ML20126G618
| ML20126G618 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 12/06/1984 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20126G559 | List:
|
| References | |
| FOIA-85-103 NUDOCS 8506180115 | |
| Download: ML20126G618 (84) | |
Text
.
-pe
[
ug;g UNITED STATES NUCLEAR REGULATORY COMMISSION y
~
g WASHINGTON, D. C. 20555 3
.j
,/
December 6, 1984 MEMORANDUM FOR:
Regional Administrators Director, Office of Inspection and Enforcement Director, Office of the Executive Legal Director Director, Office of Nuclear Material Safety and Safeguards NRR Division Directors FROM:
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
SUBJECT:
OL REVIEW MANAGEMENT REPORT Enclosed is the OL Review Management Report which reflects the status of the subject plants as of mid-November 1984.
All the inputs for this report were reviewed by the applicable DL Project Manager. Therefore, if warranted and the information were readily available, some portions of the report were updated beyond the mid-November 1984 cutoff date. The Diablo Canyon 1 report has been deleted because a full-power license was issued.
Please provide ycur markup of this report to me by COB December 14, 1984, the cutoff date for the next report.
2 k
Darrell O Eis@ h
, Director 1
Division of Licensing Office of Nuclear Reactor Regulation q
Enclosure:
As stated cc:
H. Denton T. Novak Licensing Branches #1-4 8506100115 850401 PDR FOIA SUGARMA85-103 PDR
Licensing Status of Limerick OI Investications Presently there is one OI investigation involving the Limerick facility.
Other Potential Problems PEco intends to use water from the Delaware River for make-up for condenser cooling evaporative loss when the Schuylkill River is not available based on flow and/or temperature restrictions.
Power production would be possible only part of the year without the supplemental water.
Construction of the Point Pleasant Station by the local water resource authority, which would divert Delaware River water for several uses, including Limerick, has been delayed by opposition of local county officials.
The work will not be completed until well into 1985.
Resolution of this issue involves the two affected counties, Local Water Resources Commission, as well as the applicant and other govern-mental agencies.