ML20153D249

From kanterella
Revision as of 03:56, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Facility Operating License R-130,authorizing Licensee to Operate Training Reactor & Isotopes Production, Ga (Triga) Reactor of Dept of Air Force,At Power Levels Up to 2300 Kws Thermal & in Pulse Mode
ML20153D249
Person / Time
Site: University of California-Davis
Issue date: 08/13/1998
From: Eresian W
NRC (Affiliation Not Assigned)
To: Tattini E
AIR FORCE, DEPT. OF
Shared Package
ML20153D253 List:
References
NUDOCS 9809250003
Download: ML20153D249 (3)


Text

.

q M i:r G: nerd Eug:n) L. Tattini, Commandar August 13, 1998 acr:ments Air Legistics C;nt::r sM-ALC/TI 1 5335 Price Avenue McClellan AFB, California 95652-2504

SUBJECT:

ISSUANCE OF FACILITY OPERATING LICENSE

Dear General Tattini:

I The Commission has issued the enclosed Facility Operating License No. R-130. The license I authorizes you to operate the training reactor and isotopes production, General Atomics (TRIGA) reactor of the Department of the Air Force at McClellan Air Force Base at power levels up to 2300 kilowatts thermal and in the pulse mode, with reactivity insertions not to exceed $1.75 (1.23% Ak/k), at the McClellan Nuclear Rediation Center in accordance with your application of October 23,1996, and supplements thereto. The term of the license is i twenty (20) years from the date of issuance.

I' Enclosed with the facility operating licanse is a copy of the Safety Evaluation Report (NUREG 1630) and the Notice of Issuance of License that is being sent to the Office of the )

Federal Register for publication.

l Sincerely, ORIGINAL SIGNED BY:

Warren J. Eresian, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management l Office of Nuclear Reactor Regulation Docket No. 50-607 )

l

Enclosures:

i

1. Facility Operating License No. R-130 l
2. Safety Evaluation Reoort . - I 3
3. Notice of issuanc e {u iI- L  !

l nE 9

!I cc w/ enclosures:

u See next page I N, , ~l 1 g

=

~

h DISTRIBUTION: NBC ME CENTEB COPY  ;

e4 E-Mall HARD COPY TBurdick WEresian Doci'et File 50-607 JRoe OC/LFARB  !

E TMichaels PUBLIC SWeiss PDNO r/f Additurst Lawyer

" Pisaac EHylton GHill (2) OGC WBeckner AAdams Region IV PGEB MMendonca SCollins/FMiraglia DHagan RZimmerm

  • See previous c PDND:RE P A rrence Q I:D PGEBq TECH ED* PM(A)D R:

Eresian E on eiss TEssig BCalure ehD Co. ins y h)k 7/td98 7/$/98 OFFICIAL RECORD COPY 7// 8 7/30/98 3/1498 7/14/98 /$g /98 }/\$ /98 DOCUMENT NAME: G:\SECY\ERESIAN\ LICENSE.MCL OGC 002456

)

l McClellan AF3 TRIGA REACTOR Docket No. 50-607 cc: l Dr. Wade J. Richards SM-ALC/TI-1 5335 Price Avenue, Bldg. 258 McClellan AFB, California 95652-2504' )

1 Col. Robert Capell HQ AFMC/SGC 4225 Logistics Avenue, Suite 23

. Wright-Patterson AFB, Ohio 45433-5762 Lt. Col. Catherine Zeringue HQ AFSC/ SEW-9570 Avenue G, Bldg. 24499 Kirtland AFB, New Mexico 87117-5670 1

Test, Research and Training i Reactor Newsletter 202 Nuclear Sciences Center University of Florida ,

Gainesville, Florida 32611 '

i

[&puengA>\

UNITED STATES g g NUCLEAR REGULATORY COMMISSION

, # WASHINGTON. D.C. 20665 4 001 8 August 13, 1998

% ,. . . . . ,o Major General Eugene L. Tattini, Commander Sacramento Air Logistics Center SM-ALC/TI 1 5335 Price Avenue McClellan AFB, California 95652-2504

SUBJECT:

ISSUANCE OF FACILITY OPERATING LICENSE

Dear General Tattini:

The Commission has issued the enclosed Facility Operating License No. R-130. The license authonzes you to operate the training reactor and isotopes production, General Atomics

- (TRIGA) reactor of the Department of the Air Force at McClellan Air Force Base at power levels up to 2300 kilowatts thermal and in the pulse mode, with reactivity insertions not to exceed $1.75 (1.23% Ak/k), at the McClellan Nuclear Radiation Center in accordance with your application of October 23,1996, and supplements thereto. The term of the license is twenty (20) years from the date of issuance.

Enclosed with the facility operating license is a corv of the Safety Evaluation Report (NUREG-1630) and the Notice of Issuance of License that is being sent to the Office of the Federal Register for publication.

Sincerely, 0%q Warren J. Ere ian, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-607

Enclosures:

1. Facility Operating License No. R-130
2. Safety Evaluation Report
3. Notice of issuance cc w/ enclosures:

See next page