MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20205T1301999-04-0909 April 1999 Informs That on 990317,C Efin & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates Scheduled for Wks of 000710 & 17 for Approx 13 Candidates PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML20205B0571999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of Review of License Renewal Application for Ons,Units 1,2 & 3, That Staff Determines Has Generic Value to Industry ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 ML20207C0501999-02-25025 February 1999 Submits Annual Rept Specifying Quantity of Each of Principal Radionuclides Released to Environment in Liquid & Gaseous Effluents,Per 10CFR72.44(d)(3).Effluent Release from ISFSI for CY98 Was Zero PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML20203G5821999-02-17017 February 1999 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Released in Entirety. Documents Listed in App D Being Withheld in Part (Ref FOIA Exemption 5) ML20202F4761999-01-29029 January 1999 First Partial Response to FOIA Request for Documents.Records in App a Encl & Being Released in Entirety.App B Records Being Withheld in Part (Ref FOIA Exemption 7C) ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML20198S8721999-01-0707 January 1999 Responds to Message to Marks Re Info Request on Appeal Deadline & Desire to Serve Appeal Either by e-mail or by Alternative Regular Mail ML20198Q8871999-01-0707 January 1999 Responds to to Chairman SA Jackson Re Issues for Consideration for Commission During Oconee License Renewal Process.Commissioners Must Remain Impartial During Pendency of Case.Copy of Order LBP-98-33 Encl.Served on 990107 ML20198Q8971998-12-17017 December 1998 Expresses Concerns Re License Renewal of Duke Energy,Oconee Nuclear Station,Units 1,2 & 3.Commends NRC on Steps Agency Has Undertaken to Conclude Renewal Process.With Certificate of Svc.Served on 990107 ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs 05000269/LER-1998-012, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date1998-12-0303 December 1998 Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML20195J9101998-11-18018 November 1998 Forwards Notice of Withdrawal of Application for Amends to Facility Operating Licenses (Notice).Notice Has Been Filed with Ofc of Fr.Amends Would Have Revised TS to Eliminate HPCI Pump auto-transfer on High Suppression Pool Level ML20155F7201998-11-0303 November 1998 Final Response to FOIA Request for Documents.Documents Listed in App B Being Encl & Being Released in Entirety. Documents Listed in App C Being Withheld in Part (Ref Exemption 7C) 05000269/LER-1998-013, Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 9812021998-11-0202 November 1998 Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 981202 ML20155D2651998-10-23023 October 1998 Expresses Appreciation for Supporting Commission Initiative in Issuing Recent Statement of Policy on Conduct of Adjudicatory Proceedings.Case-specific Orders Were Issued in Calvert Cliffs & Oconee License Renewal Proceedings ML20155B1481998-10-21021 October 1998 Informs That as Result of Discussion of Issues Re Recent Events in Ice Condenser Industry,Ice Condenser Mini-Group (Icmg),Decided to Focus Efforts on Review & Potential Rev of Ice condenser-related TS in Order to Clarify Issues ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML20154A8971998-09-30030 September 1998 Requests That Submitted Info Be Attached to Amends to Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew Operating Licenses for Units 1,2 & 3 ML20154B9421998-09-30030 September 1998 Amends Chattooga River Watershed Coalition Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew OLs for Oconee Nuclear Station,Units 1,2 & 3 ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML20153H6881998-09-27027 September 1998 Requests Consideration of Motion to Enlarge Time Required to Submit Amended Petition to Intervene in Proceeding Re Application of Duke Energy Corp to Renew OLs for Facilities ML20153E4721998-09-24024 September 1998 Forwards Notices of Appearances for Attorneys Representing Duke Energy Corp,Applicant in Proceeding for License Renewal of Oconee Units 1,2 & 3.With Certificate of Svc ML20153D1831998-09-17017 September 1998 Ack Receipt of of Duke Energy Co Inviting Reconsideration of Denial by NRC CFO of Duke Exemption Request from Annual Fee Requirements for General License Under 10CFR171.11(d) 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 ML20207C0501999-02-25025 February 1999 Submits Annual Rept Specifying Quantity of Each of Principal Radionuclides Released to Environment in Liquid & Gaseous Effluents,Per 10CFR72.44(d)(3).Effluent Release from ISFSI for CY98 Was Zero PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML20198Q8971998-12-17017 December 1998 Expresses Concerns Re License Renewal of Duke Energy,Oconee Nuclear Station,Units 1,2 & 3.Commends NRC on Steps Agency Has Undertaken to Conclude Renewal Process.With Certificate of Svc.Served on 990107 ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs 05000269/LER-1998-012, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date1998-12-0303 December 1998 Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 05000269/LER-1998-013, Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 9812021998-11-0202 November 1998 Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 981202 ML20155B1481998-10-21021 October 1998 Informs That as Result of Discussion of Issues Re Recent Events in Ice Condenser Industry,Ice Condenser Mini-Group (Icmg),Decided to Focus Efforts on Review & Potential Rev of Ice condenser-related TS in Order to Clarify Issues ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML20154A8971998-09-30030 September 1998 Requests That Submitted Info Be Attached to Amends to Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew Operating Licenses for Units 1,2 & 3 ML20154B9421998-09-30030 September 1998 Amends Chattooga River Watershed Coalition Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew OLs for Oconee Nuclear Station,Units 1,2 & 3 ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML20153H6881998-09-27027 September 1998 Requests Consideration of Motion to Enlarge Time Required to Submit Amended Petition to Intervene in Proceeding Re Application of Duke Energy Corp to Renew OLs for Facilities ML20153E4721998-09-24024 September 1998 Forwards Notices of Appearances for Attorneys Representing Duke Energy Corp,Applicant in Proceeding for License Renewal of Oconee Units 1,2 & 3.With Certificate of Svc IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved ML20151S7501998-08-31031 August 1998 Provides Update on Commitment Made by Licensee in Response to NOV & Imposition of Civil Penalty Re Valves in Ldst Instrument Lines That Were Incorrectly Translated Into Station Procedures IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML20236V9581998-07-27027 July 1998 Forwards Corrected Pages 3.5-30b of 961211 & 3.16-2 of 970205 TS Bases.Old Amend Numbers Were Left on Pages.Rev Changes Footer on Both Pages to Reflect Bases Changes ML20153D1961998-07-0909 July 1998 Requests NRC Reconsider & Grant Util Request for Exemption from Duplicative License Fee Under 10CFR171.11(d) for Storage of Spent Nuclear Fuel at Oconee Nuclear Station ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML20247G0881998-05-14014 May 1998 Provides Rev 2 to Section 3.3, Instrumentation, in Support of TS-362 Amend Request.Position on Testing of Analog Trip Type Instruments W/Regard to Transition from CTS to ITS, Restated.Summary Description of Its/Bases Changes,Encl ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document 05000269/LER-1998-002, Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown1998-04-30030 April 1998 Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event ML20217G0351998-03-26026 March 1998 Submits Ltr to Update Commitment Made by Oconee in Response to Subject Violation.Update Assures That Details of Particular CA Are Appropriately Contained in Docketed Correspondence 1999-09-08
[Table view] |
Inspection Report - Oconee - 1992023 |
---|
|
|
Text
ACCELERATEDDOCUMENTDISTRIBUTIONSYSTEMREGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ACCESSIONNBR:9303250120DOC.DATE:93/03/19NOTARIZED:NO=DOCKETCIL:50-387SusquehannaSteamElectricStation,Unit1,Pennsylva0500038750-388SusquehannaSteamElectricStation,Unit2,Pennsylva05000388AUTH.NAMEAUTHORAFFILIATION"KEISERgH.W.PennsylvaniaPower&LightCo.RECIP.NAMERECIPIENTAFFILIATIONHODGES,M.W.Region1(Post820201)r
SUBJECT: RespondstoNRC930210ltrreviolationsnotedininsprepts50-287/93-23&50-388/93-23.C/As:surveillanceprocedureswillberevisedtoaddresstypesoffirebarriermatltobeinspectedtoprovideacceptancecriteriaforfirebarrier.DISTRIBUTIONCODE:IE01DCOPIESRECEIVED:LTRENCLSIZE:TITLE:General(50Dkt)-InspRept/NoticeofVioationResponseNOTES:RECIPIENTIDCODE/NAMEPD1-2PDINTERNAL:ACRSAEOD/DSP/TPABDEDRONRR/DRCH/HHFBPTNRR/DRSS/PEPBNRR/PMAS/ILPB2DIR-REGIL02RGNIFILE01EXTERNALEG&G/BRYCEgJ~H~NSICCOPIESLTTRENCL112211111111111111111111RECIPIENTIDCODE/NAMECLARK,RAEOD/DEIBAEOD/TTCNRR/DORS/OEABNRR/DRIL/RPEBNRR/PMAS/ILPBlNUDOCS-ABSTRACTOGC/HDS2RESMORISSEAUiDNRCPDRCOPIESLTTRENCL11111111111111111111'DNOTETOALL"RIDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASTEICONTACTTHEDOCUMENTCONTROLDESK,ROOMPI-37(EXT.504-2065)TOELIMINATEYOURNAMEFROMDISTRIBUTIONLISTSFORDOCUMENTSYOUDON'TNEED!DTOTALNUMBEROFCOPIESREQUIRED:LTTR23ENCL23 PennsylvaniaPower8LightCompanyTwoNorthNinthStreet~Allentown,PA18101-1179~215/774-5151HaroldW.KeiserSeniorVicePresident-Nuclear215/7744194MAR191993Mr.MarvinW.Hodges,DirectorDivisionofReactorSafetyU.S.NuclearRegulatoryCommissionRegionI475AllendaleRoadKingofPrussia,PA19406SUSQUEHANNASTEAMELECTRICSTATIONREPLYTONOTICEOFVIOLATION(EA92-234)(387/92-23&388/92-23)PLA-3933FILER41-2DocketNos.50-38750-388
DearMr.Hodges:
ThisletterprovidesPennsylvaniaPower&LightCompany'sresponsetotheNoticeofViolation(EA92-234)forNRCCombinedInspectionReport50-387/92-23and50-388/92-23.TheNoticeofViolationwasdatedFebruary10,1993.Thenoticerequiredsubmittalofawrittenreplywithinthirty(30)daysofthedateoftheletter.However,asdiscussedwithMr.JohnR.WhiteofNRCRegionIonFebruary19,1993,PPkLhasbeenauthorizedtodelaytheresponseuntilMarch19,1993.Wetrustthatthecommissionwillfindtheattachedresponseacceptable.Verytrulyyours,KeiserAttachmentCC:NRCDocumentControlDesk(original)Mr.G.S.Barber,NRCSr.ResidentInspectorMr.R.J.Clark,NRCSr.ProjectManagerRegionI-RegionalAdministrator9303250i209303i9PDRADOCK050003878PDR ATTACHMENTTOPLA-3933FILER41-2PAGE1OF10REPLYTOANOTICEOFVIOLATIONA.ViolationA(387/92-23-07;388/92-23-07)TechnicalSpecification3.7.7states:"Allfireratedassemblies,includingwalls,floor/ceilings,cabletrayenclosuresandotherfirebarriersseparatingsafetyrelatedfireareasorseparatingportionsofredundantsystemsimportanttosafeshutdownwithinafirearea,'ndallsealingdevicesinfireratedassemblypenetrations,includingfiredoors,firewindows,firedampers,cableandpipingpenetrations,sealsandventilationsealsshallbeOPERABLE."TechnicalSpecification4.7.7.1.states:"EachoftheaboverequiredratedassembliesandsealingdevicesshallbeverifiedOPERABLEatleastonceper18monthsbyperformingavisualinspectionof:a.Theexposedsurfacesofeachfireratedassembly."Contrarytotheabove,betweenDecember1989andSeptember4,1992,theexposedsurfacesofeachfireratedassemblyconstructedofKaowoolandthegypsumboardenclosuresinFireZones0-28Aand0-28Bhadnotbeenverifiedoperable.~ResonseSeeLER50-387/92-015-01foradditionaldetails.1.ReasonortheViolationSurveillanceoftheexposedsurfacesofKaowoolforstationcommonareaswasnotadequatelyperformedbetweenJuly1990andDecember1992,andgypsumboardenclosuresinFireZones0-28Aand0-28BwerenotsurveilledbetweenDecember1989andSeptember4,1992duetoinadequaciesinsurveillanceprocedureSM-013-013.This"procedure,whichwasrevisedin1990,didnotspecificallyidentifyKaowoolandgypsumboardasbeingfirebarriermaterial.Consequently,personnelperformingthesurveillancewerenotcognizantthatKaowoolandgypsumboardenclosurebarriermaterialsweretobesurveilled.Theproceduralweaknesses(contributingfactors)inthe1990revisionwere:Deletionofspecificracewaysrequiredtobesurveilled.TheracewaydesignationswerereplacedwithareferencetoincorrectC-1700seriesdrawingsthatidentifiedracewaylocations.(seeViolationB)
-ATTACHMENTTOPLA-3933FILER41-2PAGE2OF10Alackofadescriptionoffire.barriermaterialtobeinspected,and2.CorrectiveStesWiiichHaveBeenTakenandtheResultsAchieved:,a.KaowoolfirebarriermaterialwassurveilledincommonplantareasinDecember1992.GypsumboardenclosuresinFireZones0-28Aand0-28BweredeclaredinoperableonJanuary5,1993andsubsequentlyhavebeenredesignedandarecurrentlybeingreinstalledtoapprovedULdesign.b.AdditionaltrainingandengineeringoverviewwereprovidedtopersonnelperformingtheDecember1992andJanuary1993surveillances.3.CorrectiveStesWhichWillBeTakentoAvoidFurtherViolations:a.SurveillanceproceduresSM-013/113/213-013willberevisedtoaddressthetypesoffirebarriermaterialtobeinspectedandtoprovideappropriateacceptancecriteriaforeachtypeoffirebarrier.TheseprocedureswillberevisedbyApril30,1993.b.SurveillancesrequiredbySM-013/113/213-013willbereperformedbeginninginMay1993andwillbecompletednolaterthanthestartupfollowingtheUnit2sixth'efuelingandinspectionoutagecurrentlyscheduledtoendonMay20,1994.Individualsperformingthesesurveillanceswillreceivetrainingontherevisedsurveillanceprocedurespriortoperformingthesurveillances.4,DateoFullCornliance:Basedon(2a)above,PPEcLisinfullcomplianc ATTACHMENTTOPLA-3933FILER41-2PAGE3OF10B.ViolationB(387/92-23-08)TechnicalSpecification6.8.1states,inpart,thatwrittenproceduresshallbeimplementedfortheFireProtectionProgram.ProcedureNDI-QA-15.3.1,Revision3,FireProtectionProgram,states,inpart:"ThisNDIoutlinestheuniqueresponsibilitiesandinterfacesrequiredtoimplementtheFireProtectionProgram."Attachment1,"FireProtectionFeaturesAndActivitiesRequiringQuality,"ofNDI-QA-15.3.1specified,inpart,that:"Qualityrequirementsshallbe,appliedtothefireprotectionfeaturesinthefollowingareas:-a.Unit1ReactorBuilding;...d.ControlStructure;...j.FirebarrierwrappingidentifiedasbeingwrappedtomeetAppendixR(10CFR50)inDrawingsE294andE295;k.Fire-ratedwalls,fire-ratedfloors,...fire-ratedpenetrationsealswithinandenclosingtheaboveareas(asspecifiedonengineeringdrawings)Contrarytotheabove,asofSeptember4,1992,thefollowingareexamplesfoundwhereprocedureshadnotbeenproperlyimplementedand,therefore,adequatequalitywasnotappliedtotwoseriesofdesigndrawingsforrequiredfireprotectionfeaturesintheUnit1ReactorBuildingandControlStructure.~DrawingE-294didnotshowKaowoolasfirebarrierwrapmaterialonconduitsA1P105,C1P107,andA1P071inFireZone0-28HlocatedintheControlStructure.~OneoftheC-1700seriesofdrawings,DrawingC-1754,failedtoshowcorrectlytheconduitrunforconduitsE1P353andC1P077inFireZone0-28B-IlocatedintheControlStructure.~DrawingC-1721,SheetNo.2,Revision1,andE-294omittedshowingthatconduitsE1K586andE1K758werewrappedwithThe'rmo-LagwheretheyenteredFireZone1-2DlocatedintheControlStructure.~DrawingE-294,hadnodesignationinthetitleblockindicatingthequalitylevelofthedrawing,andtheC-Seriesdrawingswereincorrectlylabelledinthetitleblock"NONQUALITY-RELATED."
ATTACHMENTTOPLA-3933FILER41-2PAGE4OF10~AdditionalexampleswherequalitywasinadequatelyappliedtothesetwoseriesofFireProtectiondesigndrawingsareidentifiedinSection5.1andAttachment3ofRegionIInspectionReport50-387and388/92-23andareconsideredpartofthisviolation.~Resense1.ReasonortheViolationTheerrorsintheReactorBuildingsandControlStructureE-294/295andC-1700seriesdrawings,utilizedforfireprotectionactivities,resultedfrominadequatedrawingverificationswhenthedrawingswereoriginallydeveloped.Followinginitialinstallationoffirebarriers(installedunderanonquality-relatedprogram),PP&LrequestedthatourA/Edevelopdrawingstoidentifythelocationoftheinstalledfirebarriers.Thesedrawings,E-294/295,wereneverfieldverifiedastofirebarrierlocationsortypeofmaterialutilized.TheC-1700seriesdrawingswhichidentifyracewaylayoutsweresubsequentlydevelopedutilizingtheE-294/295drawings.NofieldverificationswereperformedontheC-1700seriesdrawingsexceptforplantmodificationworkactivitiesthatutilizethesedrawings.Thesedrawingerrorswerethenpropagatedinsurveillanceprocedures(seeViolationA),engineeringstudiesandcalculationsthatutilizedinputsfromthesedrawings.Plantmodificationswerefieldverifiedpriortoinstallation.SeeViolation"C"foradditionaldeficienciesidentifiedfromthiswalkdown.2.CorrectiveStesWhichHaveBeenTakenandtheResultsWhenthedrawingerrorswereidentified,PP&Linitiatedacomprehensivewalkdownofplantareasthatcontainedfireratedracewaywrap.Allaccessibleracewayshavebeeninspected.Drawingerrorshavebeencorrected.Additionally,DrawingChangeNoticeshavebeenattachedtodrawingstoidentifytheactualfirebarriermaterialinstalledifmischaracterizedonthedrawings.Further,engineeringstudiesandcalculationswhichutilizedthesedrawingshavebeenreviewedandcorrected,wherenecessary.3.CorrectiveStesWhichWillBeTakentoAvoidFurtherViolations:a.TheappropriateclassificationoftheE-294/295andC-1700seriesdrawingsarebeingdispositionedandwillbemaintainedas"as-built"drawings.Additionally,byrevisionorattachment,thenotation"Quality-F"willbeaddedtothetitleblockofthesedrawings.TheestimatedcompletiondatefortheseactivitiesisApril30,1993.b.InaccessibleareawalkdownswillbecompletednolaterthanthestartupfollowingtheUnit2sixthrefuelingandinspectionoutagecurrentlyscheduledtoendonMay20,199 ATTACHMENTTOPLA-3933FILER41-2PAGESOF104.DateoFu1lComliance:PPEcLwillbeinfullcompliancenolaterthanthestartupfollowingtheUnit2sixthrefuelingandinspectionoutagecurrentlyscheduledtoendonMay20,199 ATTACHMENTTOPLA-3933FILER41-2PAGE6OF10C.ViolationC(387/92-23-06)TheSusquehannaSteamElectricStationUnit1FacilityOperatingLicense,NPF-14,wasamendedonMarch27,1990,byAmendment95toreviseLicenseCondition2.C.(6),whichstates,inpart:~"PennsylvaniaPower8LightCompanyshallimplementandmaintainineffectallprovisionsoftheapprovedfireprotectionprogramasdescribedintheFireProtectionReviewReportforthefacilityandasapprovedintheNRCSafetyEvaluationdatedAugust9,1989...."Table5.0-1,partC.4,"Inspection,"oftheFireProtectionReviewReportundertheheadingof"SusquehannaSESCompliance"states,inpart,thatfieldpersonnelwitnessedthefireprotectioninstallationandverifiedconformancewithdesigndrawings.BechtelSpecification8856-E-61,Revision1,"TechnicalSpecificationforElectricalRacewayFireInsulationBarrierMaterialsfortheSusquehannaSteamElectricStationUnits-1and2ofthePennsylvaniaPowerALightCompany,Allentown,Pennsylvania,"wasSusquehannaSteamElectricStation's(SSES)designspecificationforinstallingsafeshutdowncableracewayfirebarriersduringconstruction.DrawingA-107,Revision21,"ControlStructureUpperCableSprdgRm-El744'-0"BatteryRoom-'El771'-0","describesconstructionfeaturesanddetailsofgypsumboardenclosuresusedtoprovideAppendixRprotectionforredundantsafeshutdownelectricalcircuitsandcircuitbreakers..1.BechtelSpecification8856-E-61,paragraph6.4.6,statesthatZetexshallhaveaminimum3inchoverlap.Contrarytotheabove,onAugust27,1992,inFireZone0-28H,theColdInstrumentShop,anapproximately20squareinchestriangularsectionofKaowoolwasnotcoveredwithZetexandtheZetexdidnothavethespecified3inchoverlap.2.BechtelSpecification8856-E-61,paragraph6.4.11,statesthatwheretheracewaypenetratesafirebarrierwallthejuncturewillthenbesealedwithmasticcoatingtonotlessthan1/4inchthicknessandshallnotextendlessthan8inchesontotheexterioroftheblanketandsurfaceofthefirebarrierandwall.Contrarytotheabove,onSeptember1,1992,inFireZone1-4A-N,aconduitD1P008firebarrierwrapjunctionatafireratedwallwasobservednottobesealedwithmasticcoatingtothespecifiednotlessthan1/4inchthicknessandtonotlessthan8inchesontotheexterioroftheblanketandsurfaceofthefirebarrierandwal ATTACHMENTTOPLA-3933FILER41-2PAGE7OF103.DrawingA-107,Detail4,Eley.,providesdetailsofaonehourgypsumfirebarrierenclosurewithanairgapbetweentheinnerandoutergypsumboard.Contrarytotheabove,asofSeptember4,1992,inFireZone0-28B-II,aone-hourratedelectricalbreakerenclosurefabricatedwithgypsumboarddidnothavetheairgapbetweentheinnerandoutergypsumboardmakingupthefirebarrierenclosureasspecifiedbytheinstallationdrawing,A-107,indrawingdetailnumber4.4.AdditionalexampleswhereSSES'srequiredfireprotectionqualityassuranceinspectionsfailedtoidentifyinstallationdeficienciesthatwerenotinconformance-tothedesignspecificationsaredetailedinSection4.3.4andAttachment3ofRegionIInspectionReport50-387&,388/92-23andareconsideredpartofthisviolation.~Resossse1.ReasonortheViolationThisviolationincorporatesnoncompliancesassociatedwithinadequatesurveillanceprocedureacceptancecriteriaanddiscrepancieswithinitialconstructiondesigndocuments.Inadequatesurveillanceprocedureacceptancecriteria(seeViolationA)resultedinthefollowingnonconformancesgoingundetected:tomZetexinFireZone0-28H,andtheinterfacebetweentheracewaywrapandthewallwasnotsealed.ThegypsumboardconstructiondeficiencyinFireZone0-28B-IIwouldonlyhavebeenidentifiedanddispositionedatthetimeofconstruction.InitialconstructionoffirebarriersattheSusquehannaSESwerenotquality-relatedactivitiesandinspectionsofworkactivitiesweredeterminedbyresponsiblefieldengineers.Norequirementexistedstatingthatallactivitiesbeinspected.Additionally,documentationassociatedwithconstructionofnon-qualityinspectionactivitieswasonlyrequiredtobemaintaineduntilsystemturnovertoPP&L.Nodocumentationonthegypsumboarddeviationwaslocated,thereforethereasonforthisviolationcannotbedetermined.,Inanycasethisdeficiencywouldnothavebeenidentifiedthroughnormalsurveillanceactivities.2.CorrectiveStesWhichHaveBeenTakenandtheResultsAchieved:Acomprehensivewalkdownoffireratedracewaywrapinaccessibleareaswasconducted(seeViolationB).Resultsofthesewalkdownsidentifiedthreeracewayswithincorrectmaterials,approximatelyadozenminordiscrepancies,approximatelytwentyminormaintenanceconcerns(wearandtearitems),andvariousdrawingdiscrepancies.ThecompletiondateoftheactionsassociatedwiththesedeficienciesisestimatedtobeApril30,199 'ATTACHMENTTOPLA-3933FILER41-2PAGE8OF103.CorrectiveStesWhichWillBeTakentoAvoidFurtherViolations:a.Enhancedsurveillanceprocedureswillidentifythetypeofissuesnotedinthisviolation;therefore,additionalactionsarenotrequired.b.TheimproperlyinstalledgypsumboardenclosureinFireZone0-28B-IIisbeingredesigned.ThisnewdesignisscheduledtobeinstalledbyApril30,1993.c.ActionsassociatedwiththedrawingwalkdowndeficienciesarescheduledtobecompletedbyApril30,1993.Anydeficiencies-identifiedininaccessibleareasbytheperformanceoftherevisedsurveillancewillbedispositionedandresolvedthroughcurrentlyestablishedprocesses.4.DateoFullComliance:PALwillbeinfullcomplianceuponinstallationoftheredesigngypsumboardenclosurein.FireZone0-28B-IIandtherepairofotherdiscrepanciesnotedin(3)above.Theidentifiedactivitiesarescheduledtobe.completedbyApril30,199 ATTACHMENTTOPLA-3933FILER41-2PAGE9OF10C..ViolationD(387/92-23-04)TheFacilityOperatingLicense,NPF-14,wasissuedonJuly17,1982,forSusquehannaSteamElectricStationUnit1andcontainedacondition,2.C.(7),BatteryRoomArea[Section9.5.4,SafetyEvaluationReport(SER),SupplementalSafetyEvaluationReportSSER¹1andSSER¹3]statedthat:r"Priortoexceedingfivepercentof-fullpowerandsubjecttoNRCreviewandapproval,PP&Lshalleitherconductatanapproved'testinglaboratoryanASTME-119testoftheas-installedone-hourcablewrapconfigurationorinstallanautomaticfireextinguishingsystem."TheFacilityOperatingLicense,NPF-14wasamendedonMarch27,1990,byAmendment95toreviseLicenseCondition2.C.(6),whichstatesinpart:"PennsylvaniaPower&LightCompanyshallimplementandmaintainineffectallprovisionsoftheapprovedfireprotectionprogramasdescribedinthefireProtectionReviewReportforthefacilityandasapprovedintheSafetyEvaluationdatedAugust9,2989..."Contrarytotheabove,asofSeptember4,1992,SusquehannaSteamElectricStationwasfoundtohaveaKaowoolwrapfirebarrierinstalledinFireZone0-28H.,PP8rLdidnotsubjectthisKaowoolcablewraptoanASTME-119testatanapprovedtestinglaboratoryandPPALdidnotsubmitthisKaowoolcablewrapconfigurationtotheNRCforreviewandapprovalforuseinUnit1BatteryRoomArea,FireZone0-28H,attheSusquehannaSteamElectricStation.ThereisnoautomaticfireextinguishingsysteminstalledinUnit1BatteryRoomArea,FireZone0-28H.AdditionalexamplesofhowSSES'suseofKaowoolinFireZone0-28HdonotmeettherequirementsofDeviationRequest8or17oftheSusquehannaSteamElectricStationFireProtectionReviewReportaredocumentedinRegionIInspectionReport50-387/92-23andareconsideredpartofthisviolation.~Resonse1.ReasonortheViolationDeviationRequestNo.17oftheSusquehannaSteamElectricStationFireProtectionReviewReportrequestedadeviationfromtherequirementsof10CFR50,AppendixR,SectionIII.G.2.ctopermittheuseofKaowoolasaone-hourfirebarrierinplantareaswhereKaowoolwasalreadyinstalled.Thisdeviationrequestwasaconservativeactionintendedtodocumenttheplantconfiguration.KaowoolwasacceptedbytheNRCasan ATTACHMENTTOPLA-3933FILER41-2PAGE10OF10adequateonehourfirebarrierin,GenericLetter86-10whichwasissuedpriortorequestingthisdeviation.Thedeviationrequestlistedtheaffectedfireareas/zoneswhereKaowoolisinstalled.ThedeviationrequeststatedthatfirezonesthatcontainedKaowoolalsohadautomaticfiredetectionandsuppressioninstalled.PPEcLdidnotrecognizethatKaowoolwasinstalledinFireZone0-28HinDeviationRequestNo.17becauseofincorrectdrawingsusedtodeveloptheRequest(seeViolationB).DeviationRequestNo.8oftheSusquehannaSteamElectricStationFireProtectionReviewReportrequestedadeviationfromtherequirementsof10CFR50,AppendixR,SectionIII,G.2.atopermittheuseofaone-hourfirebarriertoseparateredundantsafeshutdownequipment/cablesinFireZone0-28B-I,0-28B-II,1-2D,and0-28Hwhenautomaticsuppressionisnotpresent.InrespondingtoDeviationRequestNo.8,NRCimplementedLicenseCondition2.C.7inOperatingLicenseNPF-14forSusquehannaUnit1whichrequiredPPEcLtoeitherconduct"atanapprovedtestinglaboratoryanASTME-119testoftheas-installedone-hourcablewrapconfigurationorinstallanautomaticfireextinguishingsystem."SincePPALdidnotrecognizethatKaowoolwasinstalledinFireZone0-28H,wedidnotprovideanASTME-119testasrequiredbythisLicenseCondition.2.CorrectiveStesWhichHaveBeenTakenandtheResultsAchieved;TheKaowoolfirebarriersin0-28Hwerereplacedwithpre-formedThermo-Lagfirebarriermaterial.3.CorrectiveStesWhichWillBeTakentoAvoidFurtherViolations:EKaowoolfirebarriermaterialwillnotbeutilizedfornewfirebarrierinstallations.ExistingKaowoolfirebarriersinuseatSusquehannaSESarebeingmaintained.4.DateoFullComliance:BytakingtheactionsrequiredbyBulletin92-01andSupplement1,PPEcLisinfullcompliancewithThermo-Lagfirebarriermaterialrequirements.