ML110280491

From kanterella
Revision as of 10:22, 17 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Comanche Peak, Units 1 & 2 - Notification of NRC Initial Operator Licensing Examination 05000445-11-301; 05000446-11-301
ML110280491
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/28/2011
From: Haire M S
Operations Branch IV
To: Flores R
Luminant Generation Co
References
IR-11-301
Download: ML110280491 (5)


See also: IR 05000445/2011301

Text

January 28, 2011

Rafael Flores, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000445/2011301; 05000446/2011301

Dear Mr. Flores:

In a telephone conversation on January 26, 2011, between Messrs. Garry Struble, Operations Training Supervisor, and Brian Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Comanche Peak during the week of June 6, 2011.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by March 18, 2011. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by April 18, 2011. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of May 9, 2011. Mr. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402 and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Mr. Thank you for your cooperation in this matter. Mr. Potter has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-860-8172, or myself at 817-860-

8159.

Sincerely,/RA/ Mark Haire, Chief Operations Branch Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 cc: Mr. Fred W. Madden, Director Oversight and Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq. Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851 Glen Rose, TX 76043 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health P.O. Box 149347, Mail Code 2835 Austin, TX 78714-9347 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Mr. Honorable Walter Maynard County Judge P.O. Box 851 Glen Rose, TX 76043 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Anthony Jones Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711 Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209 Mr. Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Vacant) Senior Resident Inspector (John.Kramer@nrc.gov) Resident Inspector (Brian.Tindell@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker.nrc.gov) Branch Chief, DRS/OB (Mark.Haire@nrc.gov) Senior Project Engineer, DRP/A (David.Proulx@nrc.gov) Project Engineer, DRP/A (Nicholas.Hernandez@nrc.gov) Project Engineer, DRP/A (Laura.Micewski@nrc.gov) CP Administrative Assistant (Sue.Sanner@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Balwant.Singal@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource OEDO RIV Coordinator (James.Trapp@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials BTL Publicly Avail Yes No Sensitive Yes No Sens. Type Initials BTL SOE:OB C:OB . BTLarson MHaire /RA/ /RA/ 1/26/2011 1/28/2011 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax