|
---|
Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20247C9581989-05-10010 May 1989 Notice of Violation from Insp on 890313-14 & 28-30. Violations Noted:Failure to Perform Insps During Dec 1988 & Jan 1989 or Fire & Rescue Team Training During Oct 1988 - Mar 1989 ML20154R7231988-09-22022 September 1988 Notice of Violation from Insp on 880912-14.Violations Noted: Individual Listed on Authorized Users List Had Not Received Passing Grade on Written Exam Administered on 880426 ML20150C7611988-06-23023 June 1988 Notice of Violation from Insp on 880523-25.Violation Noted: Failure to Provide Indoctrination as Well as Annual Retraining for Members of Emergency Control Organization ML20210D8141987-01-21021 January 1987 Notice of Violation from Insp on 861215-19 ML20198E7211985-11-0404 November 1985 Notice of Violation from Insp on 851007-11 ML20133P7871985-07-29029 July 1985 Notice of Violation from Insp on 850610-14 ML20133D5001985-05-13013 May 1985 Notice of Violation from Insp on 850415-19 ML20204C7421978-10-27027 October 1978 Notice of Violation from Insp on 780911-15 1989-05-10
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20058J8911993-11-19019 November 1993 Insp Rept 70-0824/93-05 on 931018-22.Weakness Noted.Major Areas Inspected:Emergency Preparedness,Including Coordination of Emergency Planning W/Offsite Support Agencies ML20059A1251993-10-14014 October 1993 Insp Rept 70-0824/93-04 on 930913-17.No Violations Noted. Major Areas Inspected:Ncs & FP ML20056F4921993-08-0909 August 1993 Insp Rept 70-0824/93-02 on 930719-22.Violations Noted. Major Areas Inspected:Exam of Organization,Mgt Controls, Audits,Appraisals,Training,External & Internal Exposure Controls ML20125E4161992-11-27027 November 1992 Insp Rept 70-0824/92-06 on 921027-30.Violations Noted But Not Cited.Major Areas Inspected:Emergency Preparedness, Including Coordination of Emergency Planning W/Offsite Support Agencies & Emergency Facilities & Equipment ML20217B5691991-02-25025 February 1991 Insp Rept 70-0824/91-01 on 910122-25.No Violations Noted. Major Areas Inspected:Evaluation of Licensee Remedial Drill ML20062G3371990-11-19019 November 1990 Insp Rept 70-0824/90-04 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected:Training,Nuclear Criticality Safety,Operations,Maintenance & Followup on Inspector Followup Item ML20062D3461990-10-26026 October 1990 Insp Rept 70-0824/90-02 on 900917-21.Violation Noted But Not Cited.Major Areas Inspected:Emergency Preparedness, Observation & Evaluation of Emergency Drill,Maint of Select Emergency & Fire Protection Equipment & Drills ML20058G1191990-10-25025 October 1990 Insp Rept 70-0824/90-03 on 900919-21.No Violations or Deviations Noted.Major Areas Inspected:Radiological Liquid & Gaseous Effluents,Radiological Environ Monitoring, Instrumentation & Audits ML20247L5301989-09-13013 September 1989 Insp Rept 70-0824/89-05 on 890816.No Violations or Deviations Noted.Major Areas Inspected:Physical Inventory & Records & Repts Used to Account for SNM within Licensed Facility.Details Withheld (Ref 10CFR2.790) ML20247C9581989-05-10010 May 1989 Notice of Violation from Insp on 890313-14 & 28-30. Violations Noted:Failure to Perform Insps During Dec 1988 & Jan 1989 or Fire & Rescue Team Training During Oct 1988 - Mar 1989 ML20247D1791989-05-0505 May 1989 Insp Rept 70-0824/89-03 on 890410-12.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Effluent Radiological Environ Monitoring & QC ML20247C9881989-05-0404 May 1989 Insp Rept 70-0824/89-02 on 890313-14 & 28-30.Violations Noted.Major Areas Inspected:Emergency Preparedness Program, Including State of Operational Readiness,Training,Periodic Drills & Exercises & Maint of Equipment & Supplies ML20154R7381988-09-22022 September 1988 Insp Rept 70-0824/88-08 on 880912-14.Violations Noted.Major Areas Inspected:Mgt Controls,Training,Nuclear Criticality Safety,Operations Review & Maint ML20154R7231988-09-22022 September 1988 Notice of Violation from Insp on 880912-14.Violations Noted: Individual Listed on Authorized Users List Had Not Received Passing Grade on Written Exam Administered on 880426 ML20151K9641988-07-22022 July 1988 Insp Rept 70-0824/88-06 on 880613-16.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Instruments & Equipment,Staffing,External Exposures,Internal Exposures,Surveys,Radwaste Mgt & Transportation ML20153B5541988-06-30030 June 1988 Insp Rept 70-0824/88-03 on 880516-18.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluents,Radiological Environ Monitoring & Confirmatory Measurements ML20150C7611988-06-23023 June 1988 Notice of Violation from Insp on 880523-25.Violation Noted: Failure to Provide Indoctrination as Well as Annual Retraining for Members of Emergency Control Organization ML20150C7651988-06-22022 June 1988 Insp Rept 70-0824/88-04 on 880523-25.Violations Noted.Major Areas Inspected:Review & Evaluation of Licensee Emergency Preparedness Program ML20148F6761988-03-0707 March 1988 Insp Rept 70-0824/88-01 on 880203-05.No Violations & Deviations Noted.Major Areas Inspected:Areas of Radiation Protection,Solid Waste Mgt,Transportation of Radioactive Matls,Followup on Previous Enforcement Issues ML20150B1111988-03-0202 March 1988 Insp Rept 70-0824/88-02 on 880208-10.No Violations or Deviations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Waste Mgt & Environ Monitoring ML20236S9761987-11-19019 November 1987 Insp Rept 70-0824/87-04 on 871029-30.No Violations or Deviations Noted.Major Areas Inspected:Review & Evaluation of Licensee Emergency Preparedness Program ML20238F6681987-09-0404 September 1987 Insp Rept 70-0824/87-02 on 870817-19 & 21.No Violations or Deviations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Waste Mgt,Environ Monitoring & Confirmatory Measurements ML20236C5051987-07-22022 July 1987 Notice of Deviation from Insp on 870629-0701.Deviation Noted:One Completion Date Not Met in That While Phase 1 Completed in Timely Manner,As of 870701,Phase 2 Not Completed ML20236C5181987-07-15015 July 1987 Insp Rept 70-0824/87-01 on 870629-0701.Deviation Noted.Major Areas Inspected:Radiation Protection,Solid Waste Mgt,Solid Waste,Transportation of Radioactive Matls & Followup on Previous Enforcement Issues ML20210D8141987-01-21021 January 1987 Notice of Violation from Insp on 861215-19 ML20210D8281987-01-0606 January 1987 Insp Rept 70-0824/86-06 on 861215-19.Violations Noted: Failure to Implement Respiratory Protection Requirements W/ Two Examples,To Follow Up on Plutonium Urinalysis Result & to Provide Required Info to Mgt from Monthly Audits ML20209C3361986-08-19019 August 1986 Insp Rept 70-0824/86-04 on 860804-08.No Violations or Deviations Noted.Major Areas Inspected:Onsite Review of Radwaste Mgt & Environ Protection ML20205A2481986-08-0505 August 1986 Partially Withheld Insp Rept 70-0824/86-05 on 860722-25 (Ref 10CFR73.21 & 2.790).No Violations or Deviations Noted. Major Areas Inspected:Physical Inventory & Matl Control & Accounting ML20205B1531986-08-0505 August 1986 Insp Rept 70-0824/86-03 on 860721-25.No Violations or Deviations Noted.Major Areas Inspected:Actions Taken to Complete Requirements of 841221 Confirmatory Action Ltr CAL-824/84-01 & Insp of Radiation Protection & Radwaste Mgt ML20206R5161986-06-26026 June 1986 Partially Withheld Insp Rept 70-0824/86-02 on 860603 (Ref 10CFR2.790 & 73.21).No Noncompliance Noted.Major Areas Inspected:General Requirements for Physical Protection of SNM Onsite ML20154C8341986-01-29029 January 1986 Insp Rept 70-0824/85-08 on 851009-11 & 1118-21.No Violations or Deviations Noted.Major Areas Inspected:Closeout Insp & Confirmatory Survey of Decommissioning of Bldg C,Phase I PNO-II-85-104, on 851105,operations at Sites Shut Down Due to Flooding of Equalization Ponds,Containing Radioactive Matl Concentrations.Security Surveillance Doubled.Controls Initiated to Assure Process Liquid Waste Not Released1985-11-0505 November 1985 PNO-II-85-104:on 851105,operations at Sites Shut Down Due to Flooding of Equalization Ponds,Containing Radioactive Matl Concentrations.Security Surveillance Doubled.Controls Initiated to Assure Process Liquid Waste Not Released ML20198E7211985-11-0404 November 1985 Notice of Violation from Insp on 851007-11 ML20198E7361985-10-28028 October 1985 Insp Rept 70-0824/85-07 on 851007-11.Violations Noted: Failure to Control Access to High Radiation,To Calibr Breathing Air Supply Pressure Gauges & to Perform Beta Radiation Surveys During Personnel Entries Into Hot Cell ML20133P2701985-07-30030 July 1985 Insp Rept 70-0824/85-06 on 850705-16.No Violations or Deviations Noted.Major Areas Inspected:Mgt Organization & Controls,Nuclear Criticality Safety,Procedures,Operations Reviews & Audits ML20133P7871985-07-29029 July 1985 Notice of Violation from Insp on 850610-14 ML20133P8111985-07-18018 July 1985 Insp Repts 50-013/85-01 & 70-0824/85-05 on 850610-14. Violation Noted:Failure to Package Low Specific Activity Radioactive Matl in Strong Tight Package & Failure to Label Packages of Radioactive Matl Per Burial Facility License ML20132E6961985-07-0303 July 1985 Insp Rept 70-0824/85-04 on 850610-14.No Violations or Deviations Identified.Major Areas Inspected:Radwaste Mgt, Environ Protection & Independent Measurements ML20128L3191985-06-18018 June 1985 Insp Rept 70-0824/85-03 on 850603-04.No Noncompliance Noted. Major Areas Inspected:Emergency Preparedness ML20133D5001985-05-13013 May 1985 Notice of Violation from Insp on 850415-19 ML20133D5671985-05-0707 May 1985 Insp Rept 70-0824/85-01 on 850415-19.Violation Noted:Failure to Properly Post Radiation Area ML20058G4721982-07-13013 July 1982 IE Insp Rept 70-0824/82-04 on 820614-16.No Noncompliance Noted.Major Areas inspected:10CFR21 Implementation, Organization,Safety Committees,Internal Review & Audit, Facility Changes & Mods & Nuclear Criticality Safety ML20204D0951978-11-0101 November 1978 IE Insp Rept 70-824/78-09 on 780918-22.No Noncompliance Noted.Major Areas Inspected:Records & Repts of Radioactive Effluents & Liquid & Airborne Effluent Monitoring Instruments ML20204C7421978-10-27027 October 1978 Notice of Violation from Insp on 780911-15 ML20197B1031978-09-13013 September 1978 Insp Rept 70-0824/78-08 on 780807-10.No Noncompliance Noted.Major Areas Inspected:Operations,Safety Committees, Training & Procedural Controls ML20147J1021977-12-29029 December 1977 IE Inspec Rept 70-824/77-10 on 771215 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included: Storage & Internal Control & Records & Reports ML20236X0581975-11-28028 November 1975 PN-75-139:employee Contracts at Apollo & Leechburg Facility Expire on 751130.Licensee Mgt Believes That There Significant Probability of Employee Strike.Media Interest Expected.Press Release Not Planned 1993-08-09
[Table view] |
Text
. .
ENCLOSURE 1 NOTICE OF VIOLATION Babcock and Wilcox Company Docket No.70-824 NNFD Research Laboratory License No. SNM-778 Lynchburg, VA During the Nuclear Regulatory Comission' (NRC) inspection conducted on
.May 23-25, 1988, violations of NRC requirements were identified. The violations involved: (1) Failure to provide the opportunity for local emergency assistance personnel to annually tour the facility; (2) Failure to perform periodic meteorological instrument calibration as required by procedure (RL-IP-1713-01 ; (3) Failure to perform a test of the communicaticas lids and notification procedures for early warning of the put,?ic between f N. ,ite and State and local emergency units during the annual dr,'1; eM (4 : Failure to provide annual retraining for members o_f the Emergency Control hrganization.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violations are listed below:
A. Condition 9 of Special Nuclear Materials License No. SNM-778 requires that licensed material be used in accordance with statements, representations, and conditions contained in Chapter. I thru 8 of the license application dated November 26, 1985, and supplements dated May 27, and June 19, 1986 and January 20, April 27, May 26, August -10, and September 1,1987.
Chapter 8, "Radiological Contingency Plan," of the application require that the licensee shall maintain a capability for handling emergencies in accordance with the Radiological Contingency Plan. Section 7.2, "Training of the Radiological Contingency Plan," states that members of the Emergency Control Organization will be retrained annually. In addition, training in emergency response begins with the indoctrination of each new employee in his assigned responsibility in time of emergency.
Contrary to the above, the licensee failed to provide indoctrination as well as anr.ual retraining for members of the Emergency Control Organization. Two of three Emergency Officers have received no indoctrination training in their assigned responsibility. The receptionist and alternate, who perform notification at the direction of the Emergency Officer, have not received indoctrination as well as annual retraining for their assigned responsibilities.
This is a Severity Level IV violation (Supplement VIII).
B. Condition 9 of Special Nuclear Materials License No. SNM-778 requires that 1 licensed material be used in accordance with statements, representations !
and conditions contained in Chapters 1 thru 8 of the license application
, n:mt mm ,
/y 8807120618 880623 N l gjDR ADOCK 07000824 %
)W%
1
,.2LA -.
" Docket No.70-824 Babcock and Wilcox Company License No. SNM-778
.NNFO Research Laboratory 2 dated November 26, 1985, and supplements dated May 27, and June 19, 1986 and January 20, April 27, May 26, August 10, and September 1, 1987.
Chapter 8 "Radiological Contingency Plan," of the application requires .
i that the licensee shall maintain a capability for handlingSectionemergencies 7.2, in accordance with the Radiological Contingency Plan.
"Training, of the Radiological Contingency Plan," states that the annua:
drill shall include as a minimum a test of the communication links and notification procedures for early warning of the public between the Siti and State and local emergency units.
Contrary to the above, the licensee has not tested the communication links and notification procedures for early warning of the public between the Site and State and local emergency units during the annual drill.
This is a Severity Level IV violation (Supplement VIII).
C. Condition 9 of Special Nuclear Materials License No. SNM-778 requires that licensed material be used in accordance with statements, representations, and conditions contained in Chapter 1 thru 8 of the license application dated November 26, 1985, and supplements dated May 27, and June 19,,1986 and January 20, A'pril 27, May 26, August 10, and September 1,1987.
Chapter 8, "Radiological Contingency Plan," of the application requires that the licensee shall maintain a capability for handling emergercies in accordance with the Radiological Contingency Plan. Procedtre RL-IP-1713-01, "Measuring Equipment Control and Calibration System,"
defines an administrative system to control the calibration of all measurement stcndards and measuring and test equipment used at the site in ,
order to assure that measurements made are qualifiable and reproducible. l The procedure requires that the meteorological instruments be caliarated '
on a 6 month frequency.
Contrary to the above, the licensee has not pei formed periodic meteorological instrument calibration at a 6 month frequency in that -the temperature recorder was last calibrated in May 1987.
This is a Severity Level IV violation (Supplement Vill).
D. Condition 9 of Special Nuclear Materials License No. SNM-778 requires that licensed material be used in accordance with statements, representations and conditions contained in Chapters 1 thru 8 of the license application d6ted November 26, 1985, and supplements datrd May 27, and June 19, 1986 and January 20, April 27, May 26, August 10, and September 1, 1987.
Chapter 8, "Radiological Contingency Plan," of the application requires that the licensee will maintain a capability for handling emergencies in accordance with the Radiological Contingency Plan.
Section 7.2, "Training of the Radiological Contingency Plan," states that a tour of the facility for local emergency assistance personnel will be conducted annually.
Babcock and Wilcox Company Docket No.70-824 NNFO Research Laboratory 3 License No. SNM-778 Contrary to the above the licensee has not provided' the opportunity for-local emergency assistance personnel to annually tour the facility, in that the 'last tour 'of the f acility for local emergency assistance personnel occurred in December 1986.
This is a Severity Level V violation (Supplement VIII).
Pursuant to the provisions of 10 CFR 2.201, Babcock and Wilcox Company is hereby required to submit 'a written statement or explanation to the Nuclear Regulatcry Commission, ATTN: Document Control Desk, Washington, DC 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident inspector, Naval Nuclear Feel Division, within 30 days of the date of the letter transmitting this Notice. This reply should be clearly marked .as a "Reply to a Notice of Violation" and should include [for each violation): (1) admission or denial of the violation, (2) the reason for the violaticn if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be _taken to avoid further violations, and (5) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.' If an adequate reply is not received within the time specified.in this Notice, an order may be issued to' show cause why the license should not be modified, '
suspended, or revoked or why such other action as may be proper should not be taken.
Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10.CFR 2.790(d) or 10 CFR 73.21. <
FOR THE NUCLEAR REGULATORY COMMISSION 1
J ilip 5 ehr,' Director i ision o Radiation Safety l and Safeguards ;
l DatedatAtlanta[,
this ScJ day of 11Georgia 6 1988 '
l l
l l
i
_ - _ . _ _ _ _ _ _ _ _ _ . _ _