ML20128Q822

From kanterella
Revision as of 07:11, 7 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Task Order Info Needed to Procure Svcs of Computerized Interference Elimination Through Parameter or Successor Contractor
ML20128Q822
Person / Time
Issue date: 05/09/1980
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Rose H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20126K036 List:
References
FOIA-85-301 NUDOCS 8507270057
Download: ML20128Q822 (2)


Text

r-4 Q 7EC

. , 8 3 UNITED STATES

'4  !'

g gg E NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555

'%, '****f ggy 9 1980 MEMORANDUM FOR:

H. D. Rose, Resource Management Branch, Executive Office for Management and Analysis, IE FROM:

E. L. Jordan, Assistant Director for Technical Programs, Division of Reactor Operations Inspection, IE

SUBJECT:

PURCHASE OF SERVICES FOR PIPING INTERFERENCE ANALYSIS We would like to obtain the services of Computerized Interference Elimination thru Parameter or the successor to the Parameter contract.

Task order information is enclosed.

dward

/e) l- _

Jo'rdan, Assistant Director ~

for chnical Programs Division of Reactor Operations Inspection Enclosure : As stated l

s' CONTACT: T W. Woodruff, TP l 49-28180 l

I i

l C507270057 850618 PDR FOIA HERRMAN85-301 PDR t r2

r t

TASK ORDER INFORMATION

1. Scope of Work Obtain the services of Computerized Interference Elimination, Inc. (CIE) to analytically examine a power reactor systems space for potential piping interferences. The reactor and the space will be selected by IE.
2. Objedtive of Task Areas within the space where potential piping interferences are indicated will be subject to physical inspection. The actual configuration can then be compared to the input to the seismic analysis for safety-related piping.
3. Statement of Work IE will arrange for a licensee to submit engineering drawings for the selected space (50,000 to 75,000 cubic feet) to CIE. CIE will perform an interference analysis per the attached proposal (letter from CIE dated May 1, 1980).
4. Reporting Requirements and Other Deliverables Sketches showing each interference or a statement that there are no interferences. -
5. Desired Completion Date Fo,p'rty-five days after receipt of drawings.
6. Special Instructions or Requirements All drawings are_to be returned to the licensee.
7. Place of Performance ,

CIE's offices.

8. Maximum Cost Limitation

$9,500

--,,._---v- -- -,- . , _ , , - . - . , - _ _ . , - - - - . - - - - , - - . . - -