Summary of 921022-23 Meeting W/Lipa Re Status of Plant Decommissioning Project
ML20125D099
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/01/1992
From: Fauver D
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Joseph Austin
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9212140272
Download: ML20125D099 (4)


Text

'

  • *- #g. n u o UNITED STATES

~,,

8' n NUCLEAR REGULATORY COMMISSION t W ASHING TON. D. C. 20555

%, . . . . . // DEC 011992 DOCKET NO. 50-322 MEMORANDUM FOR: John H. Austin, Branch Chief Decommissioning and Regulatory issues Branch Division of Low-Level Waste Management and Decommissioning Office of Nuclear Material Safety ,

and Safeguards FROM: David N. Fauver, Health Physicist facilities Section Decommissioning and Regulatory Issues Branch Division of low-level Waste Management and Decommissioning Office of Nuclear Material Safety and Safeguards

SUBJECT:

MEETING BETWEEN LIPA AND NRC REGARDING SHOREHAM DECOMMISSIONING PROJECT STATUS, OCTOBER 22 AND 23, 1992 On October 22 and 23,1992, NRC staff met with representatives of the Long Island Power Authority (LIPA) to discuss the status of the Shoreham Nuclear Power Station decommissioning project. A list of attendees is attached. On October 22, 1992 LIPA presented the general overview of project status and conducted a site tour. On October 23, 1992, the meeting focused primarily on LIPA's proposed termination survey plan.

Several topics were covered during the project overview including:

1. decommissioning organization and overview,
2. decommissioning status,
3. radioactive waste stream overview,
4. personnel radiation exposure overview,
5. termination survey schedule,
6. NRC licensing interface, and
7. Quality assurance overview.

To date, all of the internals of the reactor vessel have been removed. A dry cutting station has been constructed in the former separator storage pool. The 090074 w

hW .-

L ' '

av 9212140272 921201 2 DR ADOCK 0500 pp

g.

10/22-23 SHOREHAM MLETING DEC 01 d dry cutting station is currently Leing used to cut the steam separator, using plasma arc, into sections appropriate for shipment. The dryer will also be cut in the dry cutting station. The current LIPA schedule calls for the completion of the final sur vey in April 1994, the submittal of the final survey report NRC in June 1994. and the termination of the license in July 1994. NRC discussed the proposed schedule with LIPA, pointing out that it is unlikely that the license could be terminated one month af ter the final survey report was submitted to NRC.

NRC and LIPA agreed to develop together a realistic schedule that minimizes delays.

The "Shoreham Decommissioning Project Termination Survey Plan, Revision 0," was approved by the LIPA review committee on October 20, 1992. A det ailed overview of the plan was presented to NRC staff. The plan essentially follows the guidance in Draf t NUREG/CR-5849, " Manual for Conducting Radiological Surveys in Support of L icense t ermination". NRC recieved a copy of the plan at the meeting.

On Noverber 24, 1992, I called Gary Gisonda, LIPA Supervisor of Nuclear Licensing to inform him that the plan would be submitted to the docket and to ask him if the plan contained any proprietary information. He responded that the plan contained no proprietory information. Therfore, I will submit the plan to the Docket in its entirety.

Cricir.nl Sicned By David N. Fauver, Health Physicist Iatilities Section Decommissioning and Regulatory issues Branch Division of low-level Waste Management and Decommissioning Office of Nuclear Material Safety and Safeguards Dist ribut ion: Central File NMSS r/f LLWM r/f RBangart EWBrach JAusiin JSurmeier LBell MWeber ICJohnson llDR r/f PDR: Yes.y No_ _ Category: Proprietary _ or CF Only _

ACNW: Yes __ No.(

SUBJECT ABSIRACT: 10/22-23 SHOREHAM MEETING OFflCIAL RECORD COPY OFC LLWMit E LLWMt E L L WP14 E NAME DFauver LBell JA in LDAT_E _ _ _ 11/2//92 11/3P/92 llio I /92 C = COVER E = COVER & ENCLOSURE N = NO COPY Off.lCIAL RECORD COPY: S:\LlWM1YPE\LIPAl

DEC 011992 ATTACHMENT 1 LIST Of ATTENDEES X MEETING BETWEEN LIPA AND NRC ON STATUS OF SHOR1H_A_tj DECOMMISSIONING PROJEO . OCTOBER 22 AND 23. 19922 PERSON ORGANIZATION Richard Bangart NRC Larry Bell NRC David Fauver NRC Wade Adams ORISE fred Petschaur LIPA Artie Bortz LIPA Les Hill LIPA Gary Gisonda LIPA Ron Nimitz NRC Larry Britt LIPA Bruce Mann LIPA Mike Tucker LIPA Jim Joyner NRC a-d l

_ - - - , - = - - . - , -

i

. 1 I

10/22-23 SHOREHAM MEETING -

2-

/

dry cutting station is currently being used to cut the steam e parator, using plasma arc, into sections appropri.ite for shipment. The drye will also be cut in the dry cutting station. The current LIPA schedule calls or the completion of the final survey in April 1994, the submittal of the fina survey report NRC in June 1994, and the termination of the license in July 19 ' .4 NRC discussed the proposed schedule with LIPA, pointing out that it is un kely that the license l could be terminated one month after the final survey rep t was submitted to NRC. I NRC and LIPA agreed to develop together a realisti schedule that minimizes del ay s .  ;

lhe "Shoreham Decommissioning Project Termination urvey Plan, Revision 0," was approved by the LIPA review committee on October 0, 1992. A detailed overview of the plan was presented to NRC staff. Th plan essentially follows the guidance in Draf t NUREG/CR-5512, " Manual for C nducting Radiological Surveys in Support of License termination". NRC recieve a copy of the plan at the meeting.

On November 24, 1992, I called Gary Gisonda, IPA Supervisor of Nuclear Licensing to inform him that the plan would be subm ted to the docket and to ask him if the plan contained any proprietary infoymation. He responded that the plan cont. tined no proprietory information. tierfore, I will submit the plan to the Docket in its entirety.

David . Fauver, Health Physicist facil ties Section Decommissioning and Regulatory issues Branch Div sion of low-level Waste Management nd Decommissioning fice of Nuclear Material Safety and Safeguards Distribution: Central File NMSS r/f LLWM r/f RBangart EWBrach JAustin JSurmnici LBell MWeber TCJohnson LLDR r/f PDR: Yes -

No- Ca egory: Proprietary or CF Only ~

ACNW: Yes- - . - No--

SUBJFCT ABSTRACT: 10 22-23 SHOREHAM MEETING OFFICIAL RECORD CDP 4 0FC #Of E Wt E LLWM E NAME [ , DFauver LBell JAustin DATE / ll/2f/92 11/Ad92 11/ /92 C = C"VER E'= COVER & ENCLOSURE N = NO COPY-0FFICIAL j -CORD COPY: S:\LLWMTYPE\LIPAl

+

- * - - - , , - - . . . _.-.,m.,,....,.r~._.-m,_._. v.m g r _ y y m.~2_m. ,,r,. ._,,,.,3--r-- ~,w., m,