ML20212C223

From kanterella
Revision as of 15:54, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Hand Marked Drawings for PDR Provided by S&L During 970813 Meeting.Addl Copies of Drawings Are Being Forwarded Directly to Local PDR Near Plant at Waterford Public Library,Waterford,CT.W/50 Oversize Drawings
ML20212C223
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/27/1997
From: Reynolds S
NRC (Affiliation Not Assigned)
To: Yeates E
NRC (Affiliation Not Assigned)
Shared Package
ML20212C228 List:
References
NUDOCS 9710290109
Download: ML20212C223 (1)


Text

_ _ _ _ _ -_ _ _ _ _ _ _ _ _ _ _ _ _ _ - -_

k f,' hg

~

jf* _

\ .

3- ', - UNITF.D STATES -

j i NUCLEAR REGULATORY COMMISSION-

", $~ WASHINGTON, D.C. 30646-0001

% Arjust 27,1997-x sf; MEMORANDUM TO: Elizabeth J. Yeatesl Chief Public Documents Branch Office of Information Resources Management FROM: ' Steven A! Reynolds, Chief w 4 ICAVP Oversight Branch Special Projects Office Office of Nuclear Reactor Regulation 37 AUG 28 P223

SUBJECT:

HAND MARKED DRAWINGS FOR T}fFgUBLIC MCUMENT ROOM '

- FROM THE AUGUST 13,1997, MEETit4d%E% ENTl4E NRC, NORTHEAST UTILITIES, AND SARGENT & LUNDY ON MILLSTONE UNIT 3 IC WP SYSTEM BOUNDARIES The enclosed hand marked drawings were provided to the NRC by Sargent & Lundy (S&L) during an August 13; 1997, publicly observed meeting at the Millstone Nuclear Power Station.

The pu, pose of the meeting was for S&L and the NRC to outline the system boundaries for the Auxiliary Building Heating Ventilation and Air Conditioning System (Aux. Bldg HVAC),

Supplementary Leak Collection and Release System (SLCRS), and the Diesel Generator, including its support systems (DGX) to Nortteast Utilities (NU). The Aux. Bldg HVAC, SLCRS, and Diesel Building HVAC have a combined system designator of HVX. These systems are being reviewed by S&L as part of the Independent Corrective Action Verification Program (ICAVP) requi ed by an August 14,1996, Confirmatory Order for the Millstone Nuclear Power Station.

To enable the public to have access to these drawings, I request that the enclosed drawings be placed in the NRC's Public Document Room (PDR). Additional copies of these drawings are being forwarded directly to the local PDRs near the Millstone Nuclear Power Station at the Waterford Put;lic Library, in Waterford, CT, and at the Leamlng Resource Center of Three Rivers Community Technical College in Norwich, CT, if you have any questions regarding the disposition of the enclosed drawings, please contact me at (301) 415 - 1332, or e-mail SAR1.

Enclosure; Hand marked System Boundary Drawings for Millstone Unit 3 p PPM

. esimpinii

~

9710290109 970827 PDR ADOCK 05000423 P PDR 4 -j Ri i_ - . - .

d

! OVERSIZE DOCUMENT I

PAGE(S) PULLED l

mammmmmmmmmmmmmmmmmmmmmmmmm ,

SEE APERTURE CARD FILES l' ,

APERTURE CARD / PAPER COPY AVAILABLE THROUGH NRC FILE CENTER NUMBER OF OVERSIZE PAGES FILMED ON APERTlin TARD(S)

ACCESSION NUMBERS OF OVERSIZE PAGES

i f

I i

)-

l l

i 1.

! o 4.

t_._