ML20357A429

From kanterella
Jump to navigation Jump to search
2018 Donald C. Cook Nuclear Power Plant Exam Forms ES-301-5
ML20357A429
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/13/2018
From: Chuck Zoia
Operations Branch III
To:
NRC/RGN-III/DRS/OLB
Zoia C
Shared Package
ML17164A385 List:
References
Download: ML20357A429 (12)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: A (Crew 1)

A E Scenarios P V Scenario 1 Scenario 5 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 1 0 0 0 1 0 0 0 0 0 0 0 2 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 3 0 0 0 2 0 0 0 0 0 0 0 5 4 4 2 SRO-U MAJ 1 0 0 0 1 0 0 0 0 0 0 0 2 2 2 1 TS 3 0 0 0 0 0 0 0 0 0 0 0 3 0 2 2 RX 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 0 RO NOR 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 0 0 0 2 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: B (Crew 2)

A E Scenarios P V Scenario 3 Scenario 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 1 0 0 1 0 0 0 0 0 0 0 0 2 1 1 0 NOR 1 0 0 1 0 0 0 0 0 0 0 0 2 1 1 1 SRO-I I/C 4 0 0 4 0 0 0 0 0 0 0 0 8 4 4 2 SRO-U MAJ 1 0 0 1 0 0 0 0 0 0 0 0 2 2 2 1 TS 2 0 0 2 0 0 0 0 0 0 0 0 4 0 2 2 RX 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 0 RO NOR 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 0 0 0 2 2 2 1 TS 0 00 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 1 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 1 0 0 0 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 0 2 0 2 0 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 0 1 0 1 0 0 0 0 0 0 0 2 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: C (Crews 3&4)

A E Scenarios P V Scenario 3 Scenario 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 1 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 NOR 1 0 0 0 0 1 0 0 0 0 0 0 2 1 1 1 SRO-I I/C 4 0 0 0 0 2 0 0 0 0 0 0 6 4 4 2 SRO-U MAJ 1 0 0 0 0 1 0 0 0 0 0 0 2 2 2 1 TS 2 0 0 0 0 0 0 0 0 0 0 0 2 0 2 2 RX 0 1 0 1 0 0 0 0 0 0 0 0 2 1 1 0 RO NOR 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 4 0 0 0 0 0 0 0 0 6 4 4 2 SRO-U MAJ 0 1 0 1 0 0 0 0 0 0 0 0 2 2 2 1 TS 0 00 0 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 0 0 0 1 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 1 0 0 0 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 0 2 0 2 0 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 0 1 0 1 0 0 0 0 0 0 0 2 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: D (Crews 5 & 6)

A E Scenarios P V Scenario 1 Scenario 2 Scenario 5 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 1 0 0 0 1 0 1 0 0 0 0 0 3 1 1 0 SRO-I NOR 0 0 0 0 0 0 1 0 0 0 0 0 1 1 1 1 I/C 3 0 0 0 2 0 4 0 0 0 0 0 9 4 4 2 SRO-U MAJ 1 0 0 0 1 0 1 0 0 0 0 0 3 2 2 1 TS 3 0 0 0 0 0 3 0 0 0 0 0 6 0 2 2 RO RX 0 1 0 1 0 0 0 0 0 0 0 0 2 1 1 0 NOR 0 0 0 0 0 0 0 0 1 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 4 0 0 0 0 2 0 0 0 8 4 4 2 SRO-U MAJ 0 1 0 1 0 0 0 0 1 0 0 0 3 2 2 1 TS 0 0 0 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 0 0 0 0 0 0 1 0 0 0 0 1 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 0 0 1 0 0 2 0 2 0 0 0 0 5 4 4 2 SRO-U MAJ 0 0 1 0 0 1 0 1 0 0 0 0 3 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: RO-X A E Scenarios P V Scenario 3 Scenario 4 Scenario 1 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 0 0 0 0 1 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 1 0 0 0 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 0 2 0 2 0 0 0 1 0 0 0 5 4 4 2 SRO-U MAJ 0 0 1 0 1 0 0 0 1 0 0 0 3 2 2 1 Schuck TS 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 RO NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: A (Crew 1)

A E Scenarios P V Scenario 1 Scenario 5 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 1 0 0 0 1 0 0 0 0 0 0 0 2 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 3 0 0 0 2 0 0 0 0 0 0 0 5 4 4 2 SRO-U MAJ 1 0 0 0 1 0 0 0 0 0 0 0 2 2 2 1 Ashley TS 3 0 0 0 0 0 0 0 0 0 0 0 3 0 2 2 RO RX 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 0 0 0 2 2 2 1 Fox TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: B (Crew 2)

A E Scenarios P V Scenario 3 Scenario 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 1 0 0 1 0 0 0 0 0 0 0 0 2 1 1 0 NOR 1 0 0 1 0 0 0 0 0 0 0 0 2 1 1 1 SRO-I I/C 4 0 0 4 0 0 0 0 0 0 0 0 8 4 4 2 SRO-U MAJ 1 0 0 1 0 0 0 0 0 0 0 0 2 2 2 1 Gano TS 2 0 0 2 0 0 0 0 0 0 0 0 4 0 2 2 RO RX 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 0 0 0 2 2 2 1 Burke TS 0 00 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: C (Crew 3)

A E Scenarios P V Scenario 3 Scenario 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 1 1 0 0 0 0 0 0 0 0 2 1 1 1 SRO-I I/C 0 0 2 4 0 0 0 0 0 0 0 0 6 4 4 2 SRO-U MAJ 0 0 1 1 0 0 0 0 0 0 0 0 2 2 2 1 Simmons TS 0 0 0 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 See TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 SRO-X RO RX 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 0 0 0 2 2 2 1 Nord TS 0 00 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: C (Crew 4)

A E Scenarios P V Scenario 3 Scenario 4 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 1 1 0 0 0 0 0 0 0 0 2 1 1 1 SRO-I I/C 0 0 2 4 0 0 0 0 0 0 0 0 6 4 4 2 SRO-U MAJ 0 0 1 1 0 0 0 0 0 0 0 0 2 2 2 1 Stembridge TS 0 0 0 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 1 0 0 0 1 0 0 0 0 0 0 0 2 1 1 0 NOR 1 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 4 0 0 0 2 0 0 0 0 0 0 0 6 4 4 2 SRO-U MAJ 1 0 0 0 1 0 0 0 0 0 0 0 2 2 2 1 Campau TS 2 0 0 0 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 0 0 0 2 2 2 1 Wark TS 0 00 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: D (Crew 5)

A E Scenarios P V Scenario 1 Scenario 5 Scenario 2 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 1 0 0 0 1 0 1 0 0 0 0 0 3 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 3 0 0 0 2 0 4 0 0 0 0 0 9 4 4 2 SRO-U MAJ 1 0 0 0 1 0 1 0 0 0 0 0 3 2 2 1 Lloyd TS 3 0 0 0 0 0 3 0 0 0 0 0 6 0 2 2 RO RX 0 1 0 1 0 0 0 0 0 0 0 0 2 1 1 0 NOR 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 4 0 0 0 0 2 0 0 0 8 4 4 2 SRO-U MAJ 0 1 0 1 0 0 0 0 1 0 0 0 3 2 2 1 Olp TS 0 0 0 3 0 0 0 0 0 0 0 0 3 0 2 2 RO RX 0 0 0 0 0 0 0 1 0 0 0 0 1 1 1 0 SRO-I NOR 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 I/C 0 0 1 0 0 2 0 2 0 0 0 0 5 4 4 2 SRO-U MAJ 0 0 1 0 0 1 0 1 0 0 0 0 3 2 2 1 Sell TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: D (Crew 6)

A E Scenarios P V Scenario 1 Scenario 5 Scenario 2 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 1 0 0 0 1 0 1 0 0 0 0 0 3 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 3 0 0 0 2 0 4 0 0 0 0 0 9 4 4 2 SRO-U MAJ 1 0 0 0 1 0 1 0 0 0 0 0 3 2 2 1 Blosser TS 3 0 0 0 0 0 3 0 0 0 0 0 6 0 2 2 RO RX 0 1 0 1 0 0 0 0 0 0 0 0 2 1 1 0 NOR 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 4 0 0 0 0 2 0 0 0 8 4 4 2 SRO-U MAJ 0 1 0 1 0 0 0 0 1 0 0 0 3 2 2 1 Meyer TS 0 0 0 3 0 0 0 0 0 0 0 0 3 0 2 2 RO RX 0 0 0 0 0 0 0 1 0 0 0 0 1 1 1 0 SRO-I NOR 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 I/C 0 0 1 0 0 2 0 2 0 0 0 0 5 4 4 2 SRO-U MAJ 0 0 1 0 0 1 0 1 0 0 0 0 3 2 2 1 Rumpf TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC COOK Date of Exam: 7/23/2018 Operating Test No.: SRO- X A E Scenarios P V Scenario 3 Scenario 4 Scenario 5 T M P E O I L N CREW CREW POSITION CREW POSITION CREW POSITION T N I T POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 1 0 0 0 1 0 1 0 0 0 0 0 3 1 1 0 NOR 1 0 0 0 0 0 1 0 0 0 0 0 2 1 1 1 SRO-I I/C 4 0 0 0 2 0 4 0 0 0 0 0 10 4 4 2 SRO-U MAJ 1 0 0 0 1 0 1 0 0 0 0 0 3 2 2 1 Pirtle TS 2 0 0 0 0 0 3 0 0 0 0 0 5 0 2 2 RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 RO NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 SRO-I I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.