ML20148E359
| ML20148E359 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/28/1997 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| EA-97-050, EA-97-115, EA-97-50, NUDOCS 9706030076 | |
| Download: ML20148E359 (2) | |
Text
_
o, May 28, 1997 Nc.
97-62 EA Nos. 97-50 97-115 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
PECO Nuclear Facility:
Limerick Nuclear Generating Station Docket Nos. :
50-352/50-353 Date and Time:
Monday, June 2,1997; 1:00 PM Location:
US NRC Region i Office Public Meeting Room i
King of Prussia, PA 19406
Purpose:
Predecisional Enforcement Conference to Discuss issues Associated with inaccurate Records Relating to fire Protection and Chemistry Surveillance Results j
NRC Attendees:
H. Miller, Regional Administrator, Region I C. W. Hehl, Director, Division of Reactor Projects (DRP)
R. Keircig, Chief, Projects Branch 4, DRP l
P. Swettard, Project Engineer, DRP D. Holody, Enforcement Officer, RI N. Perry, Senier Resident inspector, Limerick P. Bonnett, Resident inspector, Limerick i
i PECO Attendees:
D. M. Smith, President, PECO Nuclear W. MacFarland, Vice President, Limerick R. Boyce, Plant Manager, Limerick G. Hunger, Jr., Chairman, Nuclear Review Board and Director -
Licensing NOTE: This meeting is closed to the public. Attendance by additional NRC personnel or handicapped persons requiring assistance to attend the meeting should be made known to Rick Keimig at (610) 337-5255 by May 30,1997.
Approved by:
ORIG;NAl SIGNED BY:
Richard R. Keimig, Chief 8 ts Branch 4 9706030076 970528 PDR ADOCK 05000352 Division of Reactor Proj,ects O
PDR f
O lil.lBil.llll.llllllll.lOl.llll!Illlll i
'a j
2 i
Distribution: (Via E-Mail)
L. Callan, Executive Director for Operations, OEDO H. Thompson, Deputy Executive Director fu Regulatory Programs E. Jordon, Deputy Executive Director for Regulatory Effectiveness, Program Oversight, Investigations, and Enforcement, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation (NRR)
J. Lieberman, Director, Office of Enforcement T. Martin, Director, Division of Reactor Program Management, NRR D. Ross, Deputy Director, Office of Analysis and Evaluation of Operational Data, AEOD D. Matthews, Acting Deputy Director, Division of Reactor Program Management, NRR R. Spessard, Deputy Director, Division of Reactor Controls and Human Factors, NRR i
A. Thadani, Deputy Director for Office of Nuclear Reactor Regulation l
R. Zimmerman, Associate Director for Projects, NRR S. A. Varga, Director, Division of Reactor Projects - l/II, NRR N. Green, Jr., Policy Development & Technical Support Branch J. Stolz, Director, PD l-2, NRR W. Dean, Regional Coordinator, OEDO i
F. Rinaldi, Project Manager, Limerick, PD l-2, NRR i
N. Perry, SRI, Limerick D. Screnci, Public Affairs Officer, RI N. Sheehan, Field Public Affairs Officer, RI j
D. Chawaga, SLO M. Campion, ORA 4
Distribution:
)
PUBLIC 3
D.M. Smith, PECO Energy State of Pennsylvania RA Secretary, RI DRA Secretary, RI 1
DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region i Heceptionist i
4 i
DOCUMENT NAME: a:06-02. lim I
To receive e copy of this document, indicate in the box:
c' = Copy without attachrnent/ enclosure
- E" = Copy with attachment /enclot ure
'N' = No copy l ~
OFFICE Rl:DRP g
l J
NAME R. Keimig L DATE 546/97 /
}
OFFICIAL RECORD COPY
/
J
-r,