ML20140F305

From kanterella
Revision as of 20:06, 27 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Rept of All Challenges to Safety/Relief Valves,Per Tech Spec 6.9.1.5.b.No Automatic Openings of Main Steam Sys Safety Valves in Response to High Reactor Pressure Occurred During 1985.Related Correspondence
ML20140F305
Person / Time
Site: Limerick Constellation icon.png
Issue date: 02/27/1986
From: Logue R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
CON-#186-360 OL, NUDOCS 8603310341
Download: ML20140F305 (2)


Text

i,. .

M Q CORRESPONDENCt.

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET -

P.O. BOX 8699 PHILADELPHIA. PA.191o1 February 27, 1986 g,,y,.

Docket No. 50-35200 g -

Og. Q Dr. Thomas E. Murley, Administrator U.S. Nuclear Regulatory Commission @

  1. s D0cg.,

Region I 631 Park Avenue ,

Q f,gR 10 799% !?

King of Prussia, PA 19406 @

kbn

SUBJECT:

1985 Annual Report of all Challenges o ), AN

' Safety / Relief Valves for Limerick

' Generating Station Unit 1 - Report No. W. 1 %g yW @

Dear Dr. Murley:

This represents the 1985 Annual Report of all Challenges to Safety / Relief Valves for Limerick Generating Station, Unit 1 as required by Technical Specification 6.9.1.5.b. The definition of challenges considered in this report is the automatic opening of the main steam system safety / relief valves in response to high reactor pressure.

During 1985, there were no automatic openings of the main steam system safety / relief valves in response to high reactor pressure.

'During September, 1985, the main steam system safety / relief v&lves were manually opened during performance of Start-up Test Procedure 26.2, Relief Valve Rated Pressure test.

A documentation of all challenges to ti eh main steam system safety / relief valves has been submitted as part of the Monthly Operating Report in order to comply with.. Technical Specification 6.9.1.6.

Should you have any questions regarding this.m_atter, '.

please do not hesitate to contact us. x, Very t uly yours, 8603310341 860227 *

.4,[

PDR ADOCM 05000352 R PDR R. 11. Logue Supe rintendent Nuclear Services SLZ:vdw cc: E. M. Kelly, Senior Site Inspector See Attached Service List

. . , a cc: Troy B. Conner, Jr., Esq.

Ann P. Hodgdon, Esq.

Mr. Frank R. Romano Mr. Robert L. Anthony Ms. Phyllis Zitzer Charles W. Elliott, Esq.

Barry M. Hartman, Esq.

Mr. Thomas Gerusky Director, Penna. Emergency Management Agency Angus Love, Esq.

David Warsan, Esq. ,

, Robert J. Sugarman, Esq.

Kathryn S. Lewis, Esq.

Spence W. Perry, Esq.

Jay M. Gutierrez, Esq.

Atomic Safety & Licensing Appeal Board .

Atomic Safety & Licensing Board Panel Docket & Service Section (3 Copies)

E. M. Kelly Timothy R. S. Campbell February 4, 19_86

- _