MONTHYEARML20195J4791998-11-19019 November 1998 Exemption from Certain Requirements of 10CFR50.54(w) & 10CFR140.11 Re Reduction in Amount of Insurance Required for Facility ML20238F2111998-08-28028 August 1998 Exemption from Provision of 10CFR50.54(q) That Require Emergency Plans to Meet Standard of 10CFR50.47(b) & Requirements of App E to Part 50 ML20236S1901998-07-15015 July 1998 Exemption from Requirements of 10CFR73.55, Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage ML20245J0081989-08-14014 August 1989 Exemption Permitting one-time Extension of Test Period for Type a Test from 870927,or Later,Until Next Refueling Outage & for Type B & C Tests from 870718,or Later,Until Next Refueling Outage ML20155G1031988-10-0303 October 1988 Temporary Exemption from Schedular Requirements of Property Insurance Rule 10CFR50.54(w)(5)(i),effective 881004 ML20237C1371987-11-27027 November 1987 Exemption from 10CFR50,App R Requirements Re Fire Protection Features in Primary Auxiliary,Svc & Turbine Bldgs & Emergency Lighting in Event of Fire ML20236D2351987-10-15015 October 1987 Exemption from Requirements of App J to 10CFR50,Paragraph III.A.3 to Allow Use of Mass Point Method as Provided in Ansi/Ans 56.8-1981 to Calculate Containment Leakage ML20235S4931987-09-29029 September 1987 Exemption from Requirements of 10CFR50,App J,For All Penetrations Identified in Table 2 of Exemption Package for Period of Two Refueling Outages Following 1987 Outage ML20212M8811986-08-25025 August 1986 Exemption from Schedular Requirements of 10CFR50.48 for Mod to Switchgear Room & Related Plant Areas,To Assure Adequate Level of Fire Protection,Subj to Licensee Submittal of Implementation Plan by 860930 & Subsequent Bimonthly Repts ML20203M5321986-04-28028 April 1986 Exemption from Requirements of GDC 35 & Interim Acceptance Criteria for Valves RH-MOV-784 & SI-MOV-24 for Cycle 14 Operation ML20137R0011985-11-22022 November 1985 Exemption from 10CFR50.71(e)(3)(ii),extending Date to 870630 for Util to File Updated Sar.Exemption Contingent Upon Util Ability to Meet Proposed Identified Guidelines ML20204K0481985-04-11011 April 1985 Exemption from 10CFR50.71(e) for Submittal of Updated Facility Description & Safety Analysis 1998-08-28
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20195H1911999-06-15015 June 1999 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests.Requests That Commission Consent to Two Indirect Transfers of Control & Direct Transfer CY-99-076, Comment Supporting Proposed Rules 10CFR1,2,4,7,9,15,16,76 & 110 Re Initiative to Implement New Document Mgt Sys That Would Permit Electronic Storage,Retrieval & on-line Ordering of Publicly Available NRC Official Records1999-05-20020 May 1999 Comment Supporting Proposed Rules 10CFR1,2,4,7,9,15,16,76 & 110 Re Initiative to Implement New Document Mgt Sys That Would Permit Electronic Storage,Retrieval & on-line Ordering of Publicly Available NRC Official Records ML20204B6631999-02-22022 February 1999 Comment on Recommended Improvements to Oversight Process for Nuclear Power Reactors.Forwards 5th Edition of Nuclear Lemons Assessment of America Worst Commerical Nuclear Power Plants ML20195J4791998-11-19019 November 1998 Exemption from Certain Requirements of 10CFR50.54(w) & 10CFR140.11 Re Reduction in Amount of Insurance Required for Facility ML20195E2361998-11-16016 November 1998 Director'S Decision 98-12,granting Petitioner Request to Investigate Licensee Proposal to Air Cool SFP & Denying Request to Suspend Operating License of Plant ML20154J9991998-09-11011 September 1998 Requests NRC Take Immediate Action to Revoke Util License to Operate Haddam Neck Nuclear Power Station Pursuant to 10CFR2.206 CY-98-139, Comment on Draft NUREG-1625, Proposed Standard TSs for Permanently Defueled Westinghouse Plants1998-09-0101 September 1998 Comment on Draft NUREG-1625, Proposed Standard TSs for Permanently Defueled Westinghouse Plants ML20238F2111998-08-28028 August 1998 Exemption from Provision of 10CFR50.54(q) That Require Emergency Plans to Meet Standard of 10CFR50.47(b) & Requirements of App E to Part 50 ML20236S1901998-07-15015 July 1998 Exemption from Requirements of 10CFR73.55, Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage ML20216B5661998-03-31031 March 1998 Comment Supporting NRC Draft RG DG-1071, Std Format & Content for Post-Shutdown Decommissioning Activities Rept ML20217E9051998-03-13013 March 1998 Requests,Pursuant to 10CFR2.206,that NRC Take Immediate Action to Suspend CYAPCO License to Operate Connecticut Yankee Nuclear Power Station in Haddam Neck,Connecticut ML20199A1631997-10-28028 October 1997 Forwards Final Page of Exhibit 2,P Gunter Ltr to Commission on Behalf of Nirs Re Prs 10CFR2,50 & 51 Involving Immediate Recission of Current Decommissioning Rules,Conducting Site Specific Health Study & EA &/Or EIS ML20199A1351997-10-24024 October 1997 Comment Opposing Proposed Rules 10CFR2,50 & 51 Re Immediate Rescission of Current Decommissioning Rules & Provision for Hearing on Decommissioning Plan for Plant.W/Nirs & Affidavits of M Resnikoff,S Mangiagli & R Bassilakis DD-97-21, Partial Director'S Decision DD-97-21 Denying Request for Immediate Suspension or Revocation of Licenses & Granting Request for Investigation of Possible Matl Misrepresentations,In Response to 961125 & 1223 Petitions1997-09-12012 September 1997 Partial Director'S Decision DD-97-21 Denying Request for Immediate Suspension or Revocation of Licenses & Granting Request for Investigation of Possible Matl Misrepresentations,In Response to 961125 & 1223 Petitions DD-97-19, Partial Director'S Decision DD-97-19,deferring in Part & Denying in Part,Citizens Awareness Network & Nirs 970311 Petition to Commence Enforcement Action Against Util & Impose Civil Penalty1997-09-0303 September 1997 Partial Director'S Decision DD-97-19,deferring in Part & Denying in Part,Citizens Awareness Network & Nirs 970311 Petition to Commence Enforcement Action Against Util & Impose Civil Penalty ML20137P5481997-03-11011 March 1997 Petition Filed on Behalf of Citizens Awareness Network of Massachusetts,Connecticut & Vermont & Nirs to Modify License by Placing Certain Listed Conditions on License & Imposing Civil Penalty,Per 10CFR2.206 ML20137Q9171997-03-0303 March 1997 Constitutes Petition Filed on Behalf of AA Cizek,Per 10CFR2.206,to Modify Licenses Issued to Millstone & Connecticut Yankee by Placing Certain Conditions on OLs ML20134J5891997-01-15015 January 1997 Transcript of 970115 Public Meeting in Higganum,Ct.Pp 1-129. Supporting Documentation Encl ML20133E4651996-12-23023 December 1996 Amend to Citizens Awareness Network & Nirs Petition for Enforcement Per 10CFR2.206 to Revoke Northeast Utilities OL for Connecticut Nuclear Power Stations Due to Chronic, Systemic Mismanagement....* ML20133H1131996-11-25025 November 1996 Petition for Enforcement,Per 10CFR2.206,to Revoke Northeast Utils Operating Licenses for CT Nuclear Power Stations Due to Chronic,Systemic Mismanagement Resulting in Significant Violations of NRC Safety Regulations ML20134P0681996-11-14014 November 1996 Comment on Draft RG DG-1051, Monitoring Effectiveness of Maint at Npp ML20133G2791996-08-29029 August 1996 Transcript of 960829 Connecticut Public Television Broadcast of Citizens Regulatory Commission, Nuclear Safety Issues, Discussion W/Former Employee of Plant.Pp 1-59 ML20059F7761994-01-0303 January 1994 Comment on Proposed Rule 10CFR73 Re Proposal to Amend Its Physical Protection Regulations for Operating Nuclear Power Reactors by Modifying Design Basis Threat for Radiological Sabotage B14644, Comment on Proposed Rules 10CFR30,40,50,60,70 & 72 Re Whistleblower Protection for Nuclear Power Plant Employees.Supports Rules1993-10-14014 October 1993 Comment on Proposed Rules 10CFR30,40,50,60,70 & 72 Re Whistleblower Protection for Nuclear Power Plant Employees.Supports Rules B14346, Comment Supporting Draft RG DG-1020, Monitoring Effectiveness of Maint at Nuclear Power Plants1993-01-15015 January 1993 Comment Supporting Draft RG DG-1020, Monitoring Effectiveness of Maint at Nuclear Power Plants ML20059P0631990-10-15015 October 1990 Comment on Proposed Rules 10CFR2,50 & 54 Re Nuclear Power Plant License Renewal.Endorses Comments Submitted by NUMARC B13572, Comment Opposing Petition for Rulemaking PRM-50-55 Re Periodicity of Submissions of FSAR Revs1990-07-0202 July 1990 Comment Opposing Petition for Rulemaking PRM-50-55 Re Periodicity of Submissions of FSAR Revs B13567, Comment on Proposed Rule 10CFR55 Re Operators Licenses Mod for fitness-for-duty.Endorses NUMARC Position That Rule Challenges Licensed Operators Trustworthiness W/O Justification & Would Affect Morale of Licensed Operators1990-07-0202 July 1990 Comment on Proposed Rule 10CFR55 Re Operators Licenses Mod for fitness-for-duty.Endorses NUMARC Position That Rule Challenges Licensed Operators Trustworthiness W/O Justification & Would Affect Morale of Licensed Operators B13367, Comment on Proposed Rules 10CFR30,40,50,60,70,72 & 150 Re Preserving Free Flow of Info to Commission.Nrc Made Wise Choice to Not Impose Any Obligation on Private Parties to Include Affirmative Statement in Employment Agreements1989-09-20020 September 1989 Comment on Proposed Rules 10CFR30,40,50,60,70,72 & 150 Re Preserving Free Flow of Info to Commission.Nrc Made Wise Choice to Not Impose Any Obligation on Private Parties to Include Affirmative Statement in Employment Agreements ML20245J0081989-08-14014 August 1989 Exemption Permitting one-time Extension of Test Period for Type a Test from 870927,or Later,Until Next Refueling Outage & for Type B & C Tests from 870718,or Later,Until Next Refueling Outage ML20245G0721989-08-0303 August 1989 Comment on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. Recommends That NRC Recommendation on Trust Agreement Wording Be Deleted or NRC Should Grandfather Existing Trusts Such as for Plants ML20246K4801989-07-0505 July 1989 Comment Opposing Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components ML20246N9471989-03-0808 March 1989 Comment on Proposed Rev 3 to Reg Guide 1.9 Re Selection Design,Qualification,Testing & Reliability of Diesel Generator Units Used as Onsite Electric Power Sys at Nuclear Power Plants B13113, Comment on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units.... Util Recommends Rule Be Revised to Incorporate Addl Flexibility in Considering Age of Diesel1989-03-0808 March 1989 Comment on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units.... Util Recommends Rule Be Revised to Incorporate Addl Flexibility in Considering Age of Diesel ML20236B4641989-03-0808 March 1989 Comments on Proposed Rev 3 to Reg Guide 1.9, Selection, Design,Qualification,Testing & Reliability of Diesel Generator Units Used as Onsite Electric Power Sys at Nuclear Power Plants. Reg Guide Does Not Provide Flexibility B13136, Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants.Proposed Rule on Maint Will Not Improve Maint in Plants Nor Improve Safety or Reliability of Plants.Proposed Rule Much Too Vague1989-02-27027 February 1989 Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants.Proposed Rule on Maint Will Not Improve Maint in Plants Nor Improve Safety or Reliability of Plants.Proposed Rule Much Too Vague ML20235N5471989-02-0909 February 1989 Undated Comment Opposing Proposed Rules 10CFR50 & 55 Re Education & Experience for Senior Reactor Operators & Supervisors at Nuclear Power Plants.Neither Alternative Acceptable or Needed ML20206M5321988-11-21021 November 1988 Comment Supporting Proposed Rule 10CFR26 Re fitness-for-duty Program ML20155G1031988-10-0303 October 1988 Temporary Exemption from Schedular Requirements of Property Insurance Rule 10CFR50.54(w)(5)(i),effective 881004 ML20196E5931988-06-22022 June 1988 Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations B12891, Comment Opposing Proposed Rule 10CFR50 Re Licensee Announcement of Inspector on Site1988-04-18018 April 1988 Comment Opposing Proposed Rule 10CFR50 Re Licensee Announcement of Inspector on Site ML20151A8881988-03-31031 March 1988 Comments Supporting Proposed Rule 10CFR50 Re Leakage Testing of Containment to Permit Use of Mass Point Method as Alternative Method for Calculating Containment Leakage Rates.Mass Point Method More Accurate for Calculating Rates B12870, Comment Supporting Proposed Rule 10CFR50 Re Leakage Testing of Containments to Permit Use of Mass Point Method as Alternative Method for Calculating Containment Leakage Rates1988-03-31031 March 1988 Comment Supporting Proposed Rule 10CFR50 Re Leakage Testing of Containments to Permit Use of Mass Point Method as Alternative Method for Calculating Containment Leakage Rates ML20147C3191988-01-0606 January 1988 Comment Opposing SRP Section 3.6.3 of NUREG-0800.Utils Endorse Comments by Nuclear Util Group on Equipment Qualification ML20237C1371987-11-27027 November 1987 Exemption from 10CFR50,App R Requirements Re Fire Protection Features in Primary Auxiliary,Svc & Turbine Bldgs & Emergency Lighting in Event of Fire ML20236D2351987-10-15015 October 1987 Exemption from Requirements of App J to 10CFR50,Paragraph III.A.3 to Allow Use of Mass Point Method as Provided in Ansi/Ans 56.8-1981 to Calculate Containment Leakage B12706, Comment Supporting Proposed Rule 10CFR50 Re Rev of Backfitting Process for Power Reactors1987-10-13013 October 1987 Comment Supporting Proposed Rule 10CFR50 Re Rev of Backfitting Process for Power Reactors ML20235S4931987-09-29029 September 1987 Exemption from Requirements of 10CFR50,App J,For All Penetrations Identified in Table 2 of Exemption Package for Period of Two Refueling Outages Following 1987 Outage ML20212M8811986-08-25025 August 1986 Exemption from Schedular Requirements of 10CFR50.48 for Mod to Switchgear Room & Related Plant Areas,To Assure Adequate Level of Fire Protection,Subj to Licensee Submittal of Implementation Plan by 860930 & Subsequent Bimonthly Repts ML20205F4181986-08-12012 August 1986 Correction to Commission 860702 Order Confirming Licensee Commitments on Emergency Response Capability 1999-06-15
[Table view] |
Text
UNITED STATES OF APERICA NUCLEAR REGULATORY COMMISSION In the Pt.tter of CONNECTICUT YANKEE ATOMIC Docket No. 50-213 POWER COMPANY , .
\
j (Haddam Neck Plart)
)
EXEMPTION I.
Connecticut Yankee Atomic Power Company (the licensee) is the holder of Facility Operating License No. DPR-61 which authorizes the operation of the Haddam Neck Plant (the facility) at the steady-state pcwer levels not in excess of 1825 regawatts thermal. The facility is a pressurized water reactor located at the licensee's site in Middlesex County, Connecticut.
The license provides, among other things, that it is subject to all rules, regulations and orders of the Nuclear Regulatory Commission (the Concission) row er bereafter in effect.
II.
J Section 50.71(e)(3)(ii) of 10 CFR Part.50 requires that those plants
~
initially subject to the NRC's systematic evaluation program (SEP) must file a complete updated final safety eralysis ' report within 24 months after receipt of notificatic.) that the SEP has been completed. By letter dated July 20, 1983, the staff informed Ccrrecticut Yankee Atomic Power Company (CYAPCO) that SEP had been completed for the Haddam Neck Plant and that, pursuant to 10 CFR 50.71(e)(3), the licensee was required to file an 8512050407 851122 PDR ADOCK 05000213 <
P PDR
.~
updated Facility Description and Safety Analysis (FDSA). By letter dated February 4,1985 the licensee reevested an exemption to defer submittal of the updated FDSA on the bases that ongoing reviews (e.g., the Integrated Safety Assessment Prcgrar) would directly affect the content of the updated FDSA and that the required submittal would affect the work of the licensee's engineering persenrel on issues of higher safety significance.
The NRC staff reviewed the licensee's request and granted the exemption, by letter dated /pril 11, 1985. However, the staff determined that only a six month exemption from compliance with 10 CFR 50.71 was warranted at that time._ As detailed in the April 11, 1985 exemption, any additional exemptions fren compliance with 10 CFR 50.71 would be granted by the Director of Licensirg enly upon review and approval of a program plan containing schedules or milestones for the submittal of an updated FDSA for the Haddam Neck Plant.
By letter dated September 13, 1985, the licensee requested an additional exemption from the schedular requirements of 10 CFR 50.71 for the submittal date of an updated FDSA. However, the NRC staff, by letter dated October 2, 1985, inforred CYAPCO that this exemption request was not responsive to the
- terms identified in the exemption granted on April 11, 1985, and therefore, the exemption reouest was denied. The denial was based on the licensee's failure to supply the required milestones or schedules, but left open the possibility of further consideration by the staff provided the licensee took certain actions by October 11, 1985.
Py letter dated October 11,1985, CYAPC0 resubmitted a request for ar additional exerption to the schedular requirements of 10 CFR 50.71 for er updated FDSA. In that letter, CYAPC0 stated that the FOSA update would be based largely on the format of Regulatory Guide 1.70, Revision 3, which wculd result ir a r' ore comprehensive document than would result from minimal compliance with 10 CFR 50.71. CYAPC0 also provided milestor.es fer the submittal of component parts of an updated FDSA and a completion schedule for the entire FDSA update. The following are the commitments made and the scheduled completion dates:
PROGRAM SUBMITTAL DATE
- 1. Provide a concise program description and April 30, 1986 current reference to stand alone documentation for:
a) Radiation Protoction b) Emergency Planning c) Industrial Security d) Ouality Assurance e) Technical Specifications f) Radiclogical Effluent Monitoring and Offsite Dose Calculation Fanual and Plant Process Control Program
- 2. Provide a complete revision and update of June 30, 1986 the facility accident aralyses 1
L.
f PROGPAM SUBMITTAL DATE
- 3. Provide current systems descriptions and July 1, 1986 instrumentation drawirgs for all safety-related systems and major balance-of-plant systems 4 Provide updated FDSA Chapters 1, 2, 4, March 31, 1987 7, 8, 10, 11, 12, 13, 15, 16, 17
- 5. Provide remaining FDSA Chapters with Jure ?0, 1987 some editing of the earlier submittals Based upon these milestones, the licensee requested relief from the completion date reouirement for the updated FDSA until June 30, 1987.
The staff has reviewed the licensee's ' request for an exerption from the Haddam Neck Plant updated FDSA submittal date. The staff finds that the licensee's request meets the reautrements identified in the exemption granted on April 11, 1985 and also finds the proposed and completier schedule to be l
- acceptable.
l The NRC staff considered safety aspects of the requested exemption from tFe updated FDSA submittal date. The proposed exemption affects only the j recuired date for updating the FDSA and does not affect the risk of facility l accidents. Thus, the granting of the requested exemption will have no significant impact on plant safety.
1 I
i I
_ . ~ .
= The public interest will be served by granting the exemption since the licensee can continue to use its personnel to complete other work of higher safety significance sooner than would be the case if personnel or other resources were divertad to update the FDSA immediately.
Based on its review, the staff corcludes that issuance of this exemption will have no significant effect on plant safety. Further, this action is in the public interest and good cause has been shown to support the exemption.
Therefore, an exemption until June 30, 1987 is being granted by the staff for the submittal of an updated FDSA for the Haddam Neck Plant. Any significant deviation from the proposed completion schedule (i.e., failure to supply information within 30 days of the scheduled completion date) will be considered a violatier of the ter.ms of the exemption and may result in the voiding of the exemptier. er.d subsequent enforcement / compliance action. The Director, Divisien of Licensing, ONRR, may grant changes to the scheduled milestores if the licensee's recuest is timely and shows good cause for the proposed change.
However, the staff will not consider any subsequent exemption requests beyond the currently scheduled June 30, 1987 completion date.
Pursuant to 10 CFR 51.32, the Commission has determined that the orantirg of this exemption will have no significant impact on the environment (50 FR 48144, November 21,1985).
I
III.
Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12, an exemption is authorized by law and will rot endanger life or property or the common defense and security and is otherwise in the public interest.
Therefore, the Commission hereby approves the following temporary exemption from compliance with 50.71(e).
An updated FSAR containing those original pages of the FDSA that are still applicable plus updated replacement pages shall be filed under the schedule and conditions described in Section II above. The final completion date for the FDSA update effort shall be June 30, 1987. This updated FDSA shall bring the FDSA up to date as of a maximum of 6 months prior to the date of filing the updated FDSA, with subsequent revisions no less frequently than annually thereafter.
Dated at Bethesda, Maryland, this P2nd day of November 1985.
FOR THE NUCLEAR REGULATORY COMMISSION
, ennis M. 'tchfield Acting Director Division of Licensin Office of Nuclear Reactor Regulation l