MONTHYEARML20195J4791998-11-19019 November 1998 Exemption from Certain Requirements of 10CFR50.54(w) & 10CFR140.11 Re Reduction in Amount of Insurance Required for Facility ML20238F2111998-08-28028 August 1998 Exemption from Provision of 10CFR50.54(q) That Require Emergency Plans to Meet Standard of 10CFR50.47(b) & Requirements of App E to Part 50 ML20236S1901998-07-15015 July 1998 Exemption from Requirements of 10CFR73.55, Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage ML20245J0081989-08-14014 August 1989 Exemption Permitting one-time Extension of Test Period for Type a Test from 870927,or Later,Until Next Refueling Outage & for Type B & C Tests from 870718,or Later,Until Next Refueling Outage ML20155G1031988-10-0303 October 1988 Temporary Exemption from Schedular Requirements of Property Insurance Rule 10CFR50.54(w)(5)(i),effective 881004 ML20237C1371987-11-27027 November 1987 Exemption from 10CFR50,App R Requirements Re Fire Protection Features in Primary Auxiliary,Svc & Turbine Bldgs & Emergency Lighting in Event of Fire ML20236D2351987-10-15015 October 1987 Exemption from Requirements of App J to 10CFR50,Paragraph III.A.3 to Allow Use of Mass Point Method as Provided in Ansi/Ans 56.8-1981 to Calculate Containment Leakage ML20235S4931987-09-29029 September 1987 Exemption from Requirements of 10CFR50,App J,For All Penetrations Identified in Table 2 of Exemption Package for Period of Two Refueling Outages Following 1987 Outage ML20212M8811986-08-25025 August 1986 Exemption from Schedular Requirements of 10CFR50.48 for Mod to Switchgear Room & Related Plant Areas,To Assure Adequate Level of Fire Protection,Subj to Licensee Submittal of Implementation Plan by 860930 & Subsequent Bimonthly Repts ML20203M5321986-04-28028 April 1986 Exemption from Requirements of GDC 35 & Interim Acceptance Criteria for Valves RH-MOV-784 & SI-MOV-24 for Cycle 14 Operation ML20137R0011985-11-22022 November 1985 Exemption from 10CFR50.71(e)(3)(ii),extending Date to 870630 for Util to File Updated Sar.Exemption Contingent Upon Util Ability to Meet Proposed Identified Guidelines ML20204K0481985-04-11011 April 1985 Exemption from 10CFR50.71(e) for Submittal of Updated Facility Description & Safety Analysis 1998-08-28
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20195H1911999-06-15015 June 1999 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests.Requests That Commission Consent to Two Indirect Transfers of Control & Direct Transfer CY-99-076, Comment Supporting Proposed Rules 10CFR1,2,4,7,9,15,16,76 & 110 Re Initiative to Implement New Document Mgt Sys That Would Permit Electronic Storage,Retrieval & on-line Ordering of Publicly Available NRC Official Records1999-05-20020 May 1999 Comment Supporting Proposed Rules 10CFR1,2,4,7,9,15,16,76 & 110 Re Initiative to Implement New Document Mgt Sys That Would Permit Electronic Storage,Retrieval & on-line Ordering of Publicly Available NRC Official Records ML20204B6631999-02-22022 February 1999 Comment on Recommended Improvements to Oversight Process for Nuclear Power Reactors.Forwards 5th Edition of Nuclear Lemons Assessment of America Worst Commerical Nuclear Power Plants ML20195J4791998-11-19019 November 1998 Exemption from Certain Requirements of 10CFR50.54(w) & 10CFR140.11 Re Reduction in Amount of Insurance Required for Facility ML20195E2361998-11-16016 November 1998 Director'S Decision 98-12,granting Petitioner Request to Investigate Licensee Proposal to Air Cool SFP & Denying Request to Suspend Operating License of Plant ML20154J9991998-09-11011 September 1998 Requests NRC Take Immediate Action to Revoke Util License to Operate Haddam Neck Nuclear Power Station Pursuant to 10CFR2.206 CY-98-139, Comment on Draft NUREG-1625, Proposed Standard TSs for Permanently Defueled Westinghouse Plants1998-09-0101 September 1998 Comment on Draft NUREG-1625, Proposed Standard TSs for Permanently Defueled Westinghouse Plants ML20238F2111998-08-28028 August 1998 Exemption from Provision of 10CFR50.54(q) That Require Emergency Plans to Meet Standard of 10CFR50.47(b) & Requirements of App E to Part 50 ML20236S1901998-07-15015 July 1998 Exemption from Requirements of 10CFR73.55, Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage ML20216B5661998-03-31031 March 1998 Comment Supporting NRC Draft RG DG-1071, Std Format & Content for Post-Shutdown Decommissioning Activities Rept ML20217E9051998-03-13013 March 1998 Requests,Pursuant to 10CFR2.206,that NRC Take Immediate Action to Suspend CYAPCO License to Operate Connecticut Yankee Nuclear Power Station in Haddam Neck,Connecticut ML20199A1631997-10-28028 October 1997 Forwards Final Page of Exhibit 2,P Gunter Ltr to Commission on Behalf of Nirs Re Prs 10CFR2,50 & 51 Involving Immediate Recission of Current Decommissioning Rules,Conducting Site Specific Health Study & EA &/Or EIS ML20199A1351997-10-24024 October 1997 Comment Opposing Proposed Rules 10CFR2,50 & 51 Re Immediate Rescission of Current Decommissioning Rules & Provision for Hearing on Decommissioning Plan for Plant.W/Nirs & Affidavits of M Resnikoff,S Mangiagli & R Bassilakis DD-97-21, Partial Director'S Decision DD-97-21 Denying Request for Immediate Suspension or Revocation of Licenses & Granting Request for Investigation of Possible Matl Misrepresentations,In Response to 961125 & 1223 Petitions1997-09-12012 September 1997 Partial Director'S Decision DD-97-21 Denying Request for Immediate Suspension or Revocation of Licenses & Granting Request for Investigation of Possible Matl Misrepresentations,In Response to 961125 & 1223 Petitions DD-97-19, Partial Director'S Decision DD-97-19,deferring in Part & Denying in Part,Citizens Awareness Network & Nirs 970311 Petition to Commence Enforcement Action Against Util & Impose Civil Penalty1997-09-0303 September 1997 Partial Director'S Decision DD-97-19,deferring in Part & Denying in Part,Citizens Awareness Network & Nirs 970311 Petition to Commence Enforcement Action Against Util & Impose Civil Penalty ML20137P5481997-03-11011 March 1997 Petition Filed on Behalf of Citizens Awareness Network of Massachusetts,Connecticut & Vermont & Nirs to Modify License by Placing Certain Listed Conditions on License & Imposing Civil Penalty,Per 10CFR2.206 ML20137Q9171997-03-0303 March 1997 Constitutes Petition Filed on Behalf of AA Cizek,Per 10CFR2.206,to Modify Licenses Issued to Millstone & Connecticut Yankee by Placing Certain Conditions on OLs ML20134J5891997-01-15015 January 1997 Transcript of 970115 Public Meeting in Higganum,Ct.Pp 1-129. Supporting Documentation Encl ML20133E4651996-12-23023 December 1996 Amend to Citizens Awareness Network & Nirs Petition for Enforcement Per 10CFR2.206 to Revoke Northeast Utilities OL for Connecticut Nuclear Power Stations Due to Chronic, Systemic Mismanagement....* ML20133H1131996-11-25025 November 1996 Petition for Enforcement,Per 10CFR2.206,to Revoke Northeast Utils Operating Licenses for CT Nuclear Power Stations Due to Chronic,Systemic Mismanagement Resulting in Significant Violations of NRC Safety Regulations ML20134P0681996-11-14014 November 1996 Comment on Draft RG DG-1051, Monitoring Effectiveness of Maint at Npp ML20133G2791996-08-29029 August 1996 Transcript of 960829 Connecticut Public Television Broadcast of Citizens Regulatory Commission, Nuclear Safety Issues, Discussion W/Former Employee of Plant.Pp 1-59 ML20059F7761994-01-0303 January 1994 Comment on Proposed Rule 10CFR73 Re Proposal to Amend Its Physical Protection Regulations for Operating Nuclear Power Reactors by Modifying Design Basis Threat for Radiological Sabotage B14644, Comment on Proposed Rules 10CFR30,40,50,60,70 & 72 Re Whistleblower Protection for Nuclear Power Plant Employees.Supports Rules1993-10-14014 October 1993 Comment on Proposed Rules 10CFR30,40,50,60,70 & 72 Re Whistleblower Protection for Nuclear Power Plant Employees.Supports Rules B14346, Comment Supporting Draft RG DG-1020, Monitoring Effectiveness of Maint at Nuclear Power Plants1993-01-15015 January 1993 Comment Supporting Draft RG DG-1020, Monitoring Effectiveness of Maint at Nuclear Power Plants ML20059P0631990-10-15015 October 1990 Comment on Proposed Rules 10CFR2,50 & 54 Re Nuclear Power Plant License Renewal.Endorses Comments Submitted by NUMARC B13572, Comment Opposing Petition for Rulemaking PRM-50-55 Re Periodicity of Submissions of FSAR Revs1990-07-0202 July 1990 Comment Opposing Petition for Rulemaking PRM-50-55 Re Periodicity of Submissions of FSAR Revs B13567, Comment on Proposed Rule 10CFR55 Re Operators Licenses Mod for fitness-for-duty.Endorses NUMARC Position That Rule Challenges Licensed Operators Trustworthiness W/O Justification & Would Affect Morale of Licensed Operators1990-07-0202 July 1990 Comment on Proposed Rule 10CFR55 Re Operators Licenses Mod for fitness-for-duty.Endorses NUMARC Position That Rule Challenges Licensed Operators Trustworthiness W/O Justification & Would Affect Morale of Licensed Operators B13367, Comment on Proposed Rules 10CFR30,40,50,60,70,72 & 150 Re Preserving Free Flow of Info to Commission.Nrc Made Wise Choice to Not Impose Any Obligation on Private Parties to Include Affirmative Statement in Employment Agreements1989-09-20020 September 1989 Comment on Proposed Rules 10CFR30,40,50,60,70,72 & 150 Re Preserving Free Flow of Info to Commission.Nrc Made Wise Choice to Not Impose Any Obligation on Private Parties to Include Affirmative Statement in Employment Agreements ML20245J0081989-08-14014 August 1989 Exemption Permitting one-time Extension of Test Period for Type a Test from 870927,or Later,Until Next Refueling Outage & for Type B & C Tests from 870718,or Later,Until Next Refueling Outage ML20245G0721989-08-0303 August 1989 Comment on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. Recommends That NRC Recommendation on Trust Agreement Wording Be Deleted or NRC Should Grandfather Existing Trusts Such as for Plants ML20246K4801989-07-0505 July 1989 Comment Opposing Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components ML20246N9471989-03-0808 March 1989 Comment on Proposed Rev 3 to Reg Guide 1.9 Re Selection Design,Qualification,Testing & Reliability of Diesel Generator Units Used as Onsite Electric Power Sys at Nuclear Power Plants B13113, Comment on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units.... Util Recommends Rule Be Revised to Incorporate Addl Flexibility in Considering Age of Diesel1989-03-0808 March 1989 Comment on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units.... Util Recommends Rule Be Revised to Incorporate Addl Flexibility in Considering Age of Diesel ML20236B4641989-03-0808 March 1989 Comments on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units Used as Onsite Electric Power Sys at Nuclear Power Plants. Reg Guide Does Not Provide Flexibility B13136, Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants.Proposed Rule on Maint Will Not Improve Maint in Plants Nor Improve Safety or Reliability of Plants.Proposed Rule Much Too Vague1989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants.Proposed Rule on Maint Will Not Improve Maint in Plants Nor Improve Safety or Reliability of Plants.Proposed Rule Much Too Vague ML20235N5471989-02-0909 February 1989 Undated Comment Opposing Proposed Rules 10CFR50 & 55 Re Education & Experience for Senior Reactor Operators & Supervisors at Nuclear Power Plants.Neither Alternative Acceptable or Needed ML20206M5321988-11-21021 November 1988 Comment Supporting Proposed Rule 10CFR26 Re fitness-for-duty Program ML20155G1031988-10-0303 October 1988 Temporary Exemption from Schedular Requirements of Property Insurance Rule 10CFR50.54(w)(5)(i),effective 881004 ML20196E5931988-06-22022 June 1988 Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations B12891, Comment Opposing Proposed Rule 10CFR50 Re Licensee Announcement of Inspector on Site1988-04-18018 April 1988 Comment Opposing Proposed Rule 10CFR50 Re Licensee Announcement of Inspector on Site ML20151A8881988-03-31031 March 1988 Comments Supporting Proposed Rule 10CFR50 Re Leakage Testing of Containment to Permit Use of Mass Point Method as Alternative Method for Calculating Containment Leakage Rates.Mass Point Method More Accurate for Calculating Rates B12870, Comment Supporting Proposed Rule 10CFR50 Re Leakage Testing of Containments to Permit Use of Mass Point Method as Alternative Method for Calculating Containment Leakage Rates1988-03-31031 March 1988 Comment Supporting Proposed Rule 10CFR50 Re Leakage Testing of Containments to Permit Use of Mass Point Method as Alternative Method for Calculating Containment Leakage Rates ML20147C3191988-01-0606 January 1988 Comment Opposing SRP Section 3.6.3 of NUREG-0800.Utils Endorse Comments by Nuclear Util Group on Equipment Qualification ML20237C1371987-11-27027 November 1987 Exemption from 10CFR50,App R Requirements Re Fire Protection Features in Primary Auxiliary,Svc & Turbine Bldgs & Emergency Lighting in Event of Fire ML20236D2351987-10-15015 October 1987 Exemption from Requirements of App J to 10CFR50,Paragraph III.A.3 to Allow Use of Mass Point Method as Provided in Ansi/Ans 56.8-1981 to Calculate Containment Leakage B12706, Comment Supporting Proposed Rule 10CFR50 Re Rev of Backfitting Process for Power Reactors1987-10-13013 October 1987 Comment Supporting Proposed Rule 10CFR50 Re Rev of Backfitting Process for Power Reactors ML20235S4931987-09-29029 September 1987 Exemption from Requirements of 10CFR50,App J,For All Penetrations Identified in Table 2 of Exemption Package for Period of Two Refueling Outages Following 1987 Outage ML20212M8811986-08-25025 August 1986 Exemption from Schedular Requirements of 10CFR50.48 for Mod to Switchgear Room & Related Plant Areas,To Assure Adequate Level of Fire Protection,Subj to Licensee Submittal of Implementation Plan by 860930 & Subsequent Bimonthly Repts ML20205F4181986-08-12012 August 1986 Correction to Commission 860702 Order Confirming Licensee Commitments on Emergency Response Capability 1999-06-15
[Table view] |
Text
. _ _ _ _ _ _ _ _ _ _
liflITED STATES OF AMERICA t'UCLEAR REGULATORY COMMISSI0f!
In the Matter of )
)
CONNECTICllT YANKEE ATOMIC POWER ) Docket No. 50-213 COMPANY )
1 (Paddam Neck Plant) i EXEMPTION I.
Conn cticut Yankee Ato.mic Power Comnany (the licensee) is the holder of
~
. F_acility Operating License No. DPR-61 which authorizes the operation of the ,
Paddam Neck Plant (the facility) at the steady-state power levels not in excess of 18P5 mecewatts thernal~. The facility;11,a pressurized wateAreactor located at the licensee's site in Middlesex County, Connecticut. ThelIc'ense provides, among other thinos, that it! is sub.iect to all rules, regulations and Orders of the Nuclear Regulatory Commission (the Commissioni now or hereafter in effect.
.. II.
Section 50.71(e)(3)(ii).0,f 10,CFR Part 50 requires that those plants initiallysub.iectt[theNRC'ssystematicevaluationprogram(SEP)mustfile 4
a complete upda-ted final safety analysis report within P4 months after receipt
. o' notificatior! that the SEP has been_ completed. By letter dated July 20, 1983, the staff informed Connecticut Yankee Atomic Power Company (CYAPCo) that tne SEP had been completed for the Haddan Neck Plant and that, pursuant to 10 CFR 50.71(e)(3), the licensee was required to file ar updated Facility 8504250299 DR 850411 ADOCK 05000213 PDR
Descriotion and Sa#ety Analysis (FDSA). By letter dated February 4, 1985, the licensee requested an exemption to defer submittal of the updated FDSA on the bases that ongoing reviews would directly affect the content of the updated '
FDSA and that the required submittal would affect the work o# the licensee's engineering personnel ~on issues of higher safety significance.
The NRC staff has reviewed the licensee's request for an exemption from the Haddam Neck updated FDSA submittal date. For most plants covered by 10 CFP.
50.71 (el(3)(ii), anple. tim'e was available for updating the FDSA within the 24 6onth interval allowed in the regulations. However, the Haddam Neck Plant ~
recuested participation in an_ expanded assessment of outstanding regulatory
~
recuirements with the idea of estab1'ishing an intibrated schedule for The.
conoletion of these issues in a resource efficient nanner.
In addition the licensee has other ongoing activities which would directly affect the auality and substance of an updated FDSA. For example, CYAPCo is contracting with Westinghouse to develop and document detailed in#ormation on the decian and licensing bases for key systems at the Heddam Neck Plant. CYAPCo.has undertaken an extensive design bases reanalysis hihich will result in new analyses for all FDSA Chapter 10 transients and accidents and for several SEP topics. The licensee believes that these additional efforts will facilitate a*better understanding of the plant design bases when the updated FDSA is subnitted. -
The staff is also implementing a limited Integrated Safety Assessment Progran (ISAP) for the Haddam Neck Plant. Because the licensee had placed the updating of its FDSA into its original integrated assessment proposal, the staff will be reviewing that licensing action as part of its screening review of ISAP related topics. The Commission has authorized the staff in its policy statement on ISAP (49 FR 45112), to suspend specific existing implementation schedule requirements for plants to be reviewed under ISAP.
However, the staff bel'ieves that a current FDSA is a vital and.necessary
. fool in documenting the design bases of safety systems at the Haddam Neck ~~~
Plant as well as establishing the bases for future plant modifications and changes to technical specifications. WhileHaldaENeckhasshowngoo7 pause for_the requested exemption, the staff has determined that only a 6 month exemption from compliance with 10 CFR 50.71 is warranted at this time. Any additional exemptions from compliance from 10 CFR 50.71 will be granted by the Director of Licensing only upon review and approval of a program plan containing comprehensive schedules or milestones for the submittal of an updated FDSA for the.Haddam Feck Plant.
The NRC staff considered safety aspects of the requested exemotion from the updated FDSA submittal date. The proposed exemption affects only the reouired date fo~r updating the-FSAP and does not affect the risk of facility accidents. Thus, the granting ~of the requested exemption will have no significant impact on plant safety.
III.
The public interest will be served by. granting the exemption since the licensee can continue to use its personnel to complete other work of higher safety significance sooner than would be the case if personnel were diverted to update the FDSA immediately.
Based on its review, the staff concludes that issuance of this exemption will have no significant effect o'n plant safety. Further, this action.is in
~
~
the public interest and good cause-has been shown to support the exemption.
Therefore, a 6 month exemption from.the date of issuance of this exemption is
. : . +
being granted by the staff for the submittal of an updated FDSA for the -
Haddam Neck Plant.
Pursuant to 10 CFR 51.32, the Commission has determined that the granting of this exemption will have no significant impact on the environment (50 FR 13433, April 4, 1985).
~
Accordingly, the Commission has determined that, pursuant to 10 CFR
~
50.12,'an exemption is authorized by law and will not endanger life or
~
property or the common defense.and security and is otherwise in the public interest. Therefore, the Commission hereby approves the following temporary exemptionfromcompiiancewith50.7I(e).
An updated FDSA containing those original pages of'the FDSA that are still applicable plus new replacement pages shall be filed on or before a date 6 months from the date of issuance of the exemption. This updated FDSA shall bring the
S.
FDSA up to date as of a maximum of 6 months prior to the date of filing the uodated FDSA, with subsequent revisions no less frequently than annually thereafter. Any additional exemptions from compliance with 10 CFR 50.71 will be granted by the Director of Licensing only upon review and approval of a orogram plan containing comprehensive schedules or milestones for the submittal of an updated FDSA for the Haddam Neck Plant.
-Dated at Bethesda, Maryland, this 11 day of April 1985.
FOR THE NUCLEAR REGULATORY COMMISSION
~
O f Hu h g Thocpson, J ., IV 'tdr%
D ion of Licensi g -.
Of e of Nuclear Reac Regulatibn 946 e
p+4 g b