MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program ML20216F1001998-04-15015 April 1998 Safety Evaluation Accepting 980331 Licensee Proposal to Perform Alternative Testing for Containment Pressurization Test for Vynp ML20217F3421998-03-25025 March 1998 SER Accepting Plans for 1998 & 1999 Refueling Outages Re Reactor Vessel Internals for Plant ML20212H1521998-03-0606 March 1998 Correction to Page 7 of SE Re Relief Request for Third 10-yr Interval Pump & Valve IST Program for Plant ML20217N4911998-02-27027 February 1998 SER Pertaining to Cracking of EDG Lube Oil Piping at Vermont Yankee ML20198P9941998-01-15015 January 1998 SE Authorizing Relief Requests for Third Interval Pump & Valve Inservice Testing Program ML20141A4151997-06-18018 June 1997 Revised SE Accepting Proposed Onsite Disposal of Slightly Contaminated Silt Removed from Vermont Yankee Cooling Towers ML20135E5401997-03-0303 March 1997 Safety Assessment Accepting Mod of RHR & CS Sys Containment Isolation Function Configuration ML20134N8271996-11-20020 November 1996 Safety Evaluation Accepting Licensee Scope & Insp Methods Proposed for Insp of Core Spray Internal Piping During Fall 1996 Refueling Outage at Plant ML20134F9631996-11-0505 November 1996 Safety Evaluation Re Power/Flow Exclusion Region Calculation Method Using LAPUR5 Computer Code & Implementation of Solomon Stability Monitor for Licensee Facility ML20128N3531996-10-11011 October 1996 Safety Evaluation Accepting Licensee Flaw Evaluation of Indication Found During Reactor Pressure Vessel Insp at Plant ML20129G3611996-10-0202 October 1996 Safety Evaluation Accepting Proposed Repair for Plant Core Shroud ML20057A6991993-09-0303 September 1993 Safety Evaluation of IST Program Relief Requests for Pumps & Valves for Third 10-yr Insp Interval ML20057A2791993-08-12012 August 1993 Safety Evaluation Accepting Licensee Reasons Given for Delay in Completing short-term Actions Requested in Ieb 93-003, Resolution of Issues Re to Rv Water Level Instrumentation in Bwrs ML20246D7731989-08-21021 August 1989 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Item 2.2.1, Required Actions Based on Generic Implications of Salem ATWS Events. Equipment Classification Program for safety-related Components Acceptable ML20244D0311989-06-0707 June 1989 Safety Evaluation Accepting Util Second 10-yr Interval Inservice Insp Program Plan ML20205T4181988-10-14014 October 1988 Errata to Safety Evaluation Concluding Util Submittal Re Spent Fuel Pool Expansion ML20204F7271988-10-14014 October 1988 Safety Evaluation Supporting Proposed Expansion of Spent Fuel Pool at Facility ML20236N6461987-08-0707 August 1987 Safety Evaluation Re Permanent Elimination of Liquid Penetrant Exam of Feedwater Nozzles at Facility.Due to Lack of Reasonable Assurance That Ultrasonic Exam Can Totally Replace Penetrant Exam,Request Unacceptable ML20214T9891987-05-28028 May 1987 Safety Evaluation Re Util 870112 Proposed Plans to Inspect Two Overlay Repaired Core Spray safe-ends in Lieu of Replacement During Upcoming 1987 Refueling Outage.Plans Acceptable,Providing That Insp Results Satisfactory ML20207S7801987-03-12012 March 1987 Safety Evaluation Granting Relief from Tech Spec 4.7.A.3 on one-time Basis to Perform RHR Pump Wear Ring Replacement ML20214T4921986-11-24024 November 1986 Safety Evaluation Accepting Licensee 830511 & 860117 Responses to Generic Ltr 83-08 Re Mod of Vaccum Breakers on Mark I Containments ML20215M5871986-10-24024 October 1986 Preliminary Evaluation of Containment Study Transmitted w/860902 Ltr.Licensee Estimates Appear Optimistic Considering Uncertainties Inherent in Failure Rate Data ML20206F3651986-06-16016 June 1986 Safety Evaluation Re Proposed Repair of Core Spray safe- Ends,During Current Refueling Outage.Plant Can Be Safely Returned to Power Operation After Satisfactory Completion of Core Spray safe-end Repairs ML20206F0681986-06-13013 June 1986 Safety Evaluation Supporting 850514,0710,860327,0411 & 0513 Requests for Approval to Use Pvrc Damping Values (ASME Code Case N-411) for Piping Sys Reanalysis ML20202J4211986-03-31031 March 1986 Safety Evaluation Accepting Util Design Mods & Tech Spec Changes Re Degraded Grid Voltage Protection for Class 1E Sys.Lll Technical Evaluation Rept Encl ML20155B8351986-03-31031 March 1986 Safety Evaluation Supporting Revised Procedure OP-3140, Providing Technically Acceptable Actions During Degraded Grid Voltage Conditions W/O LOCA to Assure Protection of Class 1E Electrical Sys & Equipment ML20140H9881986-03-25025 March 1986 Safety Evaluation Re Util 851008 Request to Install Carpet Over Vinyl Asbestos Tiled Control Room Floor Covering. Installation of Carpet Will Not Decrease Level of Fire Safety in Control Room & Deviation Acceptable ML20138E4201985-12-0202 December 1985 Safety Evaluation Supporting Util 831107 & 840320 Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 Re post-maint Testing & Reactor Trip Sys Reliability ML20136F1241985-11-18018 November 1985 Safety Evaluation Re IE Bulletin 80-11, Masonry Wall Design. Issues Re Arching Action Theory Resolved ML20137S7331985-09-27027 September 1985 Safety Evaluation Approving Use of Fuel Thermal Performance Code,Frosstey,For Analysis of LOCA Conditions at Low & Moderate Burnups ML20135C8921985-09-10010 September 1985 Safety Evaluation Supporting 840824 Commitment to Convert Air Containment Atmosphere Dilution Sys to Nitrogen Sys,In Response to Generic Ltr 84-09 ML20135C9121985-09-10010 September 1985 Safety Evaluation Supporting Conclusion That Diversification of Scram Discharge Vol Level Instrumentation Not Necessary & Tech Specs,As Modified in Amend 76,resolve Staff Concerns Re Need for Instrumentation Diversity ML20134K7351985-08-19019 August 1985 Safety Evaluation Accepting 831107 Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing ML20136G3611985-08-12012 August 1985 Safety Evaluation Accepting Seismic Design Criteria Utilized for Evaluation of Modified Recirculation Sys ML20132D8971985-07-22022 July 1985 Safety Evaluation Supporting Use of Pvrc Damping Values (ASME Code Case N-411) for Response Spectrum Seismic Piping Analyses ML20127D8991985-05-0606 May 1985 Safety Evaluation Re 840925 & 1002 Responses to Generic Ltr 83-28,Item 1.1 Concerning post-trip Review Program & Procedures.Program & Procedures Acceptable 1999-09-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
. - - -. . . - .-
car
'4 UNITED STATES
- 1 l
g j
t NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3066He01 4
9 . . . . . ,d SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION HELATING TO REPORT YAEC-1339 APPLICATION OF FIBWR2 CORE HYDRAULICS CODE TO BWR RELOAD ANALYSIS l VERMONT YANKEE NUCLEAR POWER CORPORATION VERMONT YANKEE NUCLEAR POWER STATION POCKET NO. 50-271
1.0 INTRODUCTION
By letter dated April 14,1997, Vermont Yankee Nuclear Power Corporation, licensee for l Vermont Yankee Nuclear Power Station (VYNPS), requested that the staff review and approve i the use of their FIBWR2 computer code for transient critical power ratio (CPR) analysis (Reference 1). The licensee responded to a staff request for additional information on September 23,1997, (Reference 2). The method will be applied to VYNPS by including it as a
- reference in Section 6 cf the Vermont Yankee technical specifications (TS) (References 3 and
! 4). FIBWR2 is an extension of the approved FIBWR code and contains the following new features:
- a. transient capability
- b. non-equilibrium fluid model by using two continuity equations and forcing the vapor phase to saturation at the system pressure
- c. the ability to model modern fuel designs
- d. improved coding allowing for user defined CPR correlations and more efficient execution 2.0 DISCUSSION OF NEW CODE FEATURES I FIBWR2 uses four field equations as the basis of an inhomogeneous, non-eouilibrium fluid l
dynamics model. This approach is well established and has been used for many years. This i
model allows for accurate representation of sub-cooled boiling phenomena and predictions of phasic velocities to accuracies dictated by the accuracy inherent in the semi-empirical void-quality-slip relationships. These equations are integrated using an explicit first-order method which is widely used in two-phase codes and is also well established. FIBWR2 retains all of the features of the previously approved FIBWR code and will be used as a functional replacement for FIBWR. The solution methodology assumes the following:
Enclosure 9901260489 990120 PDR ADOCK 05000271 P PDR
l I
l ,
1 2
i
- a. all channels experience the same overall pressure drop;
- b. the flow is one-dimensional, but not restricted to co-current upflow;
- c. an average pressure is used to evaluate density; and
- d. the steady state void and pressure drop relationships are valid during transient simulations.
In addition to the additional physics available in FIBWR2, the code's modeling capabilities were i extended. FIBWR2 allows modem fuel features such as part length rods and internal water l channels to be modeled. Also, FIBWR2 can accommodate a large number of parallel fuel channels including active channel, water tube and bypass flow paths.
3.0 FIBWR2 VALIDATION FIBWR2 was compared to both analytical results and experimental data. Void profile, flow decay transients, and osciliatory transient results were used as analytical benchmarks.
Experimental benchmarks consisted of comparisons to critical heat flux data from the 16 rod electrically heated test section identified as 16R-2 (References 5,6,7). FIBWR2 compared well to the analytical benchmarks. The void profile and decay transient results justify use of the void-quality-slip models in FIBWR2 and the flow model for non-oscillatory transients. The FIBWP2 calculated oscillatory transient results, although reasonably accurate, exhibited a reduction in amplitude and a phase shift which are typical characteristics of solver's with first order accuracy such as Euler's method (the solver in FIBWR2). The oscillatory results show typical agreement, but are insufficient to qualify the code for oscillatory transients.
The experimental benchmarks serve as integral benchmarks for the applications of FIBWR2 which are considered in this review. The 16 rod data was taken in test assemblies with pin designs typical of BWR fuel. Comparisons were made to 50 steady state tests with a mean of 1.007 and a standard deviation of U.0186. The approved RETRAN and TCPYA01 method when applied to the same test set leads to a mean of 1.006 and a standard deviation of 0.0182.
Comparisons were made to 20 transient tests to evaluate the ability of FIBWR2 to predict the onset of boiling transition. The root mean squared differences between the test results and FIBWR2 calculations was 0.458 seconds which is comparable to the results using the currently approved RETRAN and TCPYA01 method. A sensitivity study on the effect of void model, time step size and nodalization leads to the following conclusions:
a, there is a negligible effect on the calculated time of boiling transition; and
- b. the time step and nodalization proposed in Reference 1 are adequate for BWR problems.
As discussed in reference 1, a noding study may need to be perfonned to ensure convergence.
l
]
3 ,
4.0 FIBWR2 HOT CHANNEL METHODOLOGY ,
The proposed FIBWR2 methodology is evaluated by comparing results using the new code to results from the previously approved RETRAN and TCPYA01 methodology (Reference 8). The licensee proposes to replace RETRAN and TCPYA01 with FIBWR2, but the application methodology used for RETRAN and TCPYA01 remains unchanged from Reference 8.
Comparisons for the Vermont Yankee Nuclear Power Station were made for the following l events:
- a. generator load rejection without bypass;
- b. inadvertent high pressure coolant injection;
- c. loss of stator cooling; and l
- d. loss of feedwater heating. l l Some differences are expected due to the different models used in the two methods. The l FIBWR2 results consistently underpredict the RETRAN calculated critical power ratio (CPR) with the maximum difference being 0.059. The FIBWR2 predicted CPR values for the l l decreased subcooling events are more consistent with the RETRAN results with the largest
- difference being -0.007. The differences in the CPR values for the pressurization transients can be attributed to the improved void fraction predictive capability in FIBWR2 and the staff l considers the predicted differences to be acceptable. '
l i
5.0 CONCLUSION
S I-The staff has considered a request from the license to use the FISWR2 codes in its approved BWR hot channel methodology (Reference 8). The benchmarking and hot channel comparative results presented in Reference 1 are sufficient to qualify the code for CPR analyses. Therefore, the staff concludes that the request to use YAEC-1339, " Yankee Atomic Electric Company Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis," at
! Vermont Yankee is acceptable. A TS amendment is necessary prior to using this methodology.
An amendment is being prepared separately to incorporate the use of this approved Vermont Yankee methodology in the TS.
Principal Contributor: A. Ulses Date: January 20, 1999 i
i.
i l'
1
+ - --
r - _ -- . __m-
a .
1 4
6.0 REFERENCES
- 1. Letter from James F. Duffy (Vermont Yankee) to USNRC, ' Submittal of YAEC-1339,*
April 14,1997.
- 2. Letter from James F. Duffy (Vermont Yankee) to USNRC, " Response to NRC request for additional information regarding YAEC-1339," September 23,1997.
- 3. Letter from Donald A. Reid (Vermont Yankee) to USNRC, " Technical Specification Proposed Change No.192," August 20,1997.
- 4. Letter from Bernard R. Buteau (Vermont Yankee) to USNRC, " Marked up Technical Spacification pages for Proposed Changes 192 and 193," September 18,1997.
- 5. GEAP-1022-11,
- Deficient Cooling,11th Quarterly Progress Report, January 1 -
March 31,1972," General Electric Co., April 1972.
- 6. GEAP-1022-12, " Deficient Cooling,12th Quarterly Progress Report, April 1 -
June 30,1972," General Electric Co., July 1972.
- 7. GEAP-13295, " Transient Critical Heat Flux - Experimental Results," General Electric Co.,
September 1972.
- 8. YAEC 1299P," Methods for the Analysis of Boiling Water Reactors Transient Critical Power Ratio Analysis RETRAN-TCPYA01," Yankee Atomic Electric Company, March 30,1982.
r .. - - . - .
. . _ _ _ _ _ _ _ _ _ _