D C. O 4p%
'JUN 161988 MEMORANDUM FOR: Hubert J. Miller, Director, Division of Reactor Safety FROM:
Edward G. Greenman, Director, Division of Reactor Projects
SUBJECT:
DAVIS BESSE ENGINEERING INSPECTION DRP-07 The licensee's independent Safety Engineering Group (ISEG) recently performed a safety system outage modification inspection (SSOMI) on a modification involving the auxiliary feed water system.
This inspection revealed several instances of inadequate engineering review including one which resulted in the licensee not meeting the single failure criteria. The licensee stated during the May 31, 1988, management meeting that all of the review discrepancies other than the single failure discrepancy had been identified by it during the design process. The ISEG report dated May 16, 1988, was an interim report and the final report should be issued by July 1, 1988.
In addition, the resident inspectors have noted several other instances of inadequate engineering review.
Licensee comments made during the May 31, 1988, meeting did not resolve all of the NRC concerns.
In order to enhance our confidence in the licensee's effort an inspection of the engineering design review is requested during the July-August time frame. Should you have any questions contact Paul Byron or R. C. Knop (Ext. 547) of my staff.
p0riginal ${gr.d by LC. Crc 0Wr?
Edward G. Greenman, Director Division of Reactor Projects 8808040207 88C$16 PDR ADOCK 05000346 g
PDC h5 (8C G+
"'jbg 3, $,
RI y
DeFayette Knop Greenman d
[
g, S I@l '