ML20126G618

From kanterella
Revision as of 19:29, 11 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards OL Review Mgt Rept Re Util Intentions to Use Water from Delaware River to Suppl Condenser Cooling Evaporative Loss When Schuykill River Unavailable
ML20126G618
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/06/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20126G559 List:
References
FOIA-85-103 NUDOCS 8506180115
Download: ML20126G618 (84)


Text

.

. -pe

[ ug;g UNITED STATES y NUCLEAR REGULATORY COMMISSION

~

g WASHINGTON, D. C. 20555 3 .j

%,, - December 6, 1984

,/

MEMORANDUM FOR: Regional Administrators Director, Office of Inspection and Enforcement Director, Office of the Executive Legal Director Director, Office of Nuclear Material Safety and Safeguards NRR Division Directors FROM: Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

SUBJECT:

OL REVIEW MANAGEMENT REPORT Enclosed is the OL Review Management Report which reflects the status of the subject plants as of mid-November 1984. All the inputs for this report were reviewed by the applicable DL Project Manager. Therefore, if warranted and the information were readily available, some portions of the report were updated beyond the mid-November 1984 cutoff date. The Diablo Canyon 1 report has been deleted because a full-power license was issued.

Please provide ycur markup of this report to me by COB December 14, 1984, the cutoff date for the next report.

2 k 1 Darrell O Eis@ h , Director Division of Licensing q Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: H. Denton T. Novak Licensing Branches #1-4 8506100115 850401 PDR FOIA SUGARMA85-103 PDR

Licensing Status of Limerick OI Investications Presently there is one OI investigation involving the Limerick facility.

Other Potential Problems PEco intends to use water from the Delaware River for make-up for condenser cooling evaporative loss when the Schuylkill River is not available based on flow and/or temperature restrictions. Power production would be possible only part of the year without the supplemental water. Construction of the Point Pleasant Station by the local water resource authority, which would divert Delaware River water for several uses, including Limerick, has been delayed by opposition of local county officials. The work will not be completed until well into 1985. Resolution of this issue involves the two affected counties, Local Water Resources Commission, as well as the applicant and other govern-mental agencies.

- _ _ - _ _ _