ML20203M532

From kanterella
Revision as of 04:28, 14 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Exemption from Requirements of GDC 35 & Interim Acceptance Criteria for Valves RH-MOV-784 & SI-MOV-24 for Cycle 14 Operation
ML20203M532
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/28/1986
From: Miraglia F
Office of Nuclear Reactor Regulation
To:
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20203M526 List:
References
NUDOCS 8605010563
Download: ML20203M532 (5)


Text