ML20129A466

From kanterella
Revision as of 05:05, 7 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rept of Special Insp to Determine Status of Const. Possible Action Exists Re Const Done in Advance of CP Issuance
ML20129A466
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/03/1970
From: Engelken R
US ATOMIC ENERGY COMMISSION (AEC)
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20129A436 List:
References
FOIA-85-281 NUDOCS 8507270228
Download: ML20129A466 (1)


Text

. _ _ _ _ _ _ _ - _

s . . '

., t l

f eq

  1. e UNITED STATES .

E ATOMIC ENERGY COMMISSION I

  1. WASHINGTON. O C. 20545 I k,rg' DEc J 1970 R. S. Boyd, Assistant Director for Boiling Water Reactors, DRL (2)

LOliG ISLAliD LIGHTI!iG COMPAliY (SHORElW4) - DOCKET liO. 50-322  !

The enclosed report of a special inspection to determine the status of construction of the subject facility is transmitted for information and for possible action. The poccible action is with recpect to the i extent to uhich ccnstruction han proceeded in cdvance of isauance of a Conctraction Fermit. This matter ic diccucced further in the CO:I g transmittal cemo, Howard to O'Reilly (ccciosed) and in a note, Lcv to '

florrio dated liovember 24, 1970. ,

t WL s /.0v~. l R. H. Enac1 ken, Acciatant Director j for Inspection and Enforcement i Division of Compliance l

Enclosures:

1. Memo, Howard to O'Reilly dtd 11/25/70
2. C0 Report tio. 322/70-6 ccv/enclosurca!

E.G.Cano,DRS(3)

P. A. Morris, DRL R.C.DcYoun6, DBL (2)

D.J.Skovholt,DRL(3) ,

P.W. Hove, DEL (2)

A. Giambusco, CO L. Kornblith, Jr., CO R

/,egionni Directoro,

. M. llovard, CO I CO REO Filen ,

0507270220 05060D PDR FOIA CAMDGOD-201 PDri

/

l,