ML20129K374

From kanterella
Revision as of 06:48, 25 August 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Four Memos of Understanding for Observers of NRC Oversight of Nneco Conduct of ICAVP at Millstone Unit 3
ML20129K374
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/14/1996
From: Rooney V
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9611220131
Download: ML20129K374 (10)


Text

.__ - . _ _ ._ _. _ _ _ _ _ . _ . . . . . _ . __

. 7 .; .; .

3, , i .s

. 1 .2 November 14, 1996'

, i s t ,

1 .,. .  ;

  • b j v4 {

I MEMORANDUM T0: File l FROM: Vernon L. Rooney, Senior Project Manager: Original signed by:

Special Projects Office - Licensing i

Office of Nuclear Reactor Regulation l

SUBJECT:

MEMORANDUMS OF UNDERSTANDING (MOV) FOR ICAVP OBSERVERS Attached are four MOUs for the observers of NRC's oversight of.NNECO's conduct of the ICAVP at Millstone Unit 3.

Docket No. 50-423 Attachments: As stated  !

l l

cc w/att: E. Imbro l l

i i

l DISTRIBUTION: - >

l 'DocketqF11e]

i PUBLIC ,

I SP0 Reading VRooney , ,

PMcKee i WTravers LBerry ,

/

?A.

l DOCUMENT NAME: G:\ROONEY\lCAVP.MOV I

e r; ({

T i

< , n t

. ws m. i. ih. 6.c c . co,w without .it.chnh.ncio.or.

n .i. . . , .e m. m . c ,y nw .ei. chm.nt/.nclo.ur. "N* = No copy 0FFICE SP0-Lf PtGL 4 SPO-L:LA l i kkj SPdA:V)D l l~ l. l

[-

NAME VRooney\ ' LBerry \' R ~ PMche\ '

DATE ll/W/96 11/lW96 11/ b /96 A 0FFICIAL RECORD COPY

?

9611220131 961114 9

! PDR ADOCK 05000423 "h hh.b N l P PDR 220006

pmnq g i UNITED STATES j

NUCLEAR REGULATORY COMMISSION g

t WASHINGTON. D.C. 2066H001

\, .,,../ November 14, 1996 l

MEMORANDUM T0: File FROM: Vernon L. Rooney, Senior Project Manager Special Projects Offi.e - Licensing Office of Nuclear Reactor Regulation l

SUBJECT:

MEMORANDUMS OF UNDERSTANDING (MOU) FOR ICAVP OBSERVERS l

Attached are four MOUs for the observers of NRC's oversight of NNEC0's l conduct of the ICAVP at Millstone Unit 3.

Docket No. 50-423 Attachments: As stated l cc w/att: E. Imbro l

l l

i i

1 l

l l

l

(

MEMORANDt'M 0F UNDERSTANDING As part of my participation as an observer of the NRC's oversight of Northeast Nuclear Energy Company's (NNECOs) conduct of the Independent Corrective Action i

Verification Program (ICAVP) at Millstone Unit 3, I agree to the following protocols:

l I will make advance arrangements with the licensee for site access training and badging (subject to fitness-for-duty requirements), prior to the actual on-site period.

My communication with the licensee will be 'through the NRC team' manager, Eugene V. Imbro or team leader, Loren Plisco.

When informed of'an unannounced assessment activity, I will not release information concerning its time and purpose.

I will remain in the company of NRC personnel throughout the course of j the assessment.

I e I understand that my participation may be terminated by the NRC if my l conduct interferes with a fair and orderly inspection.

l I will not be provided with proprietary or safeguards information. I i will not remove any material from the site without NRC or licensee i approval.

I understand that, in accompanying NRC personnel, I do so at my own I risk. NRC will not be responsible for injuries or exposures to harmful substances which may occur during the assessment and will assume no liability for any incidents associated with my accompaniment.

I agree to adhere to the same standards of conduct as NRC personnel during this assessment. ,

If I become aware of any apparent non-conformance with safety or regulatory requirements during the assessment or have any comments on the conduct of the NRC oversight or the independence of the licensee's ICAVP effort, I will make those observations promptly known to the NRC -

team manager or team leader. Likewise, when my overall conclusions or i

views are substantially different from those of NRC team members, I will advise the ICAVP team manager and forward those views, in writing, to Mr. R. P. Zimmerman. This will allow NRC to take any necessary regulatory actions. .

Under no circumstances will Nuclear Energy Advisory Council communications regarding the results of these inspections be released to l the public or the licensee before they are reviewed by the NRC and the l

l I

i i

l l

  • ~ '

QCtEILtd ATE I

inspection report is issued. Nuclear Energy Advisory Council communications may be made publicly available, similar to NRC inspection ,

reports, after they have been transmitted to and reviewed by NRC. -,  !

1 l

Print Name:'h C MatVowse2 Signature: k C w d Date: AVRc

(\

w-I i

l l

?

l i

i l.

h n

l

MEMORANDUM OF UNDERSTANDING As part of my participation as on observer of the NRC's oversight of Northeast Nuclear Energy Company's (NNECOs) conduct of the Independent Corrective Action Verification Program (ICAVP) at Millstone Unit 3, I agree to the following protocols:

I will make advance arrangements with the licensee for site access training and badging (subject to fitness-for-duty requirements), prior to the actual on-site period.

My communication with the licensee will be through the NRC team manager, Eugene V. Imbro or team leader, Loren Plisco.

When informed of an unannounced assessment activity, I will not release information concerning its time and purpose.

I will remain in the company of NRC personnel throughout the course of the assessment.

I understand that my participation may be terminated by the NRC if my conduct interferes with a fair ar.d orderly inspection.

I will not be provided with proprietary or safeguards information. I will not remove any material from the site without NRC or licen.cte approval.

I understand that, in accompanying NRC personnel, I do so at my own risk. NRC will not be responsible for injuries or exposures to harmful substances which may occur during the assessment and will assume no liability for any incidents associated with my accompaniment.

I agree to adhere to the same standards of conduct as NRC personnel during this assessment.

If I become aware of any apparent non-conformance with safety or regulatory requirements during the assessment or have any comments on the conduct of the NRC oversight or the independence of the licensee's ICAVP effort, I will make those observations promptly known to the NRC team manager or team leader. Likewise, when my overall conclusions or views are substantially different from those of NRC team members, I will advise the ICAVP team manager and forward those views, in writing, to Mr. R. P. Zimmerman. This will allow NRC to take any necessary regulatory actions.

Under no circumstances will Nuclear Energy Advisory Council communications regarding the results of these inspections be released to the public or the licensee before they are reviewed by the NRC and the

-I-

inspection report is issued. Nuclear Energy Advisory Council communications may be made publicly available, similar to NRC inspection reports, after they have been transmitted to and reviewed by NRC.

Print Name: [(/LA.Y b Arc M dod Signature:

V boa >1C Date: 7- Ab'ib l

l l

I l

1 l

l l

l l

l l

l

r .

MEMORANDUM 0F UNDERSTANDING As part of my participation as an observer of the NRC's oversight of Northeast Nuclear Energy Company's (NNECOs) conduct of the Independent Corrective Action i

Verification Program (ICAVP) at Millstone Unit 3, I agree to the following l protocols:

i I will make advance arrangements with the licensee for site access training and badging (subject to fitness-for-duty requirements), prior to the actual on-site period.

My communication with the licensee will be through the NRC team manager,  !

Eugene V. Imbro or team leader, Loren Plisco. I l

l

  • When informed of an unannounced assessment activity, I will not release information concerning its time and purpose.

I will remain in the company of NRC personnel throughout the course of i the assessment.

I understand that my participation may be terminated by the NRC if my conduct interferes with a fair and orderly inspection.

I will not be provided with proprietary or safeguards information. I will not remove any material from the site without NRC or licensee approval.

I understand that, in accompanying NRC personnel, I do so at my o'wn risk. NRC will not be responsible for injuries or exposures to. harmful substances which may occur during the assessment and will assume no liability for any incidents associated with my accompaniment.

  • l I agree to adhere to the same standards of conduct as NRC personnel '

l during.this assessment.

l

  • If I become aware of any apparent non-conformance with safety or regulatory requirements during the assessment or have any comments on the conduct of the NRC oversight or the independence of the licensee's ICAVP effort, I will make those observations promptly known to the NRC -

team manager or team leader. Likewise, when my overall conclusions or views are substantially different from those of NRC team members, I will advise the ICAVP team manager and forward those views, in writing, to Mr. R. P. Zimmerman. This will allow NRC to take any necessary regulatory actions. ,

Under no circumstances will Nuclear Energy Advisory Council communications regarding the results of these inspections be released to the public or the licensee before they are reviewed by the NRC and the l

l l

i

_1 i

inspection report is. issued. Nuclear Energy Advisory Council communications may be made publicly available, similar to NRC inspection reprts, after they have been transmitted to and reviewed by NRC.

Print Nam 6: dVAF O*4 //Ns /7 Signature: [() h Date: [k l

i i

l l

l l

l i

1

P MEMORANDUM 0F UNDERSTANDING l

t As part of my participation as an observer of the NRC's oversight of Northeast Nuclear Energy Company's (NNECOs) conduct of the Independent Corrective Action Verification Program (ICAVP) at Millstone Unit 3, I agree to the following

. protocols:

I will make advance errangements with the licensee for site access -

training and badging (subj' e ct to fitness-for-duty requirements), prior to the actual on-site period. -

My communication with the licensee will be through the NRC team manager, Eugene V. Imbro or team leader, Loren Plisco.

When informed of an unannounced assessment activity, I will not release l information concerning its time and purpose.

I will remain in the company of NRC personnel throughout the course of the assessment.

I understand that my participation may be terminated by the NRC if my conduct interferes with a fair and orderly inspection.

I will not be.provided with proprietary or safeguards information. I will not remove any material from the site without NRC or licensee approval.

I understand that, in accompanying NRC personnel, I do so at my own l

. risk. NRC will not be responsible for injuries or exposures to harmful substances which may occur during the assessment and will assume no liability for any incidents associated with my accompaniment.

I agree to adhere to the same standards of conduct as NRC personnel i during this assessment.

If I become aware of any apparent non-conformance with safety or.

regulatory requirements during the assessment or have any comments on the conduct of the NRC oversight or the independence of the licensee's ICAVP effort, I will make those observations promptly known to the NRC -

team manager or team leader. Likewise, when my overall conclusions or i views are substantially different from those of NRC team members, I will advise the ICAVP team manager and forward those views, in writing, to Mr. R. P. Zimmerman. This will allow NRC to take any necessary i

regulatory actions. -

i Under no circumstances will Nuclear Energy Advisory Council communications regarding the results of these inspections be released to the public or the licensee before they are reviewed by the NRC and the f

l i

0-  :

AL7ewnc i

inspection report is issued. Nuclear Energy Advisory Council communications may be made publicly available, similar to NRC inspection reports, after they have been transmitted to and reviewed by NRC.

l Print Name: IO bn b . fle /4 Signature: d 4 . //t b g- -

Date: J'o6/ /9. / 90, ./

l l

l I

I 1

i l

l l .

l l ,-