MONTHYEARML20217G1521999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Wolf Creek Generating Station.With ML20212A0251999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Wolf Creek Generating Station.With ML20210R5741999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Wolf Creek Generating Station ML20210R5921999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20209H0821999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20210R5871999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1021999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1071999-04-30030 April 1999 Revised MOR for Apr 1999 for Wolf Creek Generating Station ML20206P8261999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Wcgs.With ML20210R5841999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Wolf Creek Generating Station ML20205Q0761999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Wolf Creek Generating Station.With ML20207K5991999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Wolf Creek Generating Station.With ML20199E6531998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Wolf Creek Generating Station.With ML20198D7321998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Wolf Creek Generating Station.With ML20195D1791998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Wolf Creek Generating Station.With ML20154L4591998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Wolf Creek Generating Station.With ML20151W1491998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Wcgs.With ML20237B0841998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Wolf Creek Generating Station ML20236P3441998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Wolf Creek Generating Station ML20236P3481998-05-31031 May 1998 Corrected Page of MOR for May 1998 for Wolf Creek Generating Station ML20249A0171998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Wolf Creek Generating Station ML20247H0901998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Wolf Creek Generating Station ML20216F6101998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Wolf Creek Generating Station ML20216G1971998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Wolf Creek Nuclear Operating Corp ML20202H0721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Wolf Creek Generating Station ML20198P1931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Wolf Creek Generating Station ML20197J0321997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Wolf Creek Generating Station ML20199C7081997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Wolf Creek Generating Station ML20211N7161997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Wolf Creek Generating Station ML20216H9561997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Wolf Creek Generating Station ML20210M4401997-07-31031 July 1997 Monthly Operating Rept for July 1997 for WCGS ML20148L8781997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Wolf Creek Generating Station ML20141H7541997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Wolf Creek Generating Station ML20137W5021997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Wolf Creek Generating Station ML20147E5931997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Wolf Creek Generating Station ML20134M9821997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Wolf Creek Generating Station ML20133M3991996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Wolf Creek Generating Station ML20132C0871996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Wolf Creek Generating Station ML20134L7281996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Wolf Creek Generating Station ML20128N0301996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Wolf Creek Generating Station ML20134C1291996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Wolf Creek Generating Station ML20134C1371996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Wolf Creek Generating Station ML20116M5431996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Wolf Creek Generating Station ML20116M5471996-07-0808 July 1996 Revised Monthly Operating Rept for June 1996 for Wolf Creek) Generating Station ML20134C1321996-06-30030 June 1996 Revised Monthly Operating Rept for June 1996 for Wolf Creek ML20115F1211996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Wolf Creek Generating Station ML20112J1781996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Wolf Creek Generating Station.W/Undated Ltr ML20115F1251996-04-30030 April 1996 Monthly Operating Rept Revisions for April 1996 for Wolf Creek Generating Station ML20117D7701996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Wolf Creek Generating Station ML20107D8971996-03-31031 March 1996 Monthly Operating Rept for March 1996 for WCGS 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G1521999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Wolf Creek Generating Station.With ML20211N0161999-09-0202 September 1999 Safety Evaluation Supporting GL 95-07 to License NPF-42 ML20212A0251999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Wolf Creek Generating Station.With ML20217P6451999-08-30030 August 1999 Requests Commission Approval to Publish Encl Pr,Rg & SRP & to Issue Encl Ltr to Parties of Wolf Creek Transfer Proceeding Re Disposition of Existing Antitrust License Conditions in Event OL Transfer Approved ML20210R5741999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Wolf Creek Generating Station ML20210J1561999-07-29029 July 1999 Rev 0 to Wolf Creek Generating Station,Unit 1 Pressure & Temp Limts Rept ML20210R5921999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20209H0821999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20195D5261999-06-0202 June 1999 Safety Evaluation Approving Proposed ISI Program Alternative for Limited Reactor Vessel Shell Weld Exams & Relief Request from Requirements of ASME Code,Section XI ML20210R5871999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1021999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1071999-04-30030 April 1999 Revised MOR for Apr 1999 for Wolf Creek Generating Station ML20206P8261999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Wcgs.With ML20196L3401999-04-30030 April 1999 Rev 1 to WCGS Cycle 11 Colr ML20210R5841999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Wolf Creek Generating Station ML20205Q0761999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Wolf Creek Generating Station.With ML20207K5991999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Wolf Creek Generating Station.With ML20207K9761998-12-31031 December 1998 Annual SER 14,for Period 980101-1231, for WCGS ML20199E6531998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Wolf Creek Generating Station.With ML20195C0011998-12-31031 December 1998 Ks City Power & Light Co 1998 Annual Rept & Financial Statements as of 981231 & 1997 for Ks Electric Power Cooperative,Inc ML20195B9901998-12-31031 December 1998 Western Resources Annual Rept for 1998 ML20198D7321998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Wolf Creek Generating Station.With ML20195H9801998-11-17017 November 1998 Safety Evaluation Supporting Proposed Changes to WCGS Radiological Emergency Response Plan ML20195E7591998-11-10010 November 1998 WCNOC Proposed PASS Function Reduction ML20195D1791998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Wolf Creek Generating Station.With ML20154L4591998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Wolf Creek Generating Station.With ML20153G2771998-09-30030 September 1998 Rev 1 to WCAP-15079, Wolf Creek Heatup & Cooldown Limit Curves for Normal Operation ML20153G2851998-09-30030 September 1998 Rev 1 to WCAP-15080, Evaluation of Pressurized Thermal Shock for Wolf Creek ML20153G2691998-09-30030 September 1998 Rev 1 to WCAP-15078, Analysis of Capsule V from Wolf Creek Nuclear Operating Corp Wolf Creek Reactor Vessel Radiation Surveillance Program ML20153G7301998-09-23023 September 1998 Special Rept 98-003:on 980814,station Entered TS 3.3.3.6, Action Statment a Due to Inoperability of RVLIS B Train. Cause Has Not Yet Been Identified.Work Order 98-202813-000 Has Been Generated ML20151W1491998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Wcgs.With ML20237B7381998-08-14014 August 1998 Special Rept 98-001:on 980615,oxygen Analyzer on Wgs Was Declared Inoperable.Wgs Oxygen Analyzer OARC-1119A Was Indicating 0 Ppm on 980814 & Fluctuated Between 200 & 900 Ppm on 980615.Completed Work Order & Declared Wgs Operable ML20237B0841998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Wolf Creek Generating Station ML20236P3441998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Wolf Creek Generating Station ML20236P3481998-05-31031 May 1998 Corrected Page of MOR for May 1998 for Wolf Creek Generating Station ML20249A0171998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Wolf Creek Generating Station ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20247H0901998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Wolf Creek Generating Station ML20216J7791998-04-15015 April 1998 SER Approving Requests for Relief I1R-46 Through I1R-49 & I2R-21 Submitted by Licensee on 970523.Relief for Exam Category B-A,Item B1.12,RPV Shell Welds Deferred Until Licensee Satisfies Regulations for Augmented Rv Exam ML20216C2641998-04-0606 April 1998 SER Accepting Addl Info Re GL 92-08, Thermo- Lag 330-1 Fire Barriers, for Plant ML20216F6101998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Wolf Creek Generating Station ML20217H3491998-03-31031 March 1998 SER Accepting Operational Quality Assurance Program Description Change for Wolf Creek Generating Station ML20217H7241998-03-30030 March 1998 SER Accepting Proposed Change to Operational Quality Assurance Program for Plant ML20216G1971998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Wolf Creek Nuclear Operating Corp ML20202H0721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Wolf Creek Generating Station ML20217G4311997-12-31031 December 1997 Western Resources 1997 Annual Rept & Financial Statements for Years Ended 971231 & 1996 for Ks Electric Power Cooperative,Inc ML20203H0151997-12-31031 December 1997 Annual Operating Rept 13 for Jan-Dec 1997 ML20217G3711997-12-31031 December 1997 Kansas City Power & Light Co 1997 Annual Rept ML20216D7771997-12-31031 December 1997 Annual SER 12 for Jan-Dec 1997, for Wolf Creek Generating Station 1999-09-30
[Table view] |
Text
'
I o.** ^..-
WOLF CREEK NUCLEAR OPERATING CORPORATION Fommel T. fthodes wee m September 14i 1990 ET 90-0151 q U.LS, Nuclear Regulatory Comunission -
ATTN ' Document Control Desk Mail Station P1-137 Washington, D. C. 20555
Subject:
Docket No. 50-402: August 1990. Monthly,0perating_ i
, Report a
-l Gentlemen Attached is the August 1990, .Honthly Operating-.-Report- for Wolf Creek Generating Station. This- submittal'is being made in accordance with the ,
requirements of Technical Specification 6.9.1.8.-
q
-Very truly yours,
,/
p a- j Forrest T. Rhodes.
Vice President Engineering & Technical Services FTR/aem
<- Attachment cc: R. D. Martin (NRC), w/a -
D. V. Pickett (NRC), w/a M. E. Skow (NRC), w/a J. S. Wiebe (NRC), w/a C QQ9 j i.'4[1 [ /;.: 4 2 Oh! N{
/
O m Gn-g
. ,j P D F, ADtu. 6 o'.O u u d ut R F DC RO. Bac 411/ BuHmgton, KS 86839 / Phone: (316) 364-8831 An Equal Opporturvey Erigdoyer WMCNET - [ .
sp.;
Atpchmept to ET 90-0151 j
,I i
5 MLF CREEK NUCumR OPl!RATDG CWPGETIN ,
l WCLF CREEK Grem SMTIN '
M3mILY OPERATDG REPWT POmit : Auoust YlmR ' l22Q Docket No.: 50-482 Facility Operating License ~No. NPF-42' Report No._ ff_
i i
l l
l Papand hs Herlin G. Williams 1
,1 I
t .,
1
,,., . . . . . , . i.
, O
.A.ttactanent
. .y ; to ET 90-0151 -
ED00RY
'Ihe following report highlights the operating Wanoe of Wolf Creek Generating Staticm for the ncmth of August,1990. '1his report is being provided pursuant to Technical Specification 6.9.1.8.
I;- SG90RY OF ORBU@IIG EKPERIERCE .
'1he unit operated at or naar 100% power throughout the month of August.'
.II. MpmR SAFI!5Y REEATED 19LINIENMCE ACTIVITIES .
No nejor safety related maintenance activities were performed during the ,
<nonth of August. l q
i 1
i I
1 J ..
i j
Nolf Creek Generating Staticn Monthly Operating Paport i A2 gust 1990-Page 1 of 5 I
-i H lAt.t,achment to ET 90-0151'
.g ~
CPERATI1G DATA REPCHT DOCKET ND. ,,,5Q 182 Now CREEK caeRATIso emriaN MCIE CREEK 10CIJEAR CPERATDG CORPCRATICBI i DhTE 09-01-90 COGLE5ED BY M. Millians TELEPIONE 316-364-8831 g
- 1. Reporting Periods, Anount, 1990 Gross Hottra in Reporting Period 744
(
- 2. Currently Authorised Power Imvel(Wt)s ]ill Max. Depend. I'myity(We-Net):1,ll35
- Design Electrical Rating (ms 40st): 1170'
- 3. Power Imvel to Wilch Restricted (If Any)(We-Not): N/A i
- 4. Reasons-for restrictica (If Any)
- N/A
'1his Month Yr. to Date- Cumulative
- 5. Number of Hours Reactor was Critical - 744.0 4167.1 34,466.5 .j i
6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 j
- 7. Hours Generator on Line 744.0- 4107.7 33,894.8 f
- 8. Unit Reserve Shutdown Hours 0.0 0.0= 0.0 j
- 9. Gross Thermal Energy Generated ( M ) 2,534,494 13,648,203 112.125,458 I
- 10. Gross Electrical E:argy Generated ( M ) 880,390 4,742,547-- 39,021,494
- 11. Het Electrical Energy Generated ( M ) 843,610 4,522,610 37,244,981
- 12. Reactor Service Factor 100.0 71.5 78.7
- 13. Reactor Avnflability Factor 100.0 71.5- 79.5
- 14. Unit Service Factor 100.0 70;4 77.4 3
- 15. Unit Availability Factor 100.0- 70.4 77.4 i
- 16. Unit Capacity Factor (Using MDC) 99.9 68.3 75.3 h
- 17. Unit Capacity Factor-(Using Design NNe) 96.9' 66.3 72.7
- 18. thit Forced Outage Rate 0.0 2.9 4,4 19.. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): N/A
- 20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A Wolf Creek Generating Station Monthly Operating Report August 1990 Page 2 of 5
AJ.tachqpnt-to ET 90-0151 1 AVI!lRN3E IATLY IMIT POWER IJML DOCIQLT NO. 50-482 WOLF CICEK GilBEIRATDG S'mTIm :
NCIE CREEK NUCLEAR cpl!RATDG OCRPCRATICE IRTE 09-01-90 00MPIJ!5'ED BY M. Wi11i-TELEPIDIE 316-364-8831 KNITI Auaust, 1990 IRY AVERAGE DAILY POWI!R LEVI!L IRY AVIRAGE IRILY PCMER IEn!L (20s-Net) (M6e-Net)
- 1. ~ 1131 17 1134 l
2 1136 18- 1134- _.
3 1130 19 1135 i 4 1132 20 1136 1 5 1140 .21 - 1133 6 '1141 22 1129
, 7 1139 23 . 1130 ;
8 1140 24 1131 9 1139 25 1132
.i 10 1138 26 1130 l
11 1139 27 '1129 12 1139 28 1126 13 1139 29 1122 !
14 1138 30 1126 15 1135 31 1131-
'16 1136 i
Wolf Creek Generating Station Monthly Operating Esport August 1990 Page 3 of.5
I --
1 l
Attachment to ET 90-0151 UNIT SHUTDOWN A!'D POWER REDUCTIONS DOCKET NO. 50-482
- WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 09-O:.-90 COMPLETED B'1 M. Wi;.liams REPORT MONTH August. 1990 TELEPHONE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE #CTIONS/COMMIEN"S No Date S: SCHEDULED (HOURS) (1) OR REDUCING POWER (2)
The unit operated at or near IOOZ power throughcut the month.
stb 9ERY:
- 1. MANUAL
- 1) REASON: A: EQUIPMENT FAILORE (EKPLAIN) E: OPERATOR TPAINING AND LICENSE EXAMINATION (2) METHOD: MANUAL SCRAM B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUT0f'ATIC SCRAM D: REGUIATORY RESTRICTION B: OTHER (EXPLAIN) 4. CONTINUED
- 5. REDUCED LOAD
- 9. OTHER Wolf Creek Generating Station Monthly Operating Report August 1990 Page 4 of 5
-c Atta@ gent to.' ET 90-0151-y ..
a ,
WOLF QUEK NUCLEAR (PNUtrDG 00RPCRATION RIE OGEK GBE50erDG SMrION -
IMIT NO.1 i
KBmt Anaust, 1990 SLB9mRY OF CPERATDG EKPERIBOCE Listed below in chronological sequence is a summary of operating experiences for this acmth
- which required load reduction or resulted in significant non-load related irrittarits. '
DB25 22HE ERE August 1, 1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> t Unit at 1004 power.
August 31, 1990 -2400 hours thit at'100% power. j
, m f
i
-i
..i
.i
-i Lj
.3 a
l
't Wolf Creek Generating Station Monthly Operating Report August 1990 Page 5 of 5