MONTHYEARIR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination ML21110A5272021-04-19019 April 2021 GFE Results, March 2021 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4102020-08-25025 August 2020 2020 DC Cook Ile Operating Test Review Worksheet ES-301-7 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A2592020-08-25025 August 2020 2020 DC Cook Ile As-Administered Control Room and In-Plant Systems JPMs ML21006A4402020-08-25025 August 2020 2020 DC Cook Ile Post Exam Package Submittal Letter and Comment Summary Rcvd 20200825 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML20356A0912020-08-25025 August 2020 2020 DC Cook Ile Proposed Control Room and In-Plant Systems JPMs ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML21006A4412020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 RO ML20356A1602020-08-25025 August 2020 2020 DC Cook Ile Exam Outline Quality Checklist ES-201-2 ML20356A0862020-08-25025 August 2020 2020 DC Cook Ile Written Examination Quality Checklist ES-401-6 ML21005A4312020-08-25025 August 2020 2020 DC Cook Ile As-Administered Simulator Scenarios ML20356A2652020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO and SRO Admin JPMs ML20356A0742020-08-25025 August 2020 2020 DC Cook Ile Operating Test Quality Checklist ES-301-3 ML20356A0332020-08-25025 August 2020 2020 DC Cook Ile Operating Test Competencies Checklist ES-301-6 ML20356A1412020-08-25025 August 2020 2020 DC Cook Ile Operating Test JPM Outlines ES-301-1 and ES-301-2 ML21006A4202020-08-25025 August 2020 2020 DC Cook Ile Written Exam Review Worksheet ES-401-9 ML20356A1012020-08-25025 August 2020 2020 DC Cook Ile Proposed Simulator Scenarios ML20356A0952020-08-25025 August 2020 2020 DC Cook Ile Proposed RO and SRO Admin JPMs ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 ML21006A4442020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 SRO ML20356A0992020-08-25025 August 2020 2020 DC Cook Ile Proposed Ro_Sro Written Examination ML20356A1492020-08-25025 August 2020 2020 DC Cook Ile Operating Test Scenario Outlines ES-D-1 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML20364A2132020-08-13013 August 2020 2018 Donald C. Cook Nuclear Power Plant Exam Administered Scenarios ML20210M4202020-07-29029 July 2020 Operator Licensing Examination Approval ML19353A0252019-12-18018 December 2019 Confirmation of Initial License Examination AEP-NRC-2019-26, Response to RIS 2019-022019-05-30030 May 2019 Response to RIS 2019-02 2024-09-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4202020-08-25025 August 2020 2020 DC Cook Ile Written Exam Review Worksheet ES-401-9 ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML21006A4442020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 SRO ML20356A1492020-08-25025 August 2020 2020 DC Cook Ile Operating Test Scenario Outlines ES-D-1 ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 ML20356A1602020-08-25025 August 2020 2020 DC Cook Ile Exam Outline Quality Checklist ES-201-2 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML20356A0332020-08-25025 August 2020 2020 DC Cook Ile Operating Test Competencies Checklist ES-301-6 ML20356A0742020-08-25025 August 2020 2020 DC Cook Ile Operating Test Quality Checklist ES-301-3 ML20356A1412020-08-25025 August 2020 2020 DC Cook Ile Operating Test JPM Outlines ES-301-1 and ES-301-2 ML20356A0862020-08-25025 August 2020 2020 DC Cook Ile Written Examination Quality Checklist ES-401-6 ML21005A4312020-08-25025 August 2020 2020 DC Cook Ile As-Administered Simulator Scenarios ML20356A0912020-08-25025 August 2020 2020 DC Cook Ile Proposed Control Room and In-Plant Systems JPMs ML20356A2652020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO and SRO Admin JPMs ML21006A4412020-08-25025 August 2020 2020 DC Cook Ile Written Exam Grading Quality Checklist ES-403-1 RO ML20356A0952020-08-25025 August 2020 2020 DC Cook Ile Proposed RO and SRO Admin JPMs ML21006A4102020-08-25025 August 2020 2020 DC Cook Ile Operating Test Review Worksheet ES-301-7 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML21006A4402020-08-25025 August 2020 2020 DC Cook Ile Post Exam Package Submittal Letter and Comment Summary Rcvd 20200825 ML20356A2592020-08-25025 August 2020 2020 DC Cook Ile As-Administered Control Room and In-Plant Systems JPMs ML20356A0992020-08-25025 August 2020 2020 DC Cook Ile Proposed Ro_Sro Written Examination ML20356A1012020-08-25025 August 2020 2020 DC Cook Ile Proposed Simulator Scenarios ML20364A2132020-08-13013 August 2020 2018 Donald C. Cook Nuclear Power Plant Exam Administered Scenarios ML20210M4202020-07-29029 July 2020 Operator Licensing Examination Approval ML19353A0252019-12-18018 December 2019 Confirmation of Initial License Examination AEP-NRC-2019-26, Response to RIS 2019-022019-05-30030 May 2019 Response to RIS 2019-02 ML20365A0662018-08-13013 August 2018 2018 Donald C. Cook Nuclear Power Plant Exam Form ES-201-1 2024-09-05
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Date of Examination: 7/23/2018 RO SRO-I SRO-U Operating Test No.: ______________
Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function
- a. Emergency Borate RCS for 2 stuck rods using 4023-ES-0.1 QMO-410 A-L-N-S 1 fails) KA APE 024 AA1.15 3.1/2.9, SYS 004 A2.14 3.8/3.9
- b. Vent Reactor Vessel Voids (FR-I-3 Step 13) KA EPE 009 EA2.38 3.9/4.3 L-N-S 2
- c. Isolate Safety Injection Accumulators per OHP-4023.ES-1.2 (1 Failed A-D-EN-L-S 3 Accumulator Discharge Valves) KA SYS 006 A4.02 4.0/3.8 L-M-S
- d. Start a RCP per 02-OHP-4023-SUP-010 KA EPE 009 EA1.09 4P 3.6/3.6
- e. Verify Containment Isolation Phase A IAW OHP-4023-E-0 Att. A A-L-M-S 5 (Alternate Path with OHP-4023-SUP-004 or PPC) KA SYS 103 A2.03 3.5/3.8
- f. Synchronize and Load 1AB EDG per 01-OHP-4030-STP-027AB. K/A A-D-EN-S 6 SYS 064 A4.06 3.9/3.9
- g. Respond to an R5 High Alarm (Auto Actions Failed) KA 072 K4.02 A-D-S 7 3.2/3.4, KA 072 A3.01 2.9/3.1, APE 061 AA1.01 3.6/3.6
- h. Perform Control Room actions for Fuel Handling Accident in Containment L-N-S 8 SYS 034 A2.01 3.6/4.4 APE 036 AA1.01 3.3/3.8 In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Establish ESW Cooling to CRAC per 4021-028-014 Att. 6 KA APE 068 D-E 7 AA1.24 3.0/3.6
- j. Perform RCS Isolation 4025 LTI-5-1, Deenergize RCS & SG BD, Trip E--M 3 Pressurizer Heaters. APE 068 AK3.18 4.2/4.5, SYS 002 K6.04 2.5/2.9
- k. Respond to Waste Gas Panel Alarm( (Tk full w/ auto swap fail) KA 071 A-D-R 9 A4.14 2.8/3.0 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)
(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Date of Examination: 7/23/2018 RO SRO-I SRO-U Operating Test No.: ______________
Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function
- a. Emergency Borate RCS for 2 stuck rods using 4023-ES-0.1 QMO-410 A-L-N-S 1 fails) KA APE 024 AA1.15 3.1/2.9, SYS 004 A2.14 3.8/3.9
- b. Vent Reactor Vessel Voids (FR-I-3 Step 13) KA EPE 009 EA2.38 3.9/4.3 L-N-S 2
- c. Isolate Safety Injection Accumulators per OHP-4023.ES-1.2 (1 Failed A-D-EN-L-S 3 Accumulator Discharge Valves) KA SYS 006 A4.02 4.0/3.8 L-M-S
- d. Start a RCP per 02-OHP-4023-SUP-010 KA EPE 009 EA1.09 4P 3.6/3.6
- e. Verify Containment Isolation Phase A IAW OHP-4023-E-0 Att. A A-L-M-S 5 (Alternate Path with OHP-4023-SUP-004 or PPC) KA SYS 103 A2.03 3.5/3.8
- f. Synchronize and Load 1AB EDG per 01-OHP-4030-STP-027AB. K/A A-D-EN-S 6 SYS 064 A4.06 3.9/3.9
- h. Perform Control Room actions for Fuel Handling Accident in Containment L-N-S 8 SYS 034 A2.01 3.6/4.4 APE 036 AA1.01 3.3/3.8 In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Establish ESW Cooling to CRAC per 4021-028-014 Att. 6 KA APE 068 D-E 7 AA1.24 3.0/3.6
- j. Perform RCS Isolation 4025 LTI-5-1, Deenergize RCS & SG BD, Trip E--M 3 Pressurizer Heaters. APE 068 AK3.18 4.2/4.5, SYS 002 K6.04 2.5/2.9
- k. Respond to Waste Gas Panel Alarm( (Tk full w/ auto swap fail) KA 071 A-D-R 9 A4.14 2.8/3.0 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)
(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Date of Examination: 7/23/2018 RO SRO-I SRO-U Operating Test No.: ______________
Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function
- a. Emergency Borate RCS for 2 stuck rods using 4023-ES-0.1 QMO-410 A-L-N-S 1 fails) KA APE 024 AA1.15 3.1/2.9, SYS 004 A2.14 3.8/3.9
- b. Vent Reactor Vessel Voids (FR-I-3 Step 13) KA EPE 009 EA2.38 3.9/4.3 L-N-S 2
- f. Synchronize and Load 1AB EDG per 01-OHP-4030-STP-027AB. K/A A-D-EN-S 6 SYS 064 A4.06 3.9/3.9 In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- j. Perform RCS Isolation 4025 LTI-5-1, Deenergize RCS & SG BD, Trip E--M 3 Pressurizer Heaters . APE 068 AK3.18 4.2/4.5, SYS 002 K6.04 2.5/2.9
- k. Respond to Waste Gas Panel Alarm( (Tk full w/ auto swap fail) KA 071 A-D-R 9 A4.14 2.8/3.0 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)
(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator