ML20129C336

From kanterella
Revision as of 23:21, 6 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 961021 Meeting W/Officials of Vynpc to Discuss Status of Licensees Activities to Restore Fire Protection Program at VT Yankee Nuclear Power Station to Full Compliance W/App R to 10CFR50
ML20129C336
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/18/1996
From: Craig Harbuck
NRC (Affiliation Not Assigned)
To: Bajwa S
NRC (Affiliation Not Assigned)
References
NUDOCS 9610230296
Download: ML20129C336 (5)


Text

- _ . . - - - .- - . . . _ . - . . - ..- - - . - . . - . - . - - . - - - -

! October 18, 1996 1

i

MEMORANDUM T0
S. Singh Bajwa, Acting Director l

! Project Directorate I-1 4

Division of Reactor Projects - 1/II Office oT Nuclear Reactor Regulation FROM: C. Craig Harbuck, Acting Senior Profect Manager l Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

SUBJECT:

MEETING WITH OFFICIALS OF VERMONT YANKEE NUCLEAR POWER I CORPORATION (VYNPC) j i DATE & TIME: Monday, October 21, 1996 9:00 a.m. to 5:00 p.m.

LOCATION: One White Flint North, Room 0-6-B-13 11555 Rockville Pike 1 North Bethesda, Maryland j PURPOSE: The meeting was requested by the staff to discuss the status ,

of,the licensee's activities to restore the fire protection '

program at the Vermont Yankee Nuclear Power Station to full compliance with Appendix R to 10 CFR Part 50.  !

PARTICIPANTS *: Participants of the meeting from the NRC include members of the Office of Nuclear Reactor Regulation (NRR), and Region I (R-1) i FI VYNPC i C. Harbuck, NRR B. Sojka T. Marsh, NRR A. Parker S. West, NRR J. Boivin W. Ruland, R-I W. Pittman W. Cook, R-I D. Yasi Docket No. 50-271

Enclosure:

Agenda cc w/ encl: See next page CC( l CONTACT: Craig Harbuck (301)415-3140

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.

DOCUMENT NAME: VY801.MTG To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure "E" - Copy with attachment / encl 6sure "N" - No copy 0FFICE PM: POI 1 [E PM:PO!-1./j///71A, l D: POI 1 N l l l NAME CNerbuck:sw VP SLittle *[/// IU 55eJwe f(/

DATE 10/J4/ % 10/1V/ M /li 10////96~ 10/ /% 10/ /%

i p Offic'al Record Copy 9610230296 961018 PDR ADOCK 0500 1 g (hh . .

Neetina Notice E-Mail Hard Copy R. Zimnerman (RPZ) Docket File S. Varg.t (SAV) PUBLIC J. Zwolinski (JAZ) PDI-l Reading S. Bajwa (SSB1) OGC D. Dorman (DHD) ACRS C. Harbuck (CCH) OWFN Receptionist S. Little (SLL)

E. Jordan (e-mail to JKR) cc: Licensee & Service List OPA (e-mail to OPA)

L. Marsh S. West W. Ruland, R-I W. Cook, R-I W. Dean (WMD)

D. Screnci (DPS), Region I PMNS (Meeting Announcement Coordinator) l i

p uc g, e- t UNITED STATES s g NUCLEAR REGULATORY COMMISSION "o 's WASHINGTON, D.C. 2056Mm01 ]

%...+

  • October 18, 1996 l

MEMORANDUM T0: S. Singh Bajwa, Acting Director l Project Directorate I-1 Division of Reactor Prcjects - I/II Office of Nuclear Reactor Regulation

! FROM: C. Craig Harbuck, Acting Senior Project Manager. [,  ;

Project Directorate I-l -

Division of Reactor Projects - I/II b "c:t '. I b Office of Nuclear Reactor Regulation 4

SUBJECT:

MEETING WITH OFFICIALS OF VERMONT YANKEE NUCLEAR POWER CORPORATION (VYNPC)

DATE & TIME: Monday, October 21, 1996 9:00 a.m. to 5:00 p.m.

LOCATION: One White Flint North, Room 0-6-B-13 11555 Rockville Pike North Bethesda, Maryland

PURPOSE: The meeting was requested by the staff to discuss the status l l of the licensee's activities to restore the fire protection program at the Vermont Yankee Nuclear Power Station to full compliance with Appendix R to 10 CFR Part 50.

PARTICIPANTS *: Participants of the meeting from the NRC include members of

, the Office of Nuclear Reactor Regulation (NRR), and Region I (R-1) 4 NRC VYNPC C. Harbuck, NRR B. Sojka T. Marsh, NRR A. Parker S. West, NRR J. Boivin W. Ruland, R-I W. Pittman W. Cook, R-I D. Yasi l

Docket No. 50-271

Enclosure:

Agenda cc w/ encl

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.

Vt:rmont Yankee Nuclear Power Station  ;

Vermont Yankee Nuclear Power '

Corporation cc:

Regional Administrator, Region I G. Dana Bisbee, Esq.

U. S. Nuclear Regulatory Commission Deputy Attorney General  ;

475 Allendale Road 33 Capitol Street King of Prussia, PA 19406 Concord, NH 03301-6937 l

R. K. Gad, III Resident Inspector i Ropes & Gray Vermont Yankee Nuclear Power Station One International Place U.S. Nuclear Regulatory Commission Boston, MA 02110-2624 P.O. Box 176 Vernon, VT 05354 l Mr. Richard P. Sedano, Commissioner Vermont Department of Public Service Chief, Safety Unit 120 State Street, 3rd Floor Office of the Attorney General Montpelier, VT 05602 One Ashburton Place, 19th Floor Boston, MA 02108 Public Service Board State of Vermont Mr. David Rodham, Director  !

120 State Street ATTN: James Muckerheide Montpelier, VT 05602 Massachusetts Civil Defense Agency 400 Worcester Rd.

Chairman, Board of Selectmen P.O. Box 1496 l Town of Vernon Framingham, MA 01701-0317 P.O. Box 116 Vernon, VT 05354-0116 Mr. Raymond N. McCandless Vermont Division of Occupational Mr. Jay Thayer, Vice President and Radiological Health Vermont Yankee Nuclear Power Administration Building Corporation Montpelier, VT 05602 Ferry Road Brattleboro, VT 05301 Mr. J. J. Duffy Licensing Engineer i Vermont Yankee Nuclear Power  ;

Corporation 580 Main Street Bolton, MA 01740-1398 i Mr. Robert J. Wanczyk, Plant Manager l

Vermont Yankee Nuclear Power Station Mr. Donald A. Reid  !

P.O. Box 157, Governor Hunt Road Vice President, Operations Vernon, VT 05354 Vermont Yankee Nuclear Power Corporation Ferry Road Mr. Ross B. Barkhurst, President Brattleboro, VT 05301 i 1

Vermont Yankee Nuclear Power Corporation Ferry Road '

Brattleboro, VT 05301 I

i l

l i

l I

Y a ,

I .

I.

1 i

AGENDA l

1. Post-fire Safe Shutdown Capability In general ,

l For areas in which exemptions have been accepted including viability of pre-outage safe shutdown analysis

2. Compensatory Measures (purposes, objectives, etc.)
3. Plant Modifications Completed During Outage
4. Remaining Plant Modifications and Schedule 1
5. Appendix R Compliance Absent Exemption Approval l

l i

I l

L r

Enc' osure l

i