ML20247C448

From kanterella
Jump to navigation Jump to search
Exam Rept 50-440/OL-89-02 on 890823.Exam Results:Senior Reactor Operator Passed Retake for Written Requalification Exam
ML20247C448
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/05/1989
From: Jordan M, Nejfelt G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20247C446 List:
References
50-440-OL-89-02, 50-440-OL-89-2, NUDOCS 8909130371
Download: ML20247C448 (3)


Text

_

q U. S. NUCLEAR REGULATORY COMMISSION REGION III Report NO. 50-440/0L-89-02 Docket No.

50-440 Licensee No. NPF-58 Licensee: The Cleveland Illuminating Company 10 Center Road Perry, OH 44081 Facility Name: Perry. Nuclear Power Station Examination Administered at:

Ferry Nuclear Power Station Perry, OH Examinations Conducted:. August 23, 1989 Chief Examiner:

G. M. Nejfelt

/

S8 g

Approved by:

M. J. Jordan 7/d 67 l

Examination Summary Examination administered on August 23, 1989 (Report No. 50-440/0L-89-02))

One written requalification examinations was administered to a Senior Reactor Operator (SRO), who did not pass the initial written examination on June 29, 1989.

Results: The.SRO passed the retake for the written requalification examination. The parallel grading between the facility and NRC of examination results were within the guidance provided by NUREG-1021, ES 601.

I 8909130371 890908 PDR ADOCK 05000440 j

V PDC

_____-_____a

. '~

DETAILS-1.

Examiner.

G. Nejfelt, Chief Examiner, USNRC, Region III

2..

Exit Meeting An exit meeting was con'ucted on August 23, 1989, at Perry Training d

Center.

Cleveland Electric 111uminating' Company Representatives M. Wesley, Supervisor, Operations Licensing Training N. H. Johnson,.Jr.. Instructor, Licensing Training NRC Representative G. M. Nejfelt, Chief Examiner, USNRC At the Exit-Interview, the Chief Examiner commented that Requalification

' Examination Test Bank Material needs.to be revised to remove "True and False" type questions from bank. Until more definitive guidance is pro.vided in NUREG-1021, ES-601, the policy provided in ES-401 should be used to develop the question' format. The facility accepted this Comment.

3..

Examination Results Comparison A comparison of the examination results between the facility and the NRC

. grading.was identical.

4.

Overall Requalification Program Evaluation The requalification program was previously assigned an overall program rating of satisfactory (See Report No. 50-440/0L-89-01).

1 2

)

Facility: Perry Nuclear Power Station Chief Examiner:

G. M. Nejfelt Dates of Evaluation: August 23, 1989 Areas Evaluated: Written Examination Results:

R0 SRO Total Evaluation Pass / Fail Pass / Fail Pass / Fail (S, M, or U)

Written Examination 0/0 1/0 1/0 S

Written Examination Grading:

The facility grading identically matched the NRC grading.

Overall Program Evaluation Satisfactory (See Report No. 50-440/0L-89-01)

RI (

RIII

)

II L

U Nej elt/cg Jord h W

t 3

i