ML20209B275

From kanterella
Revision as of 17:44, 11 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to 850805 Memo,Action Item 8(f), Staff Actions Resulting from Investigation of 850609 Davis-Besse Event (NUREG-1154). Encl Final Rept Documents AEOD Finds, Conclusions & Recommendations Resulting from Study
ML20209B275
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/20/1986
From: Heltemes C
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20209B180 List:
References
RTR-NUREG-1154 AEIOD-C602, AEOD-C602, NUDOCS 8609080204
Download: ML20209B275 (2)


Text

, August 20, 1986 MEMORANDUM FOR: Victor Stello, Jr.

Executive Director for Operations AE0D/C602

.FROM: C. J. Heltemes, Jr., Director Office for Analysis and Evaluation of Operational Data

SUBJECT:

CASE STUDY REPORT - OPERATIONAL EXPERIENCE INVOLVING TURBINE OVERSPEED TRIPS This memorandum is our response to staff action Item 8(f) enclosed with the August 5,1985 ED0 memorandum: " Staff Actions Resulting from the Investigation of the June 9, 1985 Davis-Besse Event (NUREG-1154)." This action item requested that AE00 conduct a review of past operating experience and determine the causes for overspeed turbine trips of the AFW pump turbines.

We have completed the study requested by this action item. A total of 128 events involving overspeed trips of steam turbines in PWR and BWR plants during the period from January 1972 to September 1985 were identified and evaluated in the study. The principal causes for the reported turbine overspeed trips have been identified by.our review and assessment of these events.

The. enclosed final: report documents our findings, conclusions, and recommendations resulting from the study. This report reflects comments received as a result of the peer review process. By separate memorandum, the enclosed AE0D report and recommendations have been forwarded to NRR and IE for appropriate action.

I would be pleased to provide-any clarification or further information that you may desire.

onsines sened tv c.J.Honomse &

C. J. Heltemes, Jr. , Director Office for Analysis and Evaluation of Operational Data

Enclosure:

As Stated cc: See next page 8609030204 860902 6 DR ADOCK 0500

C Victor Stello cc w/o enclosure J. H. Sniezek, DEDR0GR H. R. Denton, NRR J. M. Taylor, IE D. F. Ross, RES T. E. Murley, RI J. N. Grace, RII J. G. Keppler, RIII R. D. Martin, RIV J. B. Martin, RV D. Humenansky, OCM DISTRIBUTION:

PDTl AE0D SF AE0D CF ROAB SF ROAB CF CHsu MChiramal SRubin WLanning KBlack MWilliams FHebdon CHeltemes s

OFC : R064  : SG:JOAB  : BC:ROAB  : DD:A D  : D:AE0D  :  :

__---:_ Q a y(ge__: JF,fp, ____:__--<3jf__:-_-__-___--_:--_---__--_

,NAME : CHsu:as  : MChif,m-e___:-______-___:--

al : SRubin I: 3_#' : CHeltfpes :  :

-_-__:-__-_-_____-:_-__________:-_-_____ l}_:_F ___ _______:------_---__:__--__--__-_:-_-_-__--__

DATE : 8//f/86  : 8//s/86  : 8/l5/86  : 8/10 /86  : 8/4(V86  :  :

OFFICIAL RECORD COPY

- - _ _ ._ . .-