ML20217D975
| ML20217D975 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/12/1999 |
| From: | Stephen Dembek NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20217D980 | List: |
| References | |
| NUDOCS 9910180214 | |
| Download: ML20217D975 (7) | |
Text
m A Miug
. S 8e t
UNITED STATES
-Y y
NUCLEAR REGULATORY COMMISSION g
WASHINGTON, D.C. 20666-0001 i
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION l
DOCKET NO. 50-482 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.128 License No. NPF-42 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Wc!! Creek Generating Station (the facility)
Facility Operating License No. NPF-42 filed by the Wolf Creek Nuclear Operating Corporation (the Corporation), dated July 8,1999, as supplemented by letter dated September 2,1999, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
99101G0214 991012 PDR ADOCK 05000482 P
.. 2.
Accc:dingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-42 is hereby amended to read as follows:
2 Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 128, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated in the license. The Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of its date of issuance and will be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Stephen Dembek, Chief, Section 2 Project Directorate IV and Decommissioning i
Divicion of Licens ng Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technica!
Specifications Date of issuance: October 12, 1999 i
l
r ATTACHMENT TO LICENSE AMENDMENT NO.128 FACILITY OPERATING LICENSE NO. NPF-42 DOCKET NO. 50-482 l
I Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are to both the current Technical Specifications (CTS) and to the improved Technical Specifications (ITS). The revised pages are identified by the above amendment number and contain marginallines indicating the areas of change. The corresponding overleaf pages are also provided to maintain document completeness.
REMOVE INSERT 3/4 3-27 3/4 3-27 (CTS) l 3,3-45 3.3-45 (ITS) a
I l
)
s s
u 6
B s
V1 V5 0
1 E
0 0 21 L
2 1
(9 g
B 1
1 s
i A
(2 V1 e
s WE V0
- 9. /w la 9
u p
O U 5
L 2+
y 5
y V
7 a
0 )s a A
A A
le L
9 A
A S
L A 81 le u e 1
l
/w d 2Bd N
N N
b N
s N
1 T
A V 2
N a
w I
O lo P
l V
_y A
a i
0
)l g
2s s e d
is tS T
1 1 Vud n
- 9. B a
p
(/
P N
I I
V )w s
y 6V9 s
0 t
R O
3 sa n
7 N
I i
8u l 001 A
A A.
io 9
A A
T P
121 P
e
/w N
N N
p 1
1 2Bd 2(
N s
N t
O Rt e
TS S
ITA p
i T
rT
)
N S
E R(
n M
OR io ta U
SO lo R
NR T
ER A.
A.
A A
A A
A A.
s I
S SE N
N N
N N
N N
N
)
N A
d I
"e eu M
n s
E a
itn T
h o
S A
A A
A A
P A
A A.
C Y
Z N
N N
N N
la N
N N
l S
(
4 r
N o
-3 O
f 3
)
e IT A
v E
A T
o L
(
b U
B T
E
.a A
C C
a.
T A
.N 3
S A
E LW me R
AO t
i U
T L e
T OL A
A A
A A
A A
A.
e A
TA N
N N
N N
S N
N N
EF YTEF 1
A 1
S P
r s s D
)S e
ek e.
E nn nnA n
n u o c
r r
c o
o u
R e
e io ioF o
e t
s g
g n
n aa aaS it u
al s
4 t it t it E
ae ad i
it r
o o
uu) u uE la q
ee e
P EN lt g
lt e
t t t o
e Ft r
S t t oa o
n P
t a
a ccP ccP s
S yI I
vl vd lo it AA AA O c
d em e
ip o
r a i
G r
i t
r S
er s
n eV dg r
c N
d ids idB e
L Ss iz T
f e "A
a at i
r nf n e t n(
t n(
I E
T o
r r
N w
U; U Da m
la a s a s I
e a
a a
y u
o g
o u
m cy m cy s
t Vit o
n oia oia s
e dS c
da t
U o
Vs gl a
t e
s P
ko k
R a
uo e u o e h
a r n e
a gl rl t
t L
L Go lo r
e eo f
4 -
M ALR ALR P
S ei P
R t
A o
t r
na N
s t
d iu O
s n
i gt l
o o
o nc I
T L
a b
C a
b c
d.
S EA a
b CNU F
8 9.
0 1
1 1
hs o$m7 Ch a
>!E!EI
3-TABLE 3.3-4-(Continued)
TABLE NOTATIONS
'* Time constants utilized in the lead-lag controller for Steam Pressure-Low
> 50 seconds and't2 5 5. seconds.
CHANNEL CALIBRATION shall ensure are 13
=that these time constants are adjusted to these values.
- The time constant utilized in ti. ru.n-lag controller for Steam Line Pressure-Negative Rate-High is greater'te'an or equal to 50 seconds.. CHANNEL CALIBRATION shall ensure that this time constant is adjusted to this value.
i l
l 4
WOLF CREEK - UNIT 1 3/4 3-28 j
LOP DG Stirt instrumIntation 3.3.5
. SURVEILLANCE REQUIREMENTS -
SURVEILLANCE FREQUENCY SR 3.3.5.1 Not Used.
NOTE-Verification of time delays is not required.
i Perform TADOT.
31 days SR 3.3.5.3 Perform CHANNEL CAllBRATION with nominal Trip 18 months l
Setpoint and AI;owable Value as follows:
a.
Loss of voltage Allowable Value 2 82.5,120V l
l bus with a time delay of 1.0 + 0.2, -0.5 sec.
Loss cd vcitage nominal Trip Setpoint 83V, l
I 120V bus with a time delay of 1.0 sec.
b.
Degraded voltage Allowable Value h 105.9V, l
120V bus with a time delay of 119 i 11.6 sec.
Degraded voltage nominal Trip Setpoint l
106.9V,120V bus with a time delay of 119 sec.
SR 3.3.5.4 Verify LOP DG Start ESF RESPONSE TIMES are 18 months on a within limits.
STAGGERED TEST BASIS l
i Wolf Creek - Unit 1 3.3-45 Amendment No.433,128 j
c.
Cintilnm:nt Purge isolation Instrumentition 3.3.6 3.3 INSTRUMENTATION 3.3.6 Containment Purge Isolation Instrumentation LCO 3.3.6 The Containment Purge Isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.6-1.
ACTIONS NOTE-Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A.
NO.E A.1 Place and maintain immediately Only applicable in containment purge supply MODE 1, 2, 3, or 4.
and exhaust valves in closed position.
One or more Functions with one or more channels or trains inoperable.
(continued)
Wolf Creek - Unit 1 3.3-46 Amendment No.123