ML20247C448
| ML20247C448 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 09/05/1989 |
| From: | Jordan M, Nejfelt G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20247C446 | List: |
| References | |
| 50-440-OL-89-02, 50-440-OL-89-2, NUDOCS 8909130371 | |
| Download: ML20247C448 (3) | |
Text
_
q U. S. NUCLEAR REGULATORY COMMISSION REGION III Report NO. 50-440/0L-89-02 Docket No.
50-440 Licensee No. NPF-58 Licensee: The Cleveland Illuminating Company 10 Center Road Perry, OH 44081 Facility Name: Perry. Nuclear Power Station Examination Administered at:
Ferry Nuclear Power Station Perry, OH Examinations Conducted:. August 23, 1989 Chief Examiner:
G. M. Nejfelt
/
Approved by:
M. J. Jordan 7/d 67 l
Examination Summary Examination administered on August 23, 1989 (Report No. 50-440/0L-89-02))
One written requalification examinations was administered to a Senior Reactor Operator (SRO), who did not pass the initial written examination on June 29, 1989.
Results: The.SRO passed the retake for the written requalification examination. The parallel grading between the facility and NRC of examination results were within the guidance provided by NUREG-1021, ES 601.
I 8909130371 890908 PDR ADOCK 05000440 j
V PDC
_____-_____a
. '~
DETAILS-1.
Examiner.
G. Nejfelt, Chief Examiner, USNRC, Region III
- 2..
Exit Meeting An exit meeting was con'ucted on August 23, 1989, at Perry Training d
Center.
Cleveland Electric 111uminating' Company Representatives M. Wesley, Supervisor, Operations Licensing Training N. H. Johnson,.Jr.. Instructor, Licensing Training NRC Representative G. M. Nejfelt, Chief Examiner, USNRC At the Exit-Interview, the Chief Examiner commented that Requalification
' Examination Test Bank Material needs.to be revised to remove "True and False" type questions from bank. Until more definitive guidance is pro.vided in NUREG-1021, ES-601, the policy provided in ES-401 should be used to develop the question' format. The facility accepted this Comment.
3..
Examination Results Comparison A comparison of the examination results between the facility and the NRC
. grading.was identical.
4.
Overall Requalification Program Evaluation The requalification program was previously assigned an overall program rating of satisfactory (See Report No. 50-440/0L-89-01).
1 2
)
Facility: Perry Nuclear Power Station Chief Examiner:
G. M. Nejfelt Dates of Evaluation: August 23, 1989 Areas Evaluated: Written Examination Results:
R0 SRO Total Evaluation Pass / Fail Pass / Fail Pass / Fail (S, M, or U)
Written Examination 0/0 1/0 1/0 S
Written Examination Grading:
The facility grading identically matched the NRC grading.
Overall Program Evaluation Satisfactory (See Report No. 50-440/0L-89-01)
RI (
RIII
)
II L
U Nej elt/cg Jord h W
t 3
i