MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to Abb C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20134H3771996-11-0606 November 1996 Proposed Tech Specs of Appendix a Re Cooling Water Sys ML20134E4551996-10-25025 October 1996 Proposed Tech Specs Changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2591996-09-24024 September 1996 Proposed Tech Specs,Changing TS 4.12 to Incorporate Revised Acceptance Criteria for SG Tubes W/Degradation in Tubesheet Region ML20117P4311996-09-11011 September 1996 Proposed Tech Specs,Revising Plant TS Governing Cw Sys ML20117B2381996-08-15015 August 1996 Proposed Tech Specs 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses ML20115G8121996-07-15015 July 1996 Proposed Tech Specs Re Moveable Incore Detector Thimble Reduction ML20095J7951995-12-14014 December 1995 Proposed Tech Specs for Conformance of Administrative Controls Section 6 to Guidance of STS ML20094S2791995-11-28028 November 1995 Proposed Tech Specs Re Radiological Effluent TS Conformance ML20087F3571995-08-0909 August 1995 Proposed Tech Specs Table TS 3.15-1,Pages 1 & 2 & Bases Page B.3.15-1 Marked Up to Implement License Amend Request 1999-08-31
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to Abb C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20195F1391998-10-0808 October 1998 Non-proprietary Version of Rev 1 to NSPNAD-97002, Steam Line Break Methodology ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20151Z9181998-08-0303 August 1998 Rev 0 to 5AWI 6.1.2, Design Outputs,Review & Verification ML20151Z9011998-08-0303 August 1998 Rev 2 to 5AWI 6.1.0, Design Change General ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20248M1421998-04-0606 April 1998 Draft NRC Insp Manual Temporary Instruction 2515/XXX Fire Protection Functional Insp (Fpfi) ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20151Z9561998-01-0505 January 1998 Rev 0 to 5AWI 6.1.7, Design Change Work Orders ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20151Z9441997-10-20020 October 1997 Rev 0 to 5AWI 6.1.6, Design Review & Approval ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20136H0101997-01-29029 January 1997 Rev 12 to Abnormal Procedure AB-3, Earthquakes ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20138G8751996-11-0808 November 1996 Rev 2 to TN-40 Cask Unloading Procedure 1999-08-31
[Table view] |
Text
_ - _ _ _ _
4 Exhibit B Prairie Island Nuclear Generating Plant License Amendment Request Dated January 30, 1991 Proposed Changes Marked-up on Existing Technical Specification Pages Exhibit B consists of the existing Technical Specification pages with the proposed changes written on those pages. The existing pages affected by this License Amendment Request are listed below:
Pages TS.6.2-6 TS.6.2 7 9102050238 910130 PDR ADOCK 05000282 p PDR R ' .. _ _ _ . _ _ . _ _ - - _ _ . _ . . - _ _ _ _ __
TS. 6. 2-6, , n . n.
3; $9 f.- Investigations of all Reportable Events and events requiring Speef al Reports to the Commission.
- g. Drills on emergency procedures (including plant evacuation) and adequacy of communication with offsite support groups,
- h. . All procedures required by these Technical Specifications, including implementing procedures of the Emergency Plan, and the Security Plan (except as exempted in Section 6.5.F) shall be reviewed initially l' and periodically with a frequency commensurate with their safety significance but at an interval of not more than two years. 4
- 1. - Special reviews and investigations, as requested by the Safety Audit Committee.
- j. Review of investigative reports of unplanned releases of radioactive (
material to the environs.
- k. All changes to the Process Control Program (PCP) and the Offsite Dose calculation Manual (ODCM).
- 5. . Authority The OC shall be advisory to the Plant Manager. In the event of a disagreement between the recommendations of the OC and the Plant Manager,
~
the course determined by the Plant Manager to be the more conservative j will be followed. A written summary of the disagreement will be sent J
to the General Manager Nuclear Plants and the Chairman of the SAC for review.
.6. P.ecords Minutes shall be recorded for all meetings of the OC and shall identify all documentary material reviewed. The minutes shall be distributed to each member of the OC, the Chairman and each member of the Safety Audit Committee, the General Manager Nuclear Plants and others designated by the OC Chairman or Vice Chairman.
'7. : Procedures A'vritten charter for the OC shall be prepared that contains:
- a. Responsibility and authority of the group
- b. Content and method of submission of presentations to the
-Operations Committee
- c. Mechanism for scheduling meetings
- d. Provision for meeting agenda
.~
Maintenance work requests and their associated procedures shall be reviewed per the requirements of Section 6.2,C.
- 1. Thereviewofsafetyevaluations(whensafetyevalNtionsare required by 10 CFR Part 50, Section 50.59) for procedures or procedure changes to verify that such actions do not constitute an,/
unreviewed safety ~w
4 TS.6.2-7
- e. Use of subcommittees
- f. Review and approval, by members, of OC actions 9 Provision for distribution of minutes l
/ C. Maintenance Procedures
- 1. Maintenance work requests and their associated procedures required by specification 6.5.C and changes thereto, shall be prepared, reviewed and approved. Each procedure or procedure change shall be reviewed by a qualified individual (s) other than the individual (s) k who prepared the procedure or procedure change. The appropriate
\ superintendent (as previously designated by the Plant Manager) shall approve these procedures.
- 2. Individuals responsible for reviews performed in accordance with the requirements of specification 6.2.C.1 above shall meet or exceed the qualifications described in section 4.2 or 4,4 of ANSI N18,1 1971 I and shall be previously designated by the Plant Manager. Such reviews shall include a determination of whether or not additional cross disciplinary review is necessary.
- 3. All reviews shall include a determination of the need for a safety evaluation to establish whether or not an unreviewed safety question is invoh ed.
i
Exhibit C
-Prairie Island Nuclear Generating Plant License Amendment Request Dated January 30, 1991 REVISED TECHNICAL SPECIFICATION PAGES Exhibit C consists of revised pages for the Prairie Island Nuclear Generating Plant Technical-Specifications with the proposed changes incorporated as listed below:
Pa r.e s TS viii TS.6.2 6 TS.6.2-7
3 9
4 4 i TS viii TABLE OF CONTENTS (Continued)
TS SECTION IITLE PAGE 6.0 ADMINISTRATIVE CONTROLS TS.6.1 1 6,1 Organization TS.6.1-1 6.1 Review and Audit TS.6.2 1 A. Safety Audit Committee (SAC) TS.6.2-1
- 1. Membership '
TS.6.2 1
- 2. Qualifications TS.6.2-1
- 3. Meeting Frequency TS.6.2 2
- 4. Quorum TS 6.2-2
- 5. Responsibilities TS.6.2-2
- 6. Audit TS.6.2 3
- 7. Authority TS.6.2-4
- 8. Records TS 6.2-4
- 9. Procedures TS 6.2 4 B. Operations Committee (OC) TS.6.2 5
- 1. Membership TS.6.2-5
- 2. Meeting Frequency TS.6.2 5
- 3. Quorum TS.6.2 5
- 4. Responsibilities TS.6.2 5
- 5. Authority TS.6.2-6
- 6. Records TS.6.2-6
- 7. Procedured TS,6.2 6 C. Maintinance Procedures TS.6.2 7 l 6.3- Special Inspections and Audits TS.6.3 1 6.4 Safety Limit Violation TS.6.4 1 6.5 -Plant Operating Procedures TS.6.5-1 A. Plant Operations TS 6.5-1 B. Radiological TS.6.5-1 C. Maintenance and Test TS.6.5-3 D. Process Control Program (PCP) TS.6,5-3 E. Offsite Dose Calculation Manual (ODCM) TS.6.5-4 F. Securtiy TS.6.5-4 G. Temporary Changes to Procedures TS.6.5-4 6.6 Plant Operating Records TS.6.6 1 A.-Records Retained for Five Years TS.6.6 1 B. Records Detained for the Life of the Plant TS 6.6 1-
H
'4's )
TS.6.2 6 i
- f. Investi6 ations of all Reportable Events and events requiring J Special Reports to the Commission. [
- g. . Drille en emergency procedures (including plant evacuation) and adequacy of commitnication with offsite support groups.
- h. All procedures-required by these Technical Specifications, including implementing procedures of the Emergency Plan, and the Security Plan (except as exempted in Section 6.5.F), shall be <
reviewed initially and periodically with a frequency commensurate with their safety significance but at an interval of not more than two years. Maintenance work requests and their associated procedures shall be reviewed per the requirements of Section ,
6.2.C. I
- 1. Special reviews and investigations, as requested by the Safety ;
Audit Committee. j
- j. Review of investigative reports of unplanned releases of radioactive material to the environs,
- k. All chan6es to the Process Control Program (PCP) and the Offsite Dose Calculation Manual (ODCM).
i J1. The review of safety evaluations, when safety evaluations are :
required by 10 CFR Part 50, Section 50.59, _ for procedures or i procedure changes to verify that such actions do not constitute an unreviewed safety question.
- 5. Authority The 0C shall be advisory to the Plant Manager. In the event of a disagreement between the recommendations of the OC and the Plant Manager, the course determined by'the Plant Manager to be the more conservative will be followed. A written summary of the-disagreement 7 vill be sent to the:Ceneral Manager Nuclear Plants and the Chairman of the SAC for review. !
- 6. Records ,
Minutes shall'be recorded for all meetings of the 0C and shall'
-identify a11; documentary material reviewed. The minutes shall be ..
distributed toleach member of the OC, the Chairman and each member of
- the Safety- Audit Committee, the General Manager Nuclear : Plants and
- others designated by the 0C Chairman.or'Vice Chairman.
- 7. _ Procedures A written charter for the 0C shall be prepared that contains: l a.- Responsibility and authority of the group
+- ;
-: y
. 4 TS.6.2 7-
- b. Content and method of submission of presentations to the Operations Committee ,
- c. Mechanism for scheduling meetings
- d. Provision for meeting agenda C. -Maintenance-Procedures
- 1. Maintenance work requests and their associated procedures required by_
specification 6.5.0 and changes thereto, shall be prepared, reviewed and-approved. Each procedure or procedure change shall be reviewed by-a qualified-individual (s) other than the' individual (s)-who
_ prepared the procedure or procedure change. The appropriate superintendent (as previously designated by the Plant Manager) shall approve these-procedures.
- 2. ' Individuals.responsibleLfor reviews performed in accordance with the-requirements of specification 6.2.C.1 above shall meet or exceed the qualifications described in section 4.2 or'4.4 of ANSI N18.1 1971,and shall be previously designated by the Plant Manager. Such reviews shall include a determination of whether or not additional 'eross disciplinary review is-necessary. ;
- 13. .All reviews shall-include a determination of-the need for a safety evaluation to establish whether or not an unreviewed safety question
-is'invclved.
. - _ _ - - - _ m-