Application for Amend to License NPF-42,requesting Rev to Bases for TS 3.8.1.1 Re Electrical Power Systems - AC Sources
ML20132G982
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/20/1996
From: Muench R
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132G984 List:
References
ET-96-0106, ET-96-106, NUDOCS 9612270102
Download: ML20132G982 (2)


Text

. _ __ . _ _

D

-  ?

.c O, .

A Wf#LF CREEK NUCLEAR OPERATING CORPORATION Richard A. Muench Vice President Engineering i December 20, 1996 t

ET 96-0106 i

U. S. Nuc2 ear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D. C. 20555

Reference:

Letter dated August 9, 1996, from USNRC, to N. S. Carns, WCNOC

Subject:

Change to Bases for Technical Specification 3.8.1.1,

" Electrical Power Systems - A. C. Sources" Gentlemen:

The Reference issued Amendment No. 101 to Facility Operating License No. )

NPF-42 for Wolf Creek Generating Station (WCGS). Amendment No. 101 revised i Technical Specification 3/4.8.1, ' Electrical Power Systems-A. C. Sources," and its associated Bases to achieve an overall improvement in emergency diesel generator reliability and availability. ,

1 WCGS Technical Specification 3.8.1.1, Action b and Action c specify the required actions to be taken with inoperable A. C. electrical power sources.

Action b specifies the required actions to be taken within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with one inoperable diesel generator. Action c specifies the required actions to be taken within eight hours with one inoperable diesel generator and one offsite  ;

power circuit inoperable. l Review of the Bases, issued by the Reference, has identified that the second paragraph of Bases page B 3/4 8-2 should be revised to better define the time restraints associated with Technical Specification 3.8.1.1, Actions b and c.

The verbiage, which had been revised by Wolf Creek Nuclear Operating Corporation (WCNOC) in the Bases, does not make a distinction between the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> requirements of Action b and the eight hour requirements of Action c.

WCNOC is providing the revised Bases change to reflect this difference and i requests that the NRC issue the revised Bases page change.

I

\

9612270102 961220 }

PDR ADOCK 05000482 P PDR P.O. Box 411/ Burhngton, KS 66839 i Phone: (316) 364-8831 An Equal Opporturuty Employer M FHCVET

I l

l ET 96-0107 Page 2 of 2 I

If you should have any questions regarding this response, please contact me at {

(316) 354-8831, extension 4034, or Mr. Terry S. Morrill at extension 8707.  !

1 i

very truly yours, l

M44/

Richard A. Muench RAM /jad Attachment I cc: L . -J . Callan (NRC), w/a j W. D. Johnson (NRC) , w/a j J. F. Ringwald (NRC) , w/a l J. C. Stone (NRC), w/a f