Application for Amend to License NPF-49,revising TS 3/4.5.4 Re Refueling Water Storage Tank Min Boron Concentration
ML20247B935
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/01/1998
From: Mcelwain J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247B937 List:
References
B17210, NUDOCS 9805110155
Download: ML20247B935 (5)


Text

'

\ Northeast ""r" Fe"Y "d- (noote ison wateaorama83 fY NuclearEnergy uston, Noci,a, po ,, stauon Northeast Nuclear Fnergy Company P.O. Box 128 q >e Waterford, CT 06383-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilities System MAY - l 1998 Docket No. 50-423 B17210 Re: 10 CFR 50.59 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 Change to Technical Specification Bases Section 3/4.5.4 (PTSCR 3-8-98)

Northeast Nuclear Energy Company (NNECO) is providing the NRC Staff with a change to Technical Specification Bases Section 3/4.5.4 for information only. This change was reviewed and approved by the Millstone Unit No. 3 Plant Operating Review Committee on April 24,1998, in accordance with the provisions of 10CFR50.59.

Description of Chanae The change to Technical Specification Basis 3/4.5.4 is to mod @ the wording l associated with the Refueling Water Storage Tank minimum boron concentration.

Supplemental information i

The existing Technical Specification Basis 3/4.5.4 for boron concentration states that credit is taken for control rod insertion during a Loss of Coolant Accident (LOCA).

Control rods are only credited in the accident analysis for Small Break LOCA. Thus, the Technical Specification Bases is revised to clarify that no credit is taken for control rod insertion during a Large Break LOCA.

\.\

9805110155 980501

~

PDR ADOCK 05000423 P PDR D\

o 083422-5 REY.12-95

' U.S. Nuciscr R:gulatory Commission l B17210\Page 2 if you have any questions, please contact Mr. D. A. Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Martin L. Bowling, Jr.

Recovery Officer - Technical Services BY: IMM John P. McElv/ain~

Millstone Unit No 2 - Recovery Officer l l

I Attachments cc: H. J. Miller, Region 1 Administrator l J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 l A. C. Ceme, Senior Resident inspector, Millstone Unit No. 3 W. D. Travers, Ph.D, Director, Special Projects Office l

l I

I l

l l

l

d Docket No. 50-423

- B17210 1

Attachment 1 Millstone Nuclear Power Station, Unit No. 3 Commitments t

i May 1998 l

1

U.S. Nucl: r R gulatory Commission I B17210\ Attachment 1\Page 1 Enclosure  !

List of Regulatory Commitments l The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Regulatory Compliance at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Commitment Cornmitted Date or Outage i

NONE N/A I l

{

l i

l Docket No. 50-423 l B17210 l-l l

Attachment 2 Millstone Nuclear Power Station, Unit No. 3 Marked Up Technical Specification Page i l