MONTHYEARML20209H5911987-01-31031 January 1987 Budget Estimates.Fiscal Years 1988-1989 ML20207J6961986-07-31031 July 1986 U.S. Nuclear Regulatory Commission 1985 Annual Report ML20153B7571986-01-31031 January 1986 Fy 1987 Budget Estimates ML20127H5871985-06-30030 June 1985 U.S. Nuclear Regulatory Commission 1984 Annual Report ML20136D6471985-03-31031 March 1985 Review of Cost Analysis Contained in Dec 1984 Draft of 'Regulatory Analysis of Recommendations Concerning Operator Shift Scheduling & Overtime in Nuclear Power Plants.' ML20136D7091985-03-26026 March 1985 Cost Analysis Group Review of Regulatory Impact Analyses of Proposed Insider Rulemaking ML20136D6701985-03-25025 March 1985 Cost Analysis Group (Cag) Comments on Regulatory Impact Analysis of Proposed Revs to 10CFR73.71, 'Reporting of Safeguards Events.' ML20136D6141985-03-11011 March 1985 Review of Cost Burden Associated W/10CFR50 Regulatory Requirements ML20136D3451985-01-31031 January 1985 Preliminary Review of Cost Analysis Contained in NUREG/CR-4025 Concerning Proposed Design Mods to Gessar NUREG/CR-4025, Preliminary Review of Cost Analysis Contained in NUREG/CR-4025 Concerning Proposed Design Mods to Gessar1985-01-31031 January 1985 Preliminary Review of Cost Analysis Contained in NUREG/CR-4025 Concerning Proposed Design Mods to Gessar ML20136D3111984-11-30030 November 1984 Plant-Specific Replacement Energy Cost Estimates for Reg Guide 1.99,Rev 2 Value-Impact Analysis ML20132D4191984-11-30030 November 1984 Plant-Specific Replacement Energy Cost Estimates for Reg Guide 1.99,Rev 2,Value-Impact Analysis ML20136D2421984-10-31031 October 1984 Review of Cost Analysis Contained in Value Impact Analysis for Rev 2 of Reg Guide 1.99 ML20132D4081984-10-31031 October 1984 Review of Cost Analysis Contained in Value Impact Analysis for Rev 2 of Reg Guide 1.99 ML20136D1241984-09-30030 September 1984 Review of Cost Analysis Contained in Regulatory Analysis for USI A-40, 'Seismic Design Criteria.' ML20136D0451984-07-31031 July 1984 Review & Comment on Regulatory Analysis for USI A-46, 'Seismic Qualification of Equipment in Operating Plants.' ML20128M2331984-07-19019 July 1984 Cost Analysis Group Review of Proposed New Rule 10CFR39 on Well Logging Operations ML20136C9571983-05-27027 May 1983 Cost Analysis Group Review of Draft Commission Paper, 'Moderation of Protection for Spent Fuel Shipments.' ML20136C5491982-12-30030 December 1982 Draft Working Paper - Replacement Power Cost ML20062A8721982-07-31031 July 1982 Us Nuclear Regulatory Commission 1981 Annual Report 1987-01-31
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEXT-SAFETY REPORT
MONTHYEARML20209H5911987-01-31031 January 1987 Budget Estimates.Fiscal Years 1988-1989 ML20206N8251986-08-31031 August 1986 Licensed Operating Reactors Status Summary Report.Data as of May 31,1986.(Gray Book I) ML20207J6961986-07-31031 July 1986 U.S. Nuclear Regulatory Commission 1985 Annual Report ML20204H2471986-07-31031 July 1986 Licensed Operating Reactors Status Summary Report.Data as of April 30,1986.(Gray Book I) ML20214X2991986-06-30030 June 1986 Licensed Operating Reactors Status Summary Report.Data as of June 30,1986.(Gray Book I) ML20199A7911986-05-31031 May 1986 Licensed Operating Reactors Status Summary Report.Data as of March 31,1986.(Gray Book I) ML20205P4421986-04-30030 April 1986 Licensed Operating Reactors Status Summary Report.Data as of February 28,1986.(Gray Book I) ML20210K0491986-03-31031 March 1986 Licensed Operating Reactors Status Summary Report.Data as of January 31,1986.(Gray Book I) ML20154M8491986-02-28028 February 1986 Licensed Operating Reactors Status Summary Report.Data as of December 31,1985.(Gray Book I) ML20141M8631986-02-28028 February 1986 Operating Reactors Licensing Actions Summary.Data as of November 30,1985.(Orange Book) ML20153B7571986-01-31031 January 1986 Fy 1987 Budget Estimates ML20138Q7181985-12-31031 December 1985 Operating Reactors Licensing Actions Summary.Data as of October 31,1985. (Orange Book) ML20141D9911985-12-31031 December 1985 Licensed Operating Reactors Status Summary Report.Data as of October 31,1985.(Gray Book I) ML20136G8271985-11-30030 November 1985 Operating Reactors Licensing Actions Summary.Data as of September 30,1985.(Orange Book) ML20138L3631985-11-30030 November 1985 Licensed Operating Reactors Status Summary Report.Data as of September 30,1985.(Gray Book I) ML20205E9021985-10-31031 October 1985 Summary Information Report.Data as of June 30,1985. (Brown Book) ML20136D3371985-10-31031 October 1985 Licensed Operating Reactors Status Summary Report.Data as of August 31,1985.(Gray Book I) ML20138P3671985-10-31031 October 1985 Operating Reactors Licensing Actions Summary.Data as of August 31,1985. (Orange Book) ML20133B9661985-09-30030 September 1985 Licensed Operating Reactors Status Summary Report.Data as of July 31,1985.(Gray Book I) ML20137V2741985-09-30030 September 1985 Operating Reactors Licensing Actions Summary.Data as of July 31,1985.(Orange Book) ML20135C9031985-08-31031 August 1985 Licensed Operating Reactors Status Summary Report.Data as of June 30,1985.(Gray Book I) ML20134F2631985-08-31031 August 1985 Operating Reactors Licensing Actions Summary.Data as of June 30,1985. (Orange Book) ML20134E1331985-07-31031 July 1985 Licensed Operating Reactors Status Summary Report.Data as of May 31,1985.(Gray Book I) ML20128L9961985-07-31031 July 1985 Operating Reactors Licensing Actions Summary.Data as of May 31,1985. (Orange Book) ML20127H5871985-06-30030 June 1985 U.S. Nuclear Regulatory Commission 1984 Annual Report ML20128F2891985-06-30030 June 1985 Licensed Operating Reactors Status Summary Report.Data as of April 30, 1985.(Gray Book I) ML20127P5151985-06-30030 June 1985 Operating Reactors Licensing Actions Summary.Data as of April 30,1985.(Orange Book) ML20128N1831985-05-31031 May 1985 Operating Reactors Licensing Actions Summary.Data as of March 31,1985. (Orange Book) ML20126F1071985-05-31031 May 1985 Licensed Operating Reactors Status Summary Report.Data as of March 31,1985.(Gray Book I) ML20136D6471985-03-31031 March 1985 Review of Cost Analysis Contained in Dec 1984 Draft of 'Regulatory Analysis of Recommendations Concerning Operator Shift Scheduling & Overtime in Nuclear Power Plants.' ML20136D7091985-03-26026 March 1985 Cost Analysis Group Review of Regulatory Impact Analyses of Proposed Insider Rulemaking ML20136D6701985-03-25025 March 1985 Cost Analysis Group (Cag) Comments on Regulatory Impact Analysis of Proposed Revs to 10CFR73.71, 'Reporting of Safeguards Events.' ML20136D6141985-03-11011 March 1985 Review of Cost Burden Associated W/10CFR50 Regulatory Requirements ML20136D3451985-01-31031 January 1985 Preliminary Review of Cost Analysis Contained in NUREG/CR-4025 Concerning Proposed Design Mods to Gessar NUREG/CR-4025, Preliminary Review of Cost Analysis Contained in NUREG/CR-4025 Concerning Proposed Design Mods to Gessar1985-01-31031 January 1985 Preliminary Review of Cost Analysis Contained in NUREG/CR-4025 Concerning Proposed Design Mods to Gessar ML20132D4191984-11-30030 November 1984 Plant-Specific Replacement Energy Cost Estimates for Reg Guide 1.99,Rev 2,Value-Impact Analysis ML20136D3111984-11-30030 November 1984 Plant-Specific Replacement Energy Cost Estimates for Reg Guide 1.99,Rev 2 Value-Impact Analysis ML20132D4081984-10-31031 October 1984 Review of Cost Analysis Contained in Value Impact Analysis for Rev 2 of Reg Guide 1.99 ML20136D2421984-10-31031 October 1984 Review of Cost Analysis Contained in Value Impact Analysis for Rev 2 of Reg Guide 1.99 ML20136D1241984-09-30030 September 1984 Review of Cost Analysis Contained in Regulatory Analysis for USI A-40, 'Seismic Design Criteria.' ML20136D0451984-07-31031 July 1984 Review & Comment on Regulatory Analysis for USI A-46, 'Seismic Qualification of Equipment in Operating Plants.' ML20128M2331984-07-19019 July 1984 Cost Analysis Group Review of Proposed New Rule 10CFR39 on Well Logging Operations ML20091N9841984-05-31031 May 1984 Licensed Operating Reactors Status Summary Report.Data as of March 31,1984.(Grey Book) ML20136C9571983-05-27027 May 1983 Cost Analysis Group Review of Draft Commission Paper, 'Moderation of Protection for Spent Fuel Shipments.' ML20136C5491982-12-30030 December 1982 Draft Working Paper - Replacement Power Cost ML20062H2491982-07-31031 July 1982 Standards Development Status Summary Report.Data as of June 1982.(Green Book) ML20062E1991982-07-31031 July 1982 Systematic Evaluation Program Status Summary Report.Data as of June 30,1982.(Buff Book) ML20062A8721982-07-31031 July 1982 Us Nuclear Regulatory Commission 1981 Annual Report ML20055B6911982-07-31031 July 1982 Regulatory Licensing Status Summary Report.Data as of June 16,1982.(Blue Book) ML20058B1121982-06-30030 June 1982 Nuclear Power PLANTS-CONSTRUCTION Status Report.Data as of March 31,1981.(Yellow Book) 1987-01-31
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
- . . . . ~ . . . . -
'J. .
(
THE COST ANALYSIS GROUP'S (CAG) COMMENTS ON THE REGULATORY IMPACT ANALYSIS OF THE PROPOSED REVISIONS T0 t
10 CFR 73 71 -- REPORTING 0F SAFEGUARDS EVENTS ared by:
COST ANALYSIS GROUP
,,0FFICE OF RESOURCE MANAGEMENT l Nuclear Regulatory mission
.1 j
PT O,
agginggggaestoaa DELLE 5-361 PDR
THE COST ANALYSIS GROUP'S (CAG) COMMENTS' ON TFE REGULATORY IMPACT ANALYSIS OF THE PROPOSED REVISIONS TO 10 CFR 73.71 -- REPORTING OF SAFEGUARDS EVEN This report is a review of the cost analysis portion of NMSS's value impact analysis of the Proposed Revisions to 10 CFR 73.71 -- Reporting of Safeguards Events.
The report Group's (CAG) is provided under the direction of the Cost Analysis Charter.
J The value impact analysis clearly.shows cost reductions to both the NRC and industry resulting from the proposed revisions. Our review concludes that no major changes are required. There are, however, some reccmmendations we offer which'may be of use, even to future value impact analyses.
First, there exist two handbooks which should be followed when preparing a value impact analysis. One is "A Handbook for Value-Impact Assessment,"
NUREG/CR-3568, and the other is "A Handbook for Cost Estimating," NUREG/CR-t 3971. Second, the analysis assumes there exist 48 sites. According to i
j " Licensed Operating Reactors," NUREG-0020, Vol. 8, No.12, December 1984, j there are presently 85 operating power reactors on 56 sites. We understand that your analysis of total industry cost is dependent upon the total number of industry reports made to the NRC, not the number of sites, hence this j
modification will have no change on your " bottom-11ne" estimate. Fourth, in confirming your calculations, we were unable to replicate one estimate. On
'{
Page 3, under Loc Entries, you report the Industry cost / year to be $17.4K. We
- calculate the value to be $18K, but this has no significant impact on your results. Last, while paperwork cost burden is adequately addressed in the cost analysis, a specific statement should be. included under 2. Statutory Considerations.