ML20133H553

From kanterella
Revision as of 01:35, 4 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Amends 104 & 102 to Licenses DPR-21 & DPR-65,respectively, Removing Training Supervisor from Tech Specs Figure 6.2-2 Re Organization Chart.Training Supervisor Now Repts to Corporate Director of Nuclear Training
ML20133H553
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/06/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20133H540 List:
References
TAC-57174, NUDOCS 8508090390
Download: ML20133H553 (8)


Text

,

. .p aewy

  1. k, UNITED STATES

[ g NUCLEAR REGULATORY COMMISSION b 'j WASHINGTON, D. C. 20555

\...../

THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACPUSETTS ELECTRIC COMPANY AND NORTHEAST NUCLEAR ENERGY COMPANY MILLSTONE NUCLEAR POWER STATION, UNIT NO. I DOCKET NO. 50-245 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 104 License No OPR-21

1. The Fuclear Regulatory Commission (the Commission) has found that:

A. The application for anendment by The Connecticut Light and Power Company, Western Massachusetts Electric Company and Northeast Nuclear Energy Company (the licensees) dated March 15, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this anendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Conmission's regulations and all applicable requirements have been satisfied.

0500045 PDR

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attechment to this license amendment and Paragraph 2.C.(2) of Provisionel Operating License No. DPR-21 is hereby anended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B as revised through Amendment No.104, are hereby incorporated in the license. The Northeast Nuclear Energy Company shall operate the facility in accordance with the Technical Specifications.

3. This license anendment is effective as of the date of issuance.

. f OR THF NI! LEAR REGULATOR 7 OMl!)SSIO ilohn A. Zwolinski, Chief Operating Reactors Branch #5 Division of Licensing Attachnent:

Changes to the Technical Specifications Date of Issuance: August 6, 1985

ATTACHMENT TO LICENSE AMENDMENT NO.104 PROVISIONAL OPERATING LICENSE NO. DPR-21 DOCLET F'O. EO 785

. Replace the following pace of the Appendix A Technical Specification with the erclosed page as indicated. The revised pace is identified by the captioned amendment number and contains vertical lines indicating the area of change.

REMOVE INSERT 6-3 6-3 O

j -

I

.t .I g I J X a $ a I

                                                                                                                                                                                   }}

ss I 4 3 eB f ~8 i 51 1 i i A  ! t 11 - l { ev .-

                      '                                                                                                                                                                                        a.

j! j l y j{ z 3 l} .!! 1 x

                                                                                                              -      $                               f i

1 B B 2 2 3 h ~ I -

                                                                                                                                           ,}                          -
                                                                                                                                                                                   }                       ~

2 al 1 6-3 Amendment No. H . M . Ef. I ,104

pn neau

         +                                       UNITED STATES
         ! "'         o,i,               NUCLEAR REGULATORY COMMISSION O              t                       WASHINGTON. D. C. 20555
         ~s...../

NORTHEAST NUCLEAR ENERGY COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY THE WESTERN MASSACHUSETTS ELECTRIC COMPANY MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 DOCKET NO. 50-336 AMENDMENT TO FACILITY OPERATING LICENSE Amendrert No. 102 License No. DPR-65

1. The Nuclear Regulatory Comission (the Commission) has found that:

A. The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee), dated March 15, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as arended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in confornity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; erd E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis #ied.

                                                                                     /

_p.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B as revised through Amendment No.102, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY CCMMISSION D'lfML+4]n f Edward J. Pyr.ch r Acting Chief Operating Reacto, Branch 83 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: August 6, 1985 I I l L

ATTACHMENT TO LICENSE AMENDMENT NO. 102 FACILTIY OPERATING LICENSE NO. DPR-65 DOCKET NO. 50-336 Replace the following page of the Appendix A Technical Specifications with the enclosed paoe. The revised page is identified by amendment number ard contairs vertical lines indicating the area o# change. The correspondino overleaf pace is provided to maintain document completeness. REMOVE INSERT 6-3 6-3 9

1] 11 .  !

                                                                       ?
                                                                                        ~

E ,a N8 l5 g 65 kh a N _2

                                                                                                             ;a]a1I        i aj                                                          i g     a       's j]j i
 -                                                        lb if           !

1 S

                                                                            '        ~

b ~ b 1

                                                                                 }}                    }                  .!

n

                                                                  ,                                                       1 8         0           S       9        y 5

I j} -

                                                                                                             }f      -

Ia m g, W ] MILLSTONE - UNIT 2 6-3 AmendmentNo.75,35,$5,/M/,102

e: TABLE 6.2-l*** l MINIMUM SHIFT CREW COMPOSITION # APPLICABLE MODES LICENSE CATEGORY 1, 2, 3 & 4 5&6 SOL 2 1* l OL 2 1 Non-Licensed 2 1 Shift Technical Advisor ** 1 None Required

  • Does not include the licensed Senior Reactor or Senior Reactor Operator Limited to Fuel Handling individual supervision CORE ALTERATIONS after the initial fuel loading.
        # The above shift crew composition and the qualified health physics technician and/or fire brigade members of Section 6.2.2. may be less than the minimum requirements for a period of time not to exceed 2 nours in order to accommodate unexpected absence provided expeditious actions are taken to fill the required positions.                                                     *
        ** The Shift Technical Advisor position may be filled by an on-shift Senior Reactor Operator only if that on-shift Senior Reactor Operator meets the Shift Technical Advisor qualifications of Section 6.3.1.
        *** Requirements for minimum number of licensed operators on shift during oper-ation in modes other than cold shutdown or refueling are contained in 10CFR50.54(m).

l l . MILLSTONE - UNIT 2 6-4 Amendment No. (6, 78, 92

                                                                                                .}}