ML20112H455

From kanterella
Revision as of 18:07, 17 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Proprietary Northrop Triga Reactor Facility Environ Rept in Support of Decommissioning Plan & Proprietary Northrop Triga Reactor Facility Decommissioning Plan. Reactor Shut Down on 841221.Repts Withheld
ML20112H455
Person / Time
Site: 05000187
Issue date: 01/14/1985
From: Benveniste J
NORTHROP RESEARCH & TECHNICAL CENTER
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19269A912 List:
References
301-85-JB-006, 301-85-JB-6, NUDOCS 8501170153
Download: ML20112H455 (1)


Text

l 301-85-J8-006

~

NORTHROP 14 January 1985

[0-/T7 Mr. Harold Denton USNRC Mail Stop P-428 Director Office of Nuclear Reactor Regulation Washington, DC 20555

Dear. Mr. Denton:

The Northrop Corporation has decided to decommission its TRIGA research reactor. Accordingly, a decommissioning plan and an environmental report are herewith submitted for your approval.

The reactor was shut down December 21, 1984 and all fuel rods have been removed from the core and placed in temporary storage.

Our plan is to keep them there until defueling and shipping operations begin on or about April 1,1985.

Because we no longer have a critical assembly, we respeufully request relief from those requirements derived from the technical specifications relevant to an operating reactor. All other requirements, particularly those relevant to the packaging and shipping of fuel, will be faithfully met.

Sincerely yours,

/

(

. Benveniste, NRTC Chief Scientist A

t

. opp 4 f.'A/tfd[#41 asic 5 8501170153 850114 ~

  • MTIS PDR ADOCK 05000187' P PDR Northrop Co@ oration . Ncrthrop Research and Tesnu!syv Ce nw One flesearch Park, Paios Verdrs Penmsula. Cahfornia 00274
  • Telephone (2133 377-4811
  1. % )