Summarizes Telcon W/Individuals Ref by T Young Re Insp of Electrical Trending
ML20237L711
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/09/1986
From: Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Emerson M
NRC
Shared Package
ML20237F760 List: ... further results
References
NUDOCS 8708200307
Download: ML20237L711 (2)


Text

W* 4 f

DO NOT DISCLOSE Jamary 9, 1986 E-x a , 67 330. I5

! NEMORArtDUM POR:

Mark Emerson, A1101ation Coordinator TROM:

T. P. Westerman. Chief Comanche Peak Recion IV Group 1 EUBJECT:

! A11ecation 4-85-A-121 Individual A & B.I telephoned two individuals referenced by tum Young (Att achment I-j was it offered. Neither individual requested confidentiality nor Project Assistant Corp.(PAC) Individual A stated he is leaving his present employer

! io leaving the site with the termination of the PACand is going 1986. to work Individual D for TUGCO.

contract on January 17, i

Ecch made the following statements:

Individual A 1.

Stated he had no concerns.

2.

but that he was not aware of nany trending.

ngs problems with elS ectrical l

t

(

Individual B

1. l Dio not identify any problems with electrical t

rending.

2.

He stated he did have a concern with inspecti on records of electrical terminations same as recorded on the inspection report.

when e the lugs were no ons sign ofoffterininm1 brand was for teminal blocks with The lugsinspection when the a t block didn't use lugs. c ual 3.

off the findings since the lugso did write not existHe stated this did not address the generic problestmproper doemmentation.

ofHe i felt RIV CPG ENOT DISCLOSE WO cte.rmansww

/9/86 h

G O 5 5 l

~

f i erson ' DO NOT DISCIDEE .,

Jan. 9, 1986 '

4. Re recomunended that the SRRR reject files would identify all unsatisfactory inspector / inspection issues and that these could then be tracked to review QE corrective actions.
5. He stated he knew of no real hardware problems.
6. He indicated be did not trust the Safe Team.

T. F. Westerman, Chief Comanche Pea. Region IV Group Encitsures Attachment 1 CCs C. Eale w/o att i