FOIA-85-361, REF-GTECI-A-01, REF-GTECI-A-18, REF-GTECI-A-29, REF-GTECI-A-40, REF-GTECI-A-43, REF-GTECI-A-44, REF-GTECI-A-45, REF-GTECI-A-46, REF-GTECI-A-47, REF-GTECI-A-48, REF-GTECI-A-49, REF-GTECI-B-06, REF-GTECI-B-26, REF-GTECI-B-55, REF-GTECI-B-59, REF-GTECI-CO, REF-GTECI-DC, REF-GTECI-EL, REF-GTECI-ES, REF-GTECI-PI, REF-GTECI-PV, REF-GTECI-RV, REF-GTECI-SA, REF-GTECI-SC, REF-GTECI-SY, RTR-NUREG-CR-4025, RTR-REGGD-01.099, RTR-REGGD-05.062, RTR-REGGD-1.099, RTR-REGGD-5.062 NUDOCS 8511210037 | |
Download: ML20136C156 (8) | |
Text
_. - - - _ _ = - _ . - . - . = - . _ _ . -
0 g8A M4g
a telephone conversation on October 3,1985, that a letter was sent on an i infomal basis to all the utilities by James Tourte110tte asking that they . provide cost estimates. Not all the utilities responded to that informal ! request. The April 11, 1983, and the June 22, 1983, memoranda identified at i numbers two and four on Appendix B transmitted to the Conenission cost estimates ' from the utilities that responded. Since NRC does not have a standardized accounting system, it was difficult to evaluate the utility responses and, therefore, the matter was not pursued. [ The documents IIsted on the enclosed Appendix C are either being withhold in I their entirety or in part. The released portions of the records are belno ; placed in the PDR. The withheld records contain predecisional infomation i regarding preliminary consideration of cost analyses of unresolved safety L issues which were not pursued and finalized. This predecisional information is being withheld from public disclosure j U.S.C.652(b)(5))and10CFR9.5(a)(5)pursuanttoExemption(S)oftheFOIA(5 of the Crmnission's regulations. There : are no reasonably segregable factual portions. l Pursuant to 10 CFR 9.9 of the NRC's regulations, it has been determined that ! the infurmation withheld is exempt from production or disclosure, and that it*, i production or disclosure is contrary to the public interest. The persons ; responsible for this dental are the undersigned and Mr. Harold R. Denton, i Director, Office of Nuclear Reactor Regulation. ! I g12g{051022 [ htLLOS-341 PDM V. l
- This denial may be appealed to the NRC's Executive Director for Operations within 30 days from the receipt of this letter. As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations. U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."
Sinc r' ly, > -- l' f ,_ . M. Felton, Director i Division of Rules and Records Office of Administration
Enclosures:
As stated I
l l
l
-.w
s I e i
Re: F0!A-85-361 APPENDIX A DOCUMENTS BEING PLACED IN POR 1, 11/23/82 Memo for Murley from Triner subject: Cost Analysis Group's (CAG) Coments on Regulatory Impact Analysis (RIA) For USI A-43, Containment Emergency Sump Performance. (9 pages)
- 2. 12/30/82 Memo for Hurley from Triner subject: Working Paper on Replacement Power Cost. (7pages)
- 3. 03/01/83 Memo for Purple from Triner subject: Cost Analysis Group's Review of Backfitting Impact Costs. (15 pages)
- 4. 03/25/83 Ltr from Andrews to Milstead w/ enclosed three copies of Supplement 2 final draf t reports: A-18. I.D.3. II.E.6, and III.D.2.5(11pages)
- 5. 05/27/83 Memo for Stello from Triner subject: Cost Analysis Group's Review of Moderation of Protection of Spent Fuel Shipments-Draf t Comission Paper. (8 pages)
- 6. 07/29/83 Memo for The Comissioners from Dircks subject: Proposed Insider Safeguards Rules (121 pages)
! 7. 08/04/83 Memo for Ernst from Triner subject: Review and Coments on the l PNL Draft, "A Handbook for Value/ Impact Assessment" (10 pages)
- 8. 06/84 Final Report Generic Cost Estimated for Reactor Shutdown and Startup, Contract: NRC-33-83-500 Task II (112 pages)
- 9. 07/20/84 Memo for Speis from Triner subject: Review and Comment on Regulatory Analysis for USI A-46 Seismic Qualification for Equipment in Operating Plants (4 pages)
- 10. 08/84 Generic Cost Analysis for Steam Generator Repairs and Replacements (83pages)
- 11. 09/14/84 Memo for Minners from Hartfield subject: Review of Cost Analysis Contained in Regulatory Analysis for USI A-40--Seismic Design Criteria (6 pages)
- 12. 10/11/84 Memo for Serpan from Triner subject: Review of Cost Analysis Contained Revision 2 ofinRegulatory PNL's Value Impact Guide Analy(sis 1.99 10 pages) in Support of Proposed
- 13. 11/16/84 Memo for Serpan from Donnelly subject: Cost Analysis Group s Supplemental Cost Analysis for Regulatory Guide 1.99, Revision 2(9pages)
l l
Re: F0IA-85-361 APPENDIX A (Continued)
- 14. 01/16/85 Memo for Hardin from Feld subject: Preliminary Review of Cost Analysis Contained in NUREG/CR-4025 Concerning Proposed Design Modifications to Gessar (3 pages) I
- 15. 03/09/85 Memo for Dircks from Davis subject: Proposed Revisions to 10 CFR 73.71--Reporting of Safeguards Events (47 pages)~
- 16. 03/13/85 Memo for Scott from Triner subject: The Cost Analysis Group's (CAG) Review of Cost Burden Associated with 10 CFR 50 Regulatory Requirements (5 pages) i
- 17. 03/13/85 Memo for Russell from Trifier subject: Cost Analysis Group (CAG)
Review of Regulatory Analysis for the Shift Scheduling Project (7 pages)
- 18. 03/25/85 Memo for Wilde from Triner subject: The Cost Analysis Group's (CAG) Comments on the Regulatory Impact Analysis of the Proposed Revisions to 10 CFR 73.71--Reporting of Safeguards i Events (3 pages)
- 19. 03/26/85 Memo for Wilde from Triner subject: The Cost Analysis Group's Review of the Regulatory Impact Analysis of the Proposed Insider Safeguards Rules (5 pages)
- 20. 05/07/85 Memo for Arlotto from Triner subject: Cost Analysis of Revisions to 10 CFR Part 50, Appendix J, " Leak Tests for Primary and Secondary Containments of Light-Water-Cooled Nuclear Power Plants" (3 pages)
- 21. 05/15/85- Memo for Minogue' from Triner subject: Review of CRGR Review Package of Proposed Regulatory Guide 1.99, Revision 2 (3 pages)
- 22. 05/21/85 Routing / Transmittal slip w/ attached Reactor categories, cost and implementation schedule for proposed revision 2 to regulatory guide 1.12-(8 pages) 5 d
A
Re: F01A-85-361 I APPENDIX B DOCUMENTS ALREADY IN THE PDR
- 1. 03/15/83 Memo from Dircks to Tourtellotte in response to Tourtellotte's 1/17/83 memo, which is attached, regarding backfitting Impact Costs and Procedures. PDR # 8303240054
- 2. 04/11/83 Memo from Tourtellotte to Palladino which forwards list of utilities responding to request for cost figures on backfitting.
PDR # 8305230720
- 3. SECY 83-293 PDR # 8308080642
- 4. 06/22/83 Memo from Tourtellotte to Palladino forwarding Backfit Cost Figures for Additional Seven Utilities, AN0: 8307080259 PDR/REVGP/NRCREG (80 pages)
- 5. NUREG-0933 PDR # 8401230657 PDR/NUREG/0933R (777 pages) w/ supplements 1)501-#8408220265 PDR/NUREG/0933R (120 pages)
- 2) 502-# 8502210083 PDR/NUREG/0933R (288 pages)
- 6. 01/18/84 Memo for Phillips from Feld subject: Review and Comments on Proposed Rule for Retention of Records (4 pages)
Access. # 8502090115 PDR/F0IA/Totten 84-351
- 7. 02/15/84 Memo for Schwink from Triner subject: CAG Updated Review of 10 CFR Part 20 Revision (41 pages) Access. #8502090124 PDR/FOIA/Totten 84-351 (1 page)
- 8. 03/09/84 Memo for Thompson from Triner subject: Cost Selection for Proposed Regulation on Operating Experience on Shift (15 pages) Access. # 8502090145 PDR/F0IA/Totten 84-351 (1 page) No enclosure
- 9. 03/16/84 Memo for Schwink from Triner subject: CAG Review of Proposed Rule Concerning Decomissioning Criteria for Nuclear Facilities (11 pages) Access. # 8410030503 PDR/REVGP/NRCCRGR
- 10. 03/23/84 Memo for Sniezek from Triner subject: CAG's Review of Cost Estimated Contained in Regulatory Impact Analysis Accompanying USI A-44 (Station Blackout) (16 pages) Access. # 8502090159 PDR/F01A/Totten-84-351
- 11. 04/24/84 Memo for Speis from Triner subject: Review and Comment on NUREG-0869, Revision 1, USI A-43 Regulatory Analsis (8 pages)
Access # 8502090228 PDR/F0IA/Totten 84-351
Re: F01A-85-361 APPENDIX B (Continued)
- 12. 06/27/84 Memo for Lahs from Clark subject: Proposed Rule for Limiting The Use of High-Enriched Uranium (HEU) in Research Reactors (2 pages) Access, # 8505310458 PDR/F0IA/Hirscg 84-784
- 13. 07/19/84 Memo for Tse from Triner subject: CAG Review of Proposed New Rule 10 CFR 39 on Well-Logging Operations (4 pages)
Access. # 8505310608 PDR/PR/1950FR13797
- 14. 02/08/85 Memo for Bernero from Denton subject: Schedule for Resolving and Completing Generic Issue No.108 - BWR Suppression Pool Temperature Limits (1 page) Access. # 8502130351 PDR/NUREG/0933C (10 pages)
- 15. 02/19/85 Memo for Bernero from Denton subject: Schedule for Resolving and Completing Generic Issue No. 98 - CRD Accumulator Valve Leakage (1 page) Access. # 8502270116
- 16. 02/19/85 Memo for Speis from Denton subject: Schedule for Resolving and Completing Generic Issue No. 59 - Technical Specification Requirements for Plant Shutdown when Equipment for Safe Shutdown is Degraded or Inoperable (1 page)
Access. # 8502270129
- 17. 03/28/85 Memo for Bernero, Thompson, Russell and Knight from Denton subject: Schedule for Resolving and Completing Generic Issue No. 67 - Steam Generator Staff Actions (1 page)
Access. # 8504080514
- 18. 04/85 Final Report, Cost Analysis of Revisions to 10 CFR Part 50, Appendix J, Leak Tests for Primary and Secondary Containments of Light-water-cooled Nuclear Power Plants (1 page)
Access. # 8506070377 PDR/REGGD/01.XXXr (136 pages)
- 19. 04/06/85 Memo to Bernero from Denton
Subject:
Schedule for Resolving and Completing Generic Issue No. 101-BWR Water Level Redundancy (1page) Access. # 8505280518
- 20. 06/11/85 Memo for Bernero from Denton subject: Schedule for Resolving and Completing Generic Issue No. 105 - Interfacing Systems loca at BWRS (3 pages) Access. # 8506210455
- 21. Undated Recomendation for Protecting Against Failure by Brittle Fracture in Ferritic Steel Shipping Containers Greater than Four Inches Thick (1 page) Access. # 8408010155 PDR/NUREG/CR-3826R (131 pages) l
0 . j Re: F0IA-85-361 APPENDIX B (Continued)
- 22. Published A Handbook for Cost Estimating, A Method for Developing 10/84 Estimates of Cost for Generic Actions for Nuclear Power Plants (164 pages) Access. # 8411160028 PDR/NUREG
- 23. Published Replacement Energy Costs for Nuclear Electricity-Generating 10/84 Units in the United States (206 pages) Access. # 8411080457 PDR/NUREG
- 24. Published Cost Analysis for Potential Modifications to Enhance the l 07/84 Ability of a Nuclear Plant to Endure Station Blackout j (117 pages) Access # 8408080472 PDR/NUREG
- 25. Published Final Report, Contract NRC-33-84-407, Cost Analysis of 04/85 Revisions to 10 CFR Part 50, Appendix J, Leak Tests for Primary and Secondary Containments of Light-Water-Cooled Nuclear Power Plants (85 pages) Access. # 8506070377 PDR/REGGD/01.XXXR
[
i t
l 4
k 9
. - - - - ,-. _ - - - ey - -_,_.
_ __ ---,...,..y .. , ,,, , . . - r-- - . . , , ,-
Re: F0IA-85-361 APPENDIX C
- 1. 12/03/82 Transmittal letter from Andrews, Battelle, to Milstead (1 page)
Release
- a.
Attachment:
Safety Issue A-43 (11 pages) withheld /Ex.5
- 2. 02/09/83 Transmittal letter from Andrews to Milstead (1 page) Release
- a.
Attachment:
Safety Issue A-45 (12 pages) Withheld Ex.5.
- 3. 03/18/83 Transmittal letter from Andrews to Milstead (1 page) Release
- a.
Attachment:
Safety Issue A-44 (23 pages) Withheld Ex.5
- b.
Attachment:
Safety Issue A-49 (11 pages) Release.
- 4. 05/13/83 Transmittal letter from Andrews to Milstead (1 page) Release
- a.
Attachment:
Safety Issue A-46 (11 pages) Withheld Ex 5
- 5. 08/26/83 Transmittal letter from Andrews to Milstead (1 page) Release
- a.
Attachment:
Safety Issue A-47 (19 pages) Withheld Ex.5.
- 6. 04/06/84 Transmittal letter from Andrews to Milstead (1 page) Release
- a.
Attachment:
Safety Issue A-48 (15 pages) Withheld Ex.5
- 7. 04/85 Bolting Degradation Valve - Impact Analysis (40 pages) Withheld in Entirety Ex,5.