ML20141D974
| ML20141D974 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 06/24/1997 |
| From: | Stone J NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20141D977 | List: |
| References | |
| RTR-REGGD-01.014, RTR-REGGD-1.014 NUDOCS 9706300165 | |
| Download: ML20141D974 (5) | |
Text
..
(
pcrog y
UN11ED S' RATES E
NUCLEAR REGULATORY COhRilSSION WASHINGTON. D.C. 20$55. 0001
$pcN/
WOLF CREEK NUCLEAR OPERATING CORPORATION i
WOLF CREEK GENERATING STATION DOCKET NO. 50-482 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.106 License No. NPF-42 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Wolf Creek Generating Station (the facility) Facility Operating License No. NPF-42 filed by the Wolf Creek Nuclear Operating Corporation (the Corporation), dated March 21, 1997, as supplemented by letter dated A]ril 15. 1997, complies with the standards and requirements of t1e Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chepter I:
B.
The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission:
C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations:
D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public: and l
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l-9706300165 970627 PDR ADOCK 05000402 P
- l *.
i 2.
Accordingly, the license is amended by changes to the Technical
)
Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-42 is hereby
)
amended to read as follows:
j 2.
Technical Soecifications j
The Technical Specifications contained in Appendix A. as revised l
through Amendment No.106. and the Environmental Protection Plan contained in Appendix B. both of which are attached hereto, are L
l hereby incorporated in the license. The CorporatW1 shall operate l
the facility in accordance with the Technical Specifications and the l
Environmental Protection Plan.
l 3.
The license amendment is effective as of its date of issuance and shall i
be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION g
[
James C. Stone, Senior Project Manager l
l Project Directorate IV-2 Division of Reactor Projects III/IV l
Office of Nuclear Reactor Regulation l
1
Attachment:
Changes to the Technical Specifications Date of Issuance:
June 24, 1997 l
4 I
4 i
)
l i
l l
l
l.
i
. ATTACHMENT TO LICENSE AMENDMENT NO.106 l
FACILITY OPERATING LICENSE NO. NPF-'42 DOCKET NO. 50-482 Replace the following 3 ages of the Appendix A Technical Specifications with l
l the attached pages.
T1e revised pages are identified by Amendment number and t
contain marginal lines indicating the areas of change.
The corresponding overleaf pages are also provided to maintain document ' completeness.
REMOVE INSERT l
6-18c 6-18c 6-18d i
l
\\
l l
l I
l 4
i
,.~.
i
- ADMINISTRATIVE CONTROLS 5'
PROCEDURES AND PROGRAMS-(Continued) 3.
A' surveillance program to ensure that the quantity of radioactivity contained in following outdoor liquid radwaste tanks that are not surrounded by: liners, dikes, or walls capable of holding the tanks' contents and that do not have tank overflows and surrounding area drains connected to the liquid radwaste system, is less than the amount that would result in concentrations less than the limits of 10 CFR 20, Appendix B, Table II, Column 2, at the nearest potable water supply and the nearest surface' water supply in an UNRESTRICTED AREA, in the event'of.an uncontrolled release of the tank's contents.
)
i a.
Reactor Makeup Water Storage Tank, L
b.
Refueling Water Storage Tank, i
c.
Condensate Storage Tank, and L
d.
Outside Temporary tanks, excluding demineralizer vessels and the liner being used to solidify radioactive waste.
The provisions of Specifications 4.0.2 and 4.0.3 are applicable to the Explosive. Gas and Storage. Tank Radioactivity Monitoring Program surveillance frequencies.
l b.
Reactor Coolant Pump Flywheel Inspection Program Each reactor coolant pump flywheel shall be inspected per the -
recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, dated August 1975.* In lieu of
.I Position C.4.b(1) and C.4.b(2), conduct a qualified.in-place UT examination over the volume from the inner bore of the flywheel to the circle of one-half the outer radius or conduct a' surface examination (MT and/or PT) of exposed surfaces of the removed flywheels-once every ten years' coinciding with the inservice j
inspection schedule as' required by ASME Section XI.
c.
Containment Tendon Surveillance Program i
This-program provides controls for monitoring tendon performance, including the effectiveness of the tendon corrosion protection medium, to ensure containment structural integrity. The program shall include baseline measurements prior to initial plant operation as well as periodic testing thereafter. The Containment Tendon Surveillance Program, and its inspection frequencies and acceptance criteria, shall be in accordance with Wolf Creek Generating Station position on draft Revision 3 of Regulatory Guide 1.35-dated April 1979.
l l
The provisions of Specifications 4.0.2 and 4.0.3 are applicable 4
to the Containment Tendon Surveillance Program inspection frequencies.
- The volumetric examination and surface examination of the Reactor Coolant
(
Pump "D" motor flywheel for the First 10-Year Inservice Inspection Interval may be delayed one' cycle to coincide with the Fall 1997 refueling outage.
WOLF CREEK - UNIT 1 6-18c Amendment No. 80,07,101,106
~,
3 ADMINISTRATIVE CONTROLS l
PROCEDURES AND PROGRAMS (Continued) 6,9 REPORTING RE0VIREMENTS ROUTINE REPORTS 6.9.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted to the Regional Administrator of the NRC Regional Office unless otherwise noted.
1 WOLF CREEK - UNIT 1 6-18d Amendment No.106 l