STA-623, " Post Work Testing," Revision 1 of June 26, 1987, does not l contain administrative controls to ensure adequate retesting of j '

systems or design features which have been maintained or modified following preoperational testing (445/8716-D-01). )

l Pursuant to the provisions of 10 CFR 2.201, TU Electric is hereby j required to submit to this office, within 30 days of the date of I the letter transmitting this Notice, a written statement or  !

explanation in reply, including for each deviation: (1) the i reasons for the deviation if admitted, (2) the corrective steps I which have been taken and the results achieved, (3) the corrective steps which wil' be taken to avoid further deviations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending your response time.

1 OCT 2 3 l987 I Dated )

I 8710270269 DR 571023 {

ADOCK 05000445 '