MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp ML20137B9371997-03-18018 March 1997 Proposed Tech Specs,Revising TS Section 5.3.1,fuel Assemblies to Allow Use of Alternate Zr-based Fuel Cladding Matl ZIRLO ML20137B9141997-03-18018 March 1997 Proposed Tech Specs,Revising TS SR 4.5.2.c to Clarify When Containment Entry Visual Insp Is Required ML20134Q0811997-02-17017 February 1997 Proposed Tech Specs,Revising TS 1.7, Containment Integrity, TS 3/4.6.1, Containment Integrity & TS 3/4.6.3, Containment Isolation Valves 1999-09-02
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20207J9621998-12-18018 December 1998 Rev 1 to TRM for Wolf Creek Generating Station,Unit 1 ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20195E7671998-11-10010 November 1998 Rev 0 to EPP 01-2.4, Core Damage Assessment Guidance ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20138F3371997-04-30030 April 1997 Rev 0 to Offsite Dose Calculation Manual ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp 1999-09-02
[Table view] |
Text
.
' Attachment IV to ET 92 0122 Page 1 of 6 ATTACIMENT IV PROPOSED TECIINICAL SPECIFICATION CilANGES i
9206150376 920611 PDR ADOCK 05000482 P PDR
.. - - - -- - - - . - ~ . _ - ~ . . . . - . - - . . - . - - - . -
Attechment IV to ET 92-0122 Page 2 of 6
, LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE BIOUIREMENTS SECTIOn EfflE TABLE 3.4-1 REACTOR COOLANT SYSTEM PRESSURE ISOLATION VALVES........................................... 3/4 4-21 3/4.4.7 CHEMISTRY........................................... 3/4 4-22 TABLE 3.4-2 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS............. 3/4 4-23 TABLE 4 4-3 REACTOR COOLANT SYSTEM CHEMISTRY SURVEILLANCE REQUIREMENTS.................................... 3/4 4-24 3/4.4.8 SPECIFIC ACTIVITY................................... 3/4 4-25 FIGURE 3.4-1 DOSE EQUIVALENT I-131 REACTOR COOLANT SPECIFIC ACTIVITY LIMIT VERSUS PERCENT OF RATED THERMAL POWER WITH THE REACTOR COOLANT SPECIFIC ACTIVITY >
1 pCi/ GRAM DOSE EQUIVALENT I-131............... 3/4 4-27 TABLE 4.4-4 REACTOR COOLANT SPECIFIC ACTIVITY SAMPLE AND ANALYSIS PROGRAM................................ 3/4 4-28 3/4.4.9 PRESSURE / TEMPERATURE LIMITS Reactor Coolant System.......................... 3/4 4-29 FIGURE 3.4-2 REACTOR COOLANT SYSTEM HEATUP LIMITATIONS APPLICABLE UP TO 7 EFPY......................... 3/4 4-30 FIGURE 3.4-3 REACTOR COOLANT SYSTEM COOLDOWN LIMITATIONS APPLICABLE UP TO 7 ETPY......................... 3/4 4-31
-TABLE 4.4-5 hisAePE+n VC000fr MA9sMAir-suftveEhANC" DELE ED PnOO n1J' '-lMu&RAWMr-seHBDULC . . . . . . . . . . . . . . . . . . . . p/4 4 32 Pressurizer...................................... 3/4 4-33
. Overpressure Protection Systems................. 3/4 4-34 FIGURE 3,4-4 MAXIMUM ALLOWED PORV SETPOINT FOR THE COLD OVERPRESSURE MITIGATION SYSTEM.................. 3/4 4-36 3/4.4.10 STRUCTURAL INTEGRITY................................ 3/4 4-37
.3/4.4.11 REACTOR COOLANk' SYSTEM VENTS........................ 3/4 4-38 3/4.5 EMERGENCY COLE COOLING SYSTEMS 3/4.5.1 ACCUMULATORS........................................ 3/4 5-1 WOLF CREEK - UNIT 1 VIII Amendment No. 40
Attachm2nt IV to ET 92-0122 Page 3 of 6
, 3/4.4.9 PRESSURE / TEMPERATURE LIMITS PEACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION 3.4.9.1 The Reactor Coolant System (except the pressurizer) temperature and pressure shall be limited in accordance with the limit lines shown on rigures 3.4-2 and 3.4-3 during heatup, cooldown, criticality, and inservice leak and hydrostatic testing with:
- a. A maximum heatup of 60'T in any 1-hour period for indicated T avg less than or equal to 200'r,
- b. A maximum heatup of 100'r in any 1-hour period for indicated Ta vg greater to 200'T,
- c. A maximum cooldown of 100'T in any 1-hour period, and
- c. A maximum temperature change of less than or equal to lo'r in any 1-hour period during inservice hydrostatic and leak testing operations above the heatup and cooldown limit curves.
APPLICABILITY - At all times.
ACTION:
With any of the above limits exceeded, restore the temperature and/or pressure to within the limit within 30 minutes; perfore an engineering evaluation to determine the effects of the out-of-limit condition on the structural integrity of the Reactor Coolant System; determine that the Reactor Coolant System remains acceptable for continued operation or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce the RCS T av and pressure to less than 200'T and 500peig,respectively,withinthefollowing30 hours.
SURVEILLANCE REOUIREMENTS 4.4.9.1.1 The Reactor Coolant System temperature and pressure shall be determined to be within the limits at least once per 30 minutes during system heatup, cooldown, and inservice leak and hydrostatic testing operations.
4.4.9.1.2 The reactor vessel material irradiation surveillance specimens shall be removed and examined, to deterinine _c_hAnge rial pronerttes,
_as required by 10 Crk Part 50, Appendix H@Hr-% aarr_ a o fit _ d:3 mfd QgdQ( J_.L5') - The results of these examinations shall be used to update - -
Figures 3.4-2, 3.4-3, and 3.4-4.
WOLF CREEK - UNIT 1 3/4 4-29 Amendment No. 40 is ,_4.4-5
Attachinent IV to ET 92-0122 Page 4.of 6 i l
.l
.- REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM - WITHDRAWAL SCHEDULE !
CAPSULE VESSEL LEAD !
NUMBER LOCATIOl{ FACTOR WITHDRAkAL TIME fEFPY) !
-U 58.5' 4.00 1st Refueling l 241' 3.69 5 ;
V 61' 3.69 9 !
i X 238.5' 4.00 15 i W 121.5' 4.00 Standby -
!: 2 301.5' 4.00 standby i
i e
a h
6 L
F L
T I
WOLF CREEK - UNIT 1 3/4.4-32
Attachmsnt IV to ET 92-0122 Page 5 of 6 R'EACTOR COOLANT SYSTEM PASES
[EESSURE/ TEMPERATURE LIMITS (Continued) l 1
values of ART HDT determined in this manner may be used until the results of the next scheduled capsule f rom the material surveillance program, evaluated
.. cording to ASTM E185, are available. Capsules will be removed in a ce vi to of ASg_L anQ0_ H.
~__r w..m. y 1,- An a s u m uw. , ~ u The ead ctor represents the Ielationship between the fast neutron ilux density at the location of the capsule and the inner wall of the reactor vessel. Therefore, the results obtained f rem the surveillance specimens can be used to predict the future radiation damage to the reactor vessel material by using the lead f actor and the withdrawal time of the capsule. The heatup and cooldown curves must be recalculated when the ART NDT determined from the surveillance capsule exceeds the calculated ART NDT for the equivalent capsule radiation exposure.
Allowable pressure-temperature relationships for various heatup and cooldown rates are calculated using methods derived from Appendix G in Section III of the ASME Boiler and Pressure Veseel Code as required by Appendix G to 10 CFR Part 50.
The general method for calculating heatup and cooldown limit curves is based upon the principles of the linear elastic fracture mechanics (LEFM) technology.
In the calculation procedureo a semi-elliptical surface defect with a depth of one-quarter of the wall thickness, T, and a length of 3/2T is assumed to exist at the inside of the vessel wall as well as at the outside of the vessel wall.
The dimensions of this postulated crack, referred to in Appendix G of ASME section III as the reference flav, amply exceed the current capabilities of inservice inspection techniques. Therefore, the reactor operation limit curves developed for this ref erence crack are conservative and provide sufficient safety margins for protection against nonductile failure. To assure that the radiation embrittlement effects are accounted for in the calculation of the limit curves, the most limiting value of the nil-ductility reference temperature,-RTNDT, is used and this includes the radiation-induced shift, ART NDT, corresponding to the end of the period for which heatup and cooldown curves are generated.
The ASME approach for calculating the allowable limit curves for various heatup and cooldown rates specifies that the total stress intensity factor, Kg, for the combined thermal and pressure stresses at any time during heatup or cooldown cannot be greater than the reference strece intensity factor, KIRe for the metal temperature at that time. K is obtained from the reference f racture toughness curve, definedinAppenbfxGtotheASMECode. The Kgg curve is given by the equations KIR = 26.78 + 1.223 exp [0.0145(T-RTHDT
WOLF CREEK - UNIT I B 3/4 4-8 Amendment No. 40 REACTOR COOLANT SYSTEM
i Attachm2nt IV to ET 92-0122 !
Page 6 of 6 I BASES i
i COLD OVERPRESSURE (Continued)
RCP eliminates the possibility of a 50*r difference existing between indicated and actual RCS temperature as a result of heat transport effects. Considering instrument uncertainties only, an indicated RCS temperature of 350*F is suffi-ciently high to allow full RCS pressurization in accordance with Appendix G limitations. Should an overpressure event occur in these conditions, the pres-surizer safety valves provide acceptable and redundant overpressure protection.
The Maximum Allowed PORV Setpoint for the Cold overpressure Hitigation System will be updated based on the results of examinations of reactor vessel rt xH 3/4.4.10 STRUCTURAL INTEGRITY The inservice inspection and testing programs for ASME Code Class 1, 2, and 3 components ensure that the structural integrity and operational readiness of these components will be maintained at an acceptable Jevel throughout the life of the plant. These programs are in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR Part 50.55a(g) except where specific written relief has been granted by the Commission pursuant to 10 CFR Part 50.55a(g)(6)(1).
Components of the Reactor Coolant System were designed to provide access to permit inservice inspections in accordance with Section XI of the ASME Boiler and Pressure Vessel Code, 1974 Edition and Addenda through Summer 1975.
3/4.4.11 REACTOR COOLANT SYSTEM VENTS Reactor Coolant System vents are provided to exhaust noncondensible gases and/or steam from the Reactor Coolant System that could inhibit natural circulation core cooling. The OPERABILITY of a reactor vessel head vent path ensures the capability exists to perform this function.
The valve redundancy of the Reactor Coolant System vent paths serves to minindre the probability of inadvertent or irreversible actuation while ensuring that a single failure vent valve power supply or control system does not prevent isolation of the vent path.
The function, capabilities, and testing requirements of the Reactor Coolant System _ vents are consistent with the requirements of Item II.B.1 of NUREG-0737, " Clarification of THI Action Plan Requirements," November 1980.
WOFL CREEK - UNIT 1 B 3/4 4-15 Amendment No. 40 1
-