Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl
ML20155K200
Person / Time
Site: Davis Besse, Palisades, Perry, Fermi, Kewaunee, Point Beach, Cook, LaSalle, 05000000
Issue date: 03/09/1988
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20155K026 List:
References
FOIA-88-165 NUDOCS 8806210137
Download: ML20155K200 (22)


Text

[M$ $

a a

gt;, - ) L 5 FD1h

%m,. " '*/

4 WAR 0 91983 MEMORANDUM FOR:

A. Bert Davis, Regional Administrator, R!!!

FROM:

Edward G. Greenman, Director, Division of Reactor Projects

SUBJECT:

TOPIC FOR SENIOR MANAGEMENT MEETING One of the topics suggested by ORP for the subject meeting was the NRCs role in obtaining vendor support to solve equipment problems. - In response to our suggestion you asked DRP to provide background information and examples where Region 111 plants have had vendor support problems and suggestions for addressing the issues.

The following is a partial listing of facilities where vendor support has been a problem, the vendor involved and the component / issue of interest:

Facility Vendor Issue Fermi Fairbanks Morse Accelerated Failure of Diesel Generator bearings. Vendor reluctant to acknowledge problem. Problem potentially impacts Prairie Island and Duane Arnold.

Perry ASCO LaSalle Solenoid malfunctions impacted equipment operability. The vendor was initially slow in responding with infortation.

LaSalle Static-0-Ring Pressure and differential pressure switch malfunctions / failures. The switch materials were not compatible with required service conditions.

Point Beach Westinghouse Vibration-induced S/G tube failure.

The vendor did not submit a Part 21 Report following the North Anna event and was reluctant to share infonnation with the NRC.

Kewaunee ASCO Non-interchangeability of solenoid i

valves and parts. Resulted in inoperable containment isolation valves.

I N+ ~

/?TQ1 A

~

g _ gG 4 rid o /mul ##

h (9@w a

J/

- m g62 7 880613 MAXWELL 88-165 PDR

i I

A. Bert Davis 2

MAR o g tggg Facility yendor issue D. C. Cook Foxboro Transmitter drif t in harsh environments could mislead operators.

Davis Besse Cyberex Electrical component quality on circuit boards was deficient. The vendor did not conform with licensee purchase specifications.

Palisades Rosemount Transmitter drift in harsh environments could mislead operators.

These issues, in many cases arise from incomplete comunications between licensees and vendors regarding the capabilities of supplied equipment.

times it has appeared that vendors have been reluctant to share infonnation At perfomance problems with other licensees or the NRC.

who has responsibility for filing reports pursuant to 10 CF Typical of this of many vendors for equipment servi:e conditions su 1

qualification testing does not match service conditions or equipment des for and suitable for laboratory-type use fails in an industrial environment Another area of concern has related to AE firms who provide engineerin service to licensees.

While such fims develop QA Programs for their activities, NRC inspectioiis which have extended back through the licensee j

supporting information for engineering decisions is lac

)

wrong.

3 A third general problem area which is now emerging is tMt of replacement parts.

As plants age and vendors go out of business or ching product lines qualified replacement parts will become a matter of increasing ccJ,cern.

this can be viewed as an industry problem related to reliability of operatio While it is also of regulatory concern if unreliable parts cause 11 creased challenges to safety systems.

Possible solutions to these problems include increased accountability of vendors to the NRC and the industry, strengthening l

systems as NPRDS and better comunications between vendors and the NRC expectations rega,rding equipment performance.

The first alternative may involve rulemaking.

The second could likely be accomodated by increased NRC emphasis m--

,-...--.-,y

,v.

l l

A. Bert Davis 3

liar 0 91988 to industry groups on the value of shared information.

The third alternative could involve NRC sponsored workshops for vendors on such topics as environmental qualification, instrument reliability, or general design criteria.

In sumary, a number of specific problems have been identified regarding vendor support of licensees. The key to minimizing this problem would appear to lie with a strenghtened industry-NRC-vendor interface.

09tcIIML SIGNED BY E. G. GREEhVAN Edward G. Greenman, Director Division of Reactor Projects Rlll g}

RI R!l R!l!

7 d

r' 3/3 /88 de7ond/cs Gregnman iller ius 3/ 3/88 3/o1/88 3/1/88

reg I

,)3

~ } 77 l

..0 r

!. 42 s

PRIORITY AfiENTION REQUIRED MORNING REPORT - REGION III OCTOBER 30 198F LICENSEE / FACILITY N0i!FICATION/ SUBJECT CLEVELAND ELECTRIC ILLUMINATING CD./

SRI-PC/

PERRr UNIT I EXCESSIVE MAIN STEAM ISOLATION VALVE IMSIV) STROME TIMES I

EVENT EVENT NO.

AT 8:3T P.M.

ON OCTOBER 29 1987 WHILE OPERATING Ai 76% POWER. THE LICENSEC PERIORMED A FAST CLOSURE DE THE IN80ARD MSIV ON THE "D" S TE AMLINE 1821-F0220 IN ACCORDANCE WITH STARIUP TEST INSTRUCTION ISTIl 1821-025A. SECTION S.4 "FULL CLOSURE OF THE FASTEST MSIV AT MARIMUM PERMISSIBLE PDWER.*

THE VALVE DID NOT BEGIN TO STROKE CLOSED UNTIL APPROXIMATELY 18 SECONDS AFTER IT*S CONTROL SWITCH WAS PLACED IN THE

  • CLOSED
  • POSITION.

THE VALVE THEN STROKED.

CLOSED IN LESS THAN 3 SECONDS. THE LICENSEE DECLARED THE VALVE INOPERABLE AND IMMEDIATELY BECAN TO REDUCE REACTOR POWER 10 BELOW FSI.

SUBSEQUENILY Ai APPROKIMATELY 9:03 P.M.hNTHE VALVE WAS RESTROMED TWICE WITH SATISFACihRY STROKE TIME S.

BASED UP THE INITIAL FAILURE. IHE LICENSEE PERFORMED FAST CLOSURE TESTING OF THE REMAINING MSIVS. AI 9:44 P.M.I MINUTE ANDMSIV 1821-F028D WAS STRONED CLOSED WITH AN UNSATISFACTORY STROME TIME OF 17 SECONDS AND AT 9:52 P.M. WAS RESTROMED WITH AN ACCEPTABLE STROKE TIME.

Af 10:18 P.M..

MSIV 1821-F0288 WAS STROMED CLOSED WITH AN UNSATISTACTORY STROKE TIME OF 11.9 SECONDS AND AT 10:18 P.M. WAS RESTROMED WITH AN ACCEPTABLE STRoxE TIME.

VALVES 1821-F328D AND 1821-F0288 WERE ALSO DECLARED INOPERABLE PENDING EVALUATION.

THE REMAINING VALVES STROKED ACCEPTA8LY. THE EXCESSIVE INITIAL CLOSURE TIMES OF VALVES 1821F022D AND 2821F0280 (80TH ON THE D STEAMLINE)

WERE DETERMINED 87 THE LICENSEE TO BE REPORTABLE IN ACCORDANCE WITH IO CFR 50.72 58)(2)lIIII. DURING ALL MSIV CLOSURES. THE PILOT SOLENOID STATUS LICHTS WE RE OBSERVED TO EXTINQUISH. INDICATING IHAT THE MSIV PILOT VALVE SOLENDIDS DEENERGIZED.

THE LICENSEE CURRENTLY BELIEVES THAT DURING INITIAL CLOSURE TESIS MSIV PILOT VALVES ASSOCIATED WITH VALVES 1821-F0220 IB21-F028D AND 1821 80288 DID NOT FREELY STROKE OPEN UPON PILOT SOLENGID 6EENERGIZATIhN BASED UPON THE INABILITY TO RECREATE THE F AILURES AND SUBSEQUENT SATISF AdTORY I

MSIV PERFORMANCE THE LICENSEE DECLARED THE MSIVS OPERA 8LE Al 10:40 P.M..

THE LICENSEE IS doNTINUIpo TO EVALUATE THE EXCESSIVE MSIV STROKE TIMES IN CONSL*LTATION WITH GENERAL ELECTRIC AND IS CONSIDERING INCREASING MSIV SURVEILLANCE TEST FREQUENCY TO PROVIDE ADDITIONAL ASSURANCES OF MSIV OPE RABILI f f.

REGIONAL FOLLOWUP: THE RESIDENT INSPECTORS EVALUATE THE LICENSEE *S ROOT CAUSE DETERMINATION AND-WILL MONITOR MSIV PERFORMANCE DURING FUfURE MSIV URVEILLANCE TESTING.

$c:::>

- )

8RR3

~

II

)

f.-

l t

t a

Y.

N

~

y Os g

7 8

9 1

2 R

E L

T E

R TL U

B E E CU HV M

E E

S E W. EFS SIS V

V SDT S EEJ IR SE E

O L

VNS N SEHSE OEMM R

N A

IAEEE ESTUHTTL I

UT SS S

IN.STSCIDT g

M.TRC V

EI TE EAHN OE N

0EWLOIC7EFTEWAE LTS.

O

!8R TRI8HO R K

C T PL I

M2USE UL9T P

.SO n'-

VR TUU T

T0SEHEP 1

EUL NCTLMII STS

.FOVTUMN

~

A LL DIE,ONRUASS ARE RL I

OO

)

R1CA E0 AAFRM FAR I

TS E E2 V.NEW3SMT G E T

I CI T W8T SEHT TRSEOEV VST E

A O1SETETERSO HRHI I S N

TPM D P AHSB SEEFNTPTS SNE O

CSAS P (TE T 8TRO S

MOT I

I ENEE U %D TEAS 0 EI. TEE

(

52T VHNTEPT SNC STE G

JITM E

B SI 72N.EATOCR AFEIR SAH R

UT T 5 0EYRH IOUELSTME ELT VFULU SHOR A NO L-QISYmS SNN 1

SNOTSIPRE TSF

/EIE 5 WDAK 0 E1EROAAUOL I UEH IIO T2SOLM C CE f T W

T DIMO 1

R IS R A8BTC MSO RR$RL RT M3UC SEILTOO ALF LON O

TEET P

ANVS O I SATETDESFTRTIO LTM IC E

C I N NS FSMS HAECESW R

IRS)

OE SAIYN FSAS E

WAE FOSV T RV.IFTSOL EMSES EG

  • O IIEI N PLST PELYRE-EU SRA N

TNCS E PAEALERUNAL VESA R N I

OERM V AVMSUKI NUTL0 ENC OLA N

NSEI E I

FOADODRL8SE TLM 0

ESIOU NCT CU A.TDSRESTTSRVHFNEIO EFR T

RO DEMESOAEIS OCLO P R I

M GEKRC LBPD E I R SEI

/.

NTOOCLI NYHDLE NH HE IT)

O ISRFUAP.TIrTEDETH 8

N !

3 C

TETRSI TOA ATSE TRNELL.R H T.

OTT T NT G

R PEIOOMAI N

EEE HNTIENSTF SHt E I PRVSTIATGOASRNESs DRI I

T OUIE UAAIREEITII IOI D

A SSVGETR8sTETP L

SI ERN EOSLNVCEA!P TPO.

E N

LLEAIIAPM0OPESUA9 RPO R

I I

M ICCVWS O 0 USErT2 HX OSE RART TRS EDG L

WTEELEVEA IRO AER HEE U

I Q

L S HLCLVWMEATTT E TTR I

dDTORAL RHT SSRS C

E TTE FEVADOTSDA EO UC R

S T WNF ELEHT :DR SYISEEE ARMNL HTC PNN N

C YI ROUETRO UO O

ILBALHHG NIIDH U WCM I

TR E

T II LI BTT8 N

LC dMDA II FTETGFN O R 9uRERTNRILNAH N O LtO T

w CLI 2DEMEAIUILOLCSIO LeF E

IE e

I RPH D ICOSIWTD O I

T AE A

F T RV8OOTS NW S O E FoI

/DI EI8F EDO OIY0LSC T

/@

8 Y

ENN GD2RDSIEIET LOLRN L L T

EAU ON0EEETGGE RTIOOE A0L TIFPRVIDESSONTFTI NI8I R

NEY T C -

AERORNETEA AR OIW I

SL 0

EVR N OE1ELIUL EVCRLNUE IT e

R2RCLPSCCLAROWTP GSD 1

CER E

S ILE V 4EBEEEMIRIr.EUSOCX EEN P

LCP E 0WIWDSIDILvRCIDAE RTA I

e g

illll1l l

l

~~

DAILV REPORT REGION I!Z DATE:

10-30-87 K.A. CONN /.UGd1WI OCT "

1987 LICENSEE /FACIL11Y NOTIFICATION /SUDJECT CLEVELAND ELECTRIC ILLUMINATING CO./

SRI-PC/

PERRY UNIT 1 EXCESSIVE MAIN STEAM ISOLATION VALVli (MSIV) STROKE llMES EVENT EVENT NO.

10515 Al 6:37 P.M.

ON OCTOBER 29, 1987 WHILE OPERARTING AT 76% POWER, THE LICENSEE PERFORMED A FAST CLOSURE OF THE INBOARD MSIV ON THE "D" STEAMLINE. 1921-F022D.

IN ACCORDANCE WITH STARTUP TEST INSTRUCTION (STI) 1921-025A. SECTION G.4, "FULL. CLOSURE OF THE FASTEST MSIV AT MAXIMUM PERMISSIBLE POWER."

THE VALVE DID NOT BEGIN TO STROME CLOSED UNTIL APPROXIMATELY 18 SECONDS AFTER IT'S CONTROL SWITCH WAS PLACED IN THE "CLOSED" POSITION.

THE VALVE THEN STROMED CLUSED IN LESS 1HAN 3 SECONDS.

THE LICENSEE DECLARED THE VALVE INOPERADLE AND IMMEDIAlELY BEGAN TO REDUCE REACTOR PDWER TO BELOW 75%.

SUBSEQUENTLY, AT APPROXIMATELY 9:03 P.M.,

THE VALVE WAS RESTROkED TWICE WITH SATISFACTORY STROEE TIMES.

BASED UPON THE INITIAL FAILURE, THE LICENSEE PERFORMED FAST lCLUSURE TESTING OF THE REMAINING MSIVs.

AT 9:44 P.M.,

MSIV 1D21-F02GD WAS lAND A1STROEED CLOSED WITH AN UNSATISFACTORY STROKE TIME OF 1 MINU 9: 52 P.M.

WAS RESTROKED WITH AN ACCEPTEBLE STROKE TIME.

AT 10:16 P.M..

MSIV 1D21-F028B WAS STROVED CLOSED WITH AN UNSATISFACTORY STROME TIME OF 11.9 SECONDS AND AT 10:10 P.M.

WAS RESTROKED W11H AN ACCEPTADLE STROFE TIME.

vat _VES IB21-F028D AND 1921-F028B WERE ALSO DECLARED INOPERABLE PENDING EVAL UAT I ON.

lHE REMAINIG VALVES STROMED ACCEPTADLY.

THE EXCESSIVE INI I I Al.

, CLOSURE TIMES Or VALVES IB21F022D AND 2B21F028D (DOTH ON THE "D"

STEAMLINE)

WERE DETERMINED BY THE LICENSEE TO BE REPORTABLE IN ACCORDANCE WITH 10 CFR 50.72 0)) (2) (111 ).

DURING ALL MSIV CLOSURES, THE PILOT SOLENOID STATUS LIGHTS WERE ODSERVED 10 EXT INGUISH, INDICATING THAT THE MSIV PILOT VALVE SOLENUlDS

, DEEtlERG12ED.

THE LICENSEE CURRENTLY DELIEVES THAT DURING INITIAL LLOSURE t

'TESIS, MSIV PILOT VALVES ASSOCI ATED WITH VALVES 1821-F020D, ID21-F02GD. AND 1B21-F0288 DID NOT FREELY STROKE OFEN UPON PILOT SOLENOID DEENERGI7ATION,

, BARED UPON THE INABILITY TO RECREATE THE FAILURES AND SUBSEQUENT SATTSFAClORY

' MSIV PERFORMANCE, THE LICENSEE DECLARED THE MSIVs OPERABLE AT 10:40 P.M..

TiiE LICENSEE IS CON 11NUING TO EVALUATE THE EXCESSIVE MSIV STROME TIMES IN CONSULTATION WITH GENERAL ELECTRIC AND IS CONSIDERING INCREASING MSIV SURVEILLANCE TEST FREOUENCY TO PROVIDE ADDITIONAL ASSURANCES OF MSIV OPERABILITY.

b i REulUNAL FOLLOWUP:

THE RESIDENT INSPECTORS EVALUATE THE LICENSEE *S ROOT CAUSE DETERt11 NATION AND WILL MONITOR MSIV PERFORt1ANCE DURING FUTURE MSIV 4

! SURVEILLANCE 1ESTING.

i l

\\.

I I

i

\\s I

N N's N

\\

IV]F

/

d

)

eportable Event number 10515.

Facility :

Pt:RRY Date Notified : 10/30/87 Unit : 1 Time Notified 00:10 Region : 3 Date of Event : 10/30/87 Vendor : JE,GE Time of Event : 21:44 Operations Officer :

Don Marksberry Classification : 10 CFR 50.72 NRC Notified By : ROGER STIFFLER Category 1 : LCO Action Statement Rad Release : No Category 2 :

Cause : Unknown Category 3 :

Component :

Category 4 :

EVENT DESCRIPTION :

WITH THE REACTOR AT 62%, FULL CLOSURE TESTS ON MSIVs FOUND THREE VALVES WITH CI4SURE TIMES EXCEEDING THE 5 SECOND LIMIT. THE FIRST MSIV, F022-D (INBOARD)

CI4 SED 22 SECONDS. AFTER FURTHER TESTS THE CI4SURE TIMES WERE WITHIN 3-5 SECONDS. AS THE RESULT OF THE TEST, THE OUTBOARD MSIV, FO-28-D, W S

TESTED WITH A CLOSURE TIME OF 77 SECONDS. THE VALVE WAS CYCLED SEVERAL TIMES WITH STROKE TIHES WITHIN 3-5 SECONDS. ALL OTHER MSIVs WERE TESTED WITH ONLY ONE OTHER VALVE, FO-28-B, C14 SING AT 12 SECONDS AND FURTHER TESTS RESULTED IN CLOSURE TIMES WITHIN 3-5 SECONDS. AFTER THE FIRST TEST ON THE THREE VALVES THE SIDW CLOSURE TIMES COULD NOT BE REPEATED. SUSPECT WATER IN AIR SUPPLY AFFECTING THE PNEUMATIC SOLENOIDS WHERE THE CYCLING FREED THE SOLENOIDS.

CONSIDERING SHORTENING THE SURVEILLANCE FREQUENCY FOR FULL CLOSURE TEST WHI IS NOW 92 DAYS. NOTIFIED RDO(SNELL).

9' l

,,s~

DAILY REPORT REGION III DATE:

11-02-07 LICENSEE / FACILITY NOTIFICATION / SUBJECT CLEVELAND ELECTRIC ILLUMINATING CO./

SRI-PC/

PERRY UNIT 1 EXCESSIVE MAIN STEAM ISOLATION VALVE (MSIV) STROKE TIMES EVENT EVENT NO. 10515 (UPDATE)

ON OCTOBER 29, 1987, WHILE OPERATING AT APPROXIMATELY 75% POWER, THE MSIVs WERE INDIVIDUALLY FAST-CLOSURE TESTED.

VALVES 1921-F022D, 1821-F028D.

AND 1821-F028B EXHIBITED EXCESSIVE STROKE TIMES.

SUDSEQUENT FAST-CLOSURE TESTS WERE PERFORMED AND THE VALVES PERFORMED SATISFACTORILY.

THE VALVES WERE DECLARED OPERADLE FOLLOWING THE SUCCESSFUL FAST-CLOSURE TESTS.

THE LICENSEE DELIEVES THAL THE EXCESSIVE INITIAL STROKE TIMES MAY HAVE BEEN DUE TO I MPU RI T I ES IN THE VALVE ACTUATOR PILOT AIR SYSTEM AND THAT THE IMPURITIES WERE DISLODGED DURING VALVE OPERATION.

BASED UPON DISCUSSIONS BETWEEN LICENSEE.

NRC REGION III. AND NRR MANAGEMENT PERSONNEL HELD ON OCTOBER 30, 1987. THE LICENSEE WILL PERFORM ADDITIONAL FAST-CLOSURE TESTS ON THE SUBJECT VALVES TO CONFIRM THEIR OPERABILITY SHORTLY DEFORE THE PERFORMANCE OF THE FULL REACTOR ISOLATION STARTUP TEST.

THE FULL REACTOR ISOLATION STARTUP TEST IS CURRENTLY SCHEDULED TO DE PERFORMED ON NOVEMBER 6 1987.

THE FULL REACTOR ISOLATION IS THE LAST TEST IN THE LICENSEE'S STARTUP TEST PROGRAM.

WHILE SHUT DOWN FULLUWING THE STARTUP TEST THE LICENSEE WILL EXAMINE THE MSIVs AND MS!V ACTUATORS TO FURTHER ESTABLISH 1HE ROOT CAUSE OF THE EXCESSIVE STROKE TIMES EXF ERIENCED ON OCTOBER 29, 1987.

REGIONAL FOLLOWUP:

THE RESIDENT INSPECTORS WILL WITNESS MSIV FAST-CLOSURE 1ESTING TO DE CONDUCTED PRIOR TO THE FULL REACTOR ISOLATION STARTUP TEST AND WILL INFORM NRC REGION III AND NRR MANAGEMENT OF THE TEST RESULTS.

O'go is

\\

\\

l

~<

i 10560 Number Repor t able Event 11/03/87 fled :

Date Nott 21:30 Time Notified

  • 11/03/G7 PERFi 1%te of Event :

10s20 10 CFR $0.72 of Event :

tlity Time a

Cl assi f icat t o.,ESF Actuation g

it : i: 3 1 :

na Cateoory SCRAM

'I.

os on GE.GE Rnn You

.erottens Officer ALLEN OF0Ft1 Category 2 :

.ndor CateQory 3 :

h By :

(C Nattfled Catego y 4 :

r SS s No ED UNIT S/D WAS IN PROO ad Release INVCFTIGATION D "PULL SHE.ET"E UNDER ause :

POWER WHILE A CONTROLL FOLLOWING THE CONTROL RC emponent TO DETERMINE THE SEQUENC POINT (i.e..

ABOUT 239

'TH REACTOR AT OPERATORS WERE EELOW THE LOW POWER SETN MUST BE WITHDRAWAL /IN3LRTION)RE ACT OR

  1. 10555).

3EE EVENT JSED FOR ROD FROM THOSECR SETPOINT, NSERT10N WHEN THE ROD NT CH OWER SETFOINT BELOW WHIWITH THE REDUIRENE NTS fRATION,WERE DIFFEREPOWER BELOW THE LO

ONSIFTENTROD SEOUEfG HND CONF IGLWITH REACTORTORS CO CONTROLLER ER SETPOINT
ONTROL THE ROD F AT T EhN b KElJED AND OPERA SCRAMMED DROPF ED }iELOW THE LOW PC MANUALLY NORMAL ROD DLOD 0 WEREDFub410RS a FP2727FFOOj 6 OF THL TO BLOW SPEED fis F ARTAND 35%

LICENSE T HE AER Ah.

c or,t i nu t>THE FFACTOh POWER AND IS RODS. a New Lina to SHIFTED FRUM FASTVaRIES EE'iWEEN 20% THE HDT S/D.

T t lal Type 9UbPECli IS STABLE IN SEi.*UENCE AND LICEN9ErFECIFL FilhF 5 LuERt F OWE h EET POINT UNII T HI LOW PRE but >RE.

At LOWED A CONY 6DL INFORMED.

WMEN S / b PROCE D'.1FL.iIF3T ST Ar,2 SHE.ET NRC RESIDENT WAu TULL FA THE 1 L* tt i ht NG IN f<0D BLOCt,S.

INVLSI l' a.1 IN H # *F Di L OWI BASED ON Fa F LEL'L I ED 1H 4i CONF IG' lA AT ION HAhRISON)

F:I O.

(NO11FIED dE.

OlHER CHARACT ER T O cot 4T IN nNv EEL /JE TO OUIT.

ENTER

/

N s

l fYENT FOLLOWUP REPORT 87-172 50.72 EVENT #10515, OCTOBER 30; 1987 e.

PLANT ~ PERRY 1 W 4 Mu PROJECT MANAGER-T. COLBURN COGNIZANT ENGINEER-J. CARTER PROBLEM M51Vs did not close within the time allowed by Technical Specifications.

CAUSE TnTETally unknow but subsequently detemined that a higher than anticipated ambient temperature caused the main pilot control (solenoid valve) to hangup.

SAFETY Sir.N!FICANCE

(

Reactor isolafion or containcent integrity may not be possible in the event of an acc16nt cr transient.

DISCUSSION During full closure tests v,

.ndividual MSIVs, three valves exceeded the 5 second closure time of the tectnical specifications. Times were 22, 12, and 77 seconds with the two slowst valves being in the "D" steam line.

Subsequent testing of these valves resulted in closure times of 3-5 seconds.

The licensee initially suspected that dirt in the air system caused the solenoid valve to hangup, thereby delaying the on-set of valve closure. Since there had been no previous instances of slow MS!V closure, the licensee continued power operation while reviewing maintenance records and preparing for their last pre-operational test, fell MSIV isolation. The licensee and NRC regional and headquarters staff agreed with this approach.

Prior to running the full MSIV isolation test, the Itcensee again tested individra)

MSIVs for closure. Slow valve closure was observed again. The licensee shut down the reactor without performing their full MSIV isolation test.

NRC dispatched an AIT to the site to be present during disassembly of t:u solenoid valves andito evaluate the problem.

Initial conclusions wre TAat steam leaks in the vicinity of the MS!Vs and the control circuit velves (includes the solenoid vahes) had caused ambient temperatures in the vicinity of 300' F at the highest temperature location which also was the location of the "D" isoletion valve. The elastomer seal in the solenoid ve he had hardened and was believed to have held the solenoid in the closed position thereby pre nnting sir from being vented, tiereby keeping the MSIV open.

l I

FOLLOWUP The AIT will document their findings and present any #ellowup to be done, plant specific or generic. NofurtheractionbyEAhisnecessary.

Je Carter BVR Sectior.

Events Assessment Branch cc:

T. Colburn E. Rossi

/

0 x

l\\

~

d i

f

)

I e

l rtable Event number 10515.

ility :

PERRY Date Notified : 10/30/87 Unit : 1 Time Notified : 00:10 Region : 3 Date of Event : 10/30/87 Vander : GE, riE Time of Event : 21:44 Operations Off'.-

Don Marksberry Classification : 10 CFR 50.72 NRC Notified s'

STIFFLER Category 1 : LCO Action Statement Rad Release :

Category 2 :

Cause : Unkr. ova.

Category 3 :

Component :

Category 4 :

EVENT DESCRIPTION t WITH THE REAC'fok AT 62%, FULL CLOSURE TESTS ON MSIVs FOUND THREE VALVES WITH CLOSURE TIMES EXCEEDING THE 5 SECOND LIMIT. THE FIRST MSIV, F022-D (INBOARD),

i CLOSED 22 SECONDS. AFTER FURTHER TESTS THE CLOSURE TIMES WERE WITHIN 3-5 SECONDS. AS THE RESULT OF THE TEST, THE OUTBOARD MSIV, FO-28-D, WAS TESTED WITH A CLOSURE TIHE OF 77 SECONDS. THE VALVE WAS CYCLED SEVERAL TIMES WITH STROKE TIMES WITHIN 3-5 SECONDS. ALL CTHER HSIVs WERE TESTED WITH ONLY ONE OTHER VALVE, FO-28-B, CLOSING AT 12 SECONDS AND FURTHER TESTS RESULTED IN CIOSURE TIMES WITHIN 3-5 SECONDS. AFTER THE FIRST TEST ON THE THREE VALVES THE SLOW CLOSURE TIMES COULD NOT BE REPEATED. SUSPECT WATER IN AIR SUPPLY AFFECTING THE PNEUMATIC SOLENOIDS WHERE THE CYCLING FREED THE SOLENOIDS.

'[

IDERING SHORTENING T *E SURVEILLANCE FREQUENCY FOR FULL CLOSURE TEST WHICH OW 92 DAYS. NOTIFIED RDO(SNELL).

l

=

h

t l

1

, 9~, ( ),

\\

l l

V l

/

/

t

);

y.

)

f 1

i

\\

' /.r

/t

?(

J!

t g

4 s

!R2....EDM............E.............E

'j_

)

' Copyrighted Document Addressed Under FOIA

.r

\\

1

. -['

)

1

/

')a!

For hhrd copy, refer'teNDR Folder:FOIA d

- / d

/

y e i'

i

),

f M' 5 A b

~

~

FOIA Name & Nu bar:

Pages:

l///>

Accession Number:

'N M}d / C / $ 7 a

e 4

..,,.,---n n.-n n,

,.,,-.,,,,,.n,,,_,.,.-,_,,..a,.

,__,_an.-...,_.

,,n,_,,

,,,,,,.,-,,.,,_.n