Exam Rept 50-440/OL-89-02 on 890823.Exam Results:Senior Reactor Operator Passed Retake for Written Requalification Exam
ML20247C448
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/05/1989
From: Jordan M, Nejfelt G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20247C446 List:
References
50-440-OL-89-02, 50-440-OL-89-2, NUDOCS 8909130371
Download: ML20247C448 (3)


Text

_ _ -_ _ -

q U. S. NUCLEAR REGULATORY COMMISSION REGION III  !

Report NO. 50-440/0L-89-02 Docket No. 50-440 Licensee No. NPF-58 Licensee: The Cleveland Illuminating Company 10 Center Road Perry, OH 44081 Facility Name: Perry. Nuclear Power Station Examination Administered at: Ferry Nuclear Power Station Perry, OH Examinations Conducted: . August 23, 1989 Chief Examiner: G. M. Nejfelt / g S8 Approved by: M. J. Jordan l 7/d 67 Examination Summary Examination administered on August 23, 1989 (Report No. 50-440/0L-89-02))

One written requalification examinations was administered to a Senior Reactor Operator (SRO), who did not pass the initial written examination on June 29, 1989.

Results: The.SRO passed the retake for the written requalification examination. The parallel grading between the facility and NRC of examination results were within the guidance provided by NUREG-1021, ES 601.

I 8909130371 890908 j PDR ADOCK 05000440 V PDC

- - _ _ _ - _ _ . ._ _ - _ _ . __ __ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _____-_____a

.. . '~

DETAILS-

1. Examiner.

G. Nejfelt, Chief Examiner, USNRC, Region III

2. . Exit Meeting An exit meeting was con'ucted d on August 23, 1989, at Perry Training Center.

Cleveland Electric 111uminating' Company Representatives M. Wesley, Supervisor, Operations Licensing Training N. H. Johnson,.Jr.. Instructor, Licensing Training NRC Representative G. M. Nejfelt, Chief Examiner, USNRC At the Exit-Interview, the Chief Examiner commented that Requalification

' Examination Test Bank Material needs.to be revised to remove "True and False" type questions from bank. Until more definitive guidance is pro.vided in NUREG-1021, ES-601, the policy provided in ES-401 should be used to develop the question' format. The facility accepted this Comment.

3.. Examination Results Comparison A comparison of the examination results between the facility and the NRC

. grading.was identical.

4. Overall Requalification Program Evaluation The requalification program was previously assigned an overall program rating of satisfactory (See Report No. 50-440/0L-89-01).

1 2

)

Facility: Perry Nuclear Power Station Chief Examiner: G. M. Nejfelt Dates of Evaluation: August 23, 1989 Areas Evaluated: Written Examination Results:

R0 SRO Total Evaluation Pass / Fail Pass / Fail Pass / Fail (S, M, or U)

Written Examination 0/0 1/0 1/0 S Written Examination Grading: The facility grading identically matched the NRC grading.

Overall Program Evaluation Satisfactory (See Report No. 50-440/0L-89-01)

RI ( RIII ) II L U Nej elt/cg Jord , h W t 3 ,

_ _ _ _ _ _ - - - - - - - - . i