Amend 70 to License DPR-21,modifying Operating License Condition 2.C(3), Fire Protection, by Deleting Existing Wording of License Condition & Replacing W/Standard Wording Provided in GL 86-10
ML20058H788
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/01/1993
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20058H731 List:
References
GL-86-10, NUDOCS 9312130224
Download: ML20058H788 (3)


Text

-

a o

fW MCO E

D-

~

k UNITED STATES

% %[v I

NUCLEAR REGULATORY COMMISSION

,/

wassinctow o.c. 20as-cooi NORTHEAST NUCLEAR ENERGY COMPANY DOCKET NO. 50-245 MILLSTONE NUCLEAR POWER STATION. UNIT 1 AMENDMENT TO FACIllTY OPERATING LICENSE Amendment No. 70 License No. DPR-21 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Northeast Nuclear Energy Company (the licensee), dated October 7, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9312130224 931201 PDR ADDCK 05000245 P

ppR

l l

2.

Accordingly, paragraph 2.C.(3) of Facility Operating License No. DPR-21 is hereby amended to read as follows:

i 2.C.(3)

Northeast Nuclear Energy Company shall implement and i

maintain in effect all provisions of the approved fire i

protection program as described in the Final Safety Analysis Report for the facility and as approved in the SERs dated September 26, 1978, November 19, 1980, February 13, 1981, February 7, 1983, October 25, 1985, November 6, 1985, August 1986, July 17,1987, April 14,1988, and October 12, 1993 subject to the following provisions:

The licensee may make changes to the approved fire i

protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

3.

This license amendment is effective as of the date of issuance, to be I

implemented within 30 days of issuance.

i FOR THE NUCLEAR REGULATORY COMMISSION j

r i

oh iF. Stolz, Directo Pr ject Directorate 4

ision of Reactor rojects - I/II Office of Nuclear Reactor Regulation

Attachment:

Page 3 of License

  • Date of Issuance:

December 1, 1993 Page 3 is attached, for convenience, for the composite license to reflect this change.

l i

t J

i

_3_

I (1)

Maximum Power Level NNECO is authorized to operate the facility at steady-state power levels up to a maximum of 2011 megawatts (thermal).

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 69, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technic.al Specifications.

(3)

Fire Protection Northeast Nuclear Energy Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the SERs dated September 26, 1978, November 19, 1980, February 13, 1981, February 7, 1983, October 25, 1985, November 6, 1985, July 17,1987, April 14,1988, and October 12, 1993 subject to the following provisions:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(4)

Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73,55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:

" Millstone Nuclear Power Station Physical Security Plan," with revisions submitted through March 29,1988; " Millstone Nuclear Power Station Suitability, Training and Qualification Plan," with revision submitted through July 21, 1986; and " Millstone Nuclear Power Station Safeguards Contingency Plan," with revisions submitted through October 30, 1985. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein, r

Amendment No. 17, 70, l