ML20129B041

From kanterella
Revision as of 02:32, 7 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Order Extending Time Until 850719 for Commission to Act to Review ALAB-782.Served on 850712
ML20129B041
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/11/1985
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Asselstine J, Bernthal F, Palladino N
NRC COMMISSION (OCM)
References
CON-#385-778 ALAB-782, OL, NUDOCS 8507150435
Download: ML20129B041 (1)


Text

) UNITED STATES OF AMERICT NUCLEAR REGULATORY COMMISSION COMMISSIONERS:

Nunzio J. Palladino, Chairman James K. Asselstine M M 12 N5 Frederick M. Bernthal Lando W. Zech, Jr.

DCCdi!ED

}

In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Dockegyo. ,

(Diablo Canyon Nuclear Power )

Plant, Units 1 and 2) ) TFg: ggt (g.,

g I BRANCH ORDER Pursuant to 10 CFR 2.772, the time for the Commission to determine whether to review ALAB-782 is hereby extended to July 19, 1985.

It is so ORDERED.

For the Com ssion l'

6 dSAMUEL 4 3. Ot CilILK A

Secretary of the Commission Date at Washington, D.C. this

(( 'e day of July, 1985.

8507150435 850711 PDR ADOCK 0500027S O PDR Osa7_