ML20245E965
| ML20245E965 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 02/02/1989 |
| From: | Travers W Office of Nuclear Reactor Regulation |
| To: | Butler W Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20245D636 | List: |
| References | |
| FOIA-89-100 NUDOCS 8902080195 | |
| Download: ML20245E965 (1) | |
Text
__
r MEMORANDUM FOR: Walter R. Butler, Director Project Directorate 1-2 Division of Reactor Projects 1/11, hRR FROM:
William D. Travers, Chief l
Emergency Preparedness Branch Division of Radiation Protection and Emergency Preparedness, NRR
SUBJECT:
FORWARDlHG 0F FEMA CORRESPONDENCE The enclosed letter, as identified below, is forwarded for action as recommended.
Subject of letter (dated 12/20/88) for Shoreham (plant)
( ) FEMA 44 CFR 350 finding for state and local plans.
(X) FEMA evaluation of the alert and notification system.
( ) FEMA comments concerning the public information brochure.
We recommend that you forward the enclosed FEMA letter and draf t ANS report to the licensee for their information and use.
ORIGINAL SIGNED BY WILLIAM 0.TRAVER$
William D. Travers, Chief Emergency Preparedness Branch Division of Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation DISTRIBUTION w/o enclosure to FEMA Memo:
Enclosure:
FEMA Ltr. dtd. 12/20/88 FJCongel, HRR and Draft Report WDTravers, NRR CRVan Niel, NRR FKantor, NRR EJReis, 0GC SWBrown, NRR RRBellamy, RI WJLazarus, R1 RTHogan, NRR Central Files PEP 8 R/F PI S
PEPS /0EP SC/
DREP C PEP /0 EP
&op RTHogan:sc FKa or Tr e 4 7 2/ t /89 2/1/89 89
'I N
- h. /76 I
r.
CF s,7 y
4 i
\\
Federal Emergency Management Agency 5
[
Washington, D.C. 20472 3
DEC 2 0 Iggg MEMORANDUM FOR:
Frank J. Congel Director Division of Radiological Protection and Emergency Preparedness Office of Nuclear Reactor Regulations U. S. Nuclear Regulatory Commission FROM:
r Assistant Associate Director Office of Natural and Technological Hazards
SUBJECT:
Preliminary Review of the Shoreham Nuclear Power Station Alert and Notification System The Federal Emergency Management Agency (FEMA) has completed the preliminary technical review cf the Shoreham Nuclear Power Station alert and notification system (ANS).
A preliminary draft report assessing the adequacy of the siren coverage provided by the Shoreham ANS has been completed and forwarded to FEMA Region i
II for review.
A copy of this preliminary report is enclosed for your information.
Preparation of a preliminary ANS report is the first step in FEMA's ANS review process.
If the ANS alerting coverage is determined to be adequate in the preliminary technical analysis, a telephone survey of households in the emergency planning zone is conducted following a full activation of the ANS to determine the percentage of the population directly alerted by the system.
After the telephone survey.a final draft report incorporating the results of the survey is prepared for Regional review.
Once all FEMA REP-10 requirements are satisfied, a final report is issued to NRC along with a finding on the adequacy of the ANS.
Since our preliminary technical analysis indicates that the alerting coverage provided by the ShorJham ANS is adequate, the telephone survey can now be scheduled.
We are cu'rrently waiting for a p pr ov a l from the Office of Managemen't and Budget (OMB) to cunduct the four remaining telephone surveys in our alert and notification system review program; however, we expect OMB approval in the near future and.would like to begin preparing for the Shoreham survey.
To assist us in the preparations we would appreciate it if the NRC could coordinate with the Long Island Lighting Company to establish a survey date with the understanding, of course, that any date chosen must be acceptable to FEMA and our technical contractors.
Approximately six weeks will be required to draw the sample; therefore, most dates after late January 1989 could be accommodated for conducting the survey.
If you need any additional information to assist yut. in this coordination effort, please call me at 646-2871.
?
m,.
~ u ww. n.
p.
a November 7, 1988 MEMORANDUM FOR: Richard W. Krimm Assistant Associate Director Office of Natural and Technological Hazards Federal Emergency Management Agency FROM:
Frank J. Congel, Director Division of Radiation Protection and Energency Preparedness Office of Nuclear Reactor Regulation
SUBJECT:
FEMA SUPPORT FOR HRC LICENSING 0F SHOREHAM NUCLEAR POWER STATION i
Enclosed is a Long Island Lighting Company (LILC0) letter dated November 1,1988 transmitting support documentation consisting of the Ingestion Pathway Brochure for the Shoreham Nuclear Power Station (SNPS) Local Offsite Radiological Emer-i In accordance with the provisions of the April 9,.1985 gency Response Plan.
NRC/ FEMA Memorandum of Understanding, we request that FEMA review the LILC0 document in conjunction with FEMA's ongoing review of the Shoreham offsite emergency plan.
if you have any questions, please call me at 492-1088.
Original signed by FrankJ. Congel Frank J. Congel, Director Division of Radiation Protection and Emergency Preparedness Office of Nuclear Reactor Regulation
Enclosure:
_ t hb DISTRIBUTION:
LILCO Ltr. dtd. 11/1/88 FJCongel, NRR RRBellamy, RI WDTravers, NRR WJLazarus, RI RJBarrett, NRR EFFox, RI LJCunningham, NRR SWBrown, NRR CRVan Niel, NRR RTHogan, NRR FKantor, NRR Central Files MLawless, FEMA PEPB R/F EJReis, 0GC SC>>>1Js is V U { (( (pyC7Y Fu f }\\
D/DREP/NRR /f C/fEf Gg%/RR PEPB/NRR SC/PEPB/NRR rs FJCongel J
RTHogan:sc FKantor WD j
11/ /88 11/ /88 11
/8 11/7/88 I
[T i
_ _ _ _ _ _ _ _ _ - _