ML20113H105
From kanterella
ML20113H105 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 11/30/1991 |
From: | Gore B, Lloyd R, Moffitt N Battelle Memorial Institute, PACIFIC NORTHWEST NATION |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML20113H085 | List: |
References | |
CON-FIN-L-1310 NUDOCS 9207070372 | |
Download: ML20113H105 (26) | |
Similar Documents at Summer | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20140H5791996-12-10010 December 1996
[Table view]Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station ML20116A4841992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant ML20113H1051991-11-30030 November 1991 Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant ML20091K1001991-11-19019 November 1991 Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation ML20082P8291991-06-30030 June 1991 Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept ML20151K7891988-04-30030 April 1988 Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept ML20195J1521987-12-31031 December 1987 Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept ML20235L9151987-06-30030 June 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Summer, Informal Rept ML20245B5391987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept ML20214S0391987-03-31031 March 1987 Analysis of Pressurizer Safety Valve Discharge Piping of VC Summer Nuclear Power Station,Unit 1, Informal Rept ML20245A4321987-03-10010 March 1987 Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20211G7431986-05-31031 May 1986 Conformance to Reg Guide 1.97,VC Summer Nuclear Station, Informal Rept ML20205F0541985-10-29029 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based On...Atws Events),Item 1.2, `Post-Trip Review,' Data & Info Capabilities for VC Summer Nuclear Station Unit 1 ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML20078D0731983-08-31031 August 1983 Control of Heavy Loads at Nuclear Power Plants,Vc Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept ML20127D7381983-08-31031 August 1983 Rev 1 to Control of Heavy Loads at Nuclear Power Plants, VC Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept ML20087Q0851983-07-13013 July 1983 Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept ML20028B4921982-10-31031 October 1982 Ser,Inservice Testing Program,Vc Summer Nuclear Station, Interim Rept ML20054E8961982-03-31031 March 1982 Control of Heavy Loads at Nuclear Power Plants,Virgil C Summer Nuclear Station,Unit 1, Draft ML20009A0861981-06-30030 June 1981 V.C. Summer Nuclear Station Unit 1 Emergency Feedwater System Reliability Study Evaluation ML20005B1721981-05-31031 May 1981 Environ Statements Project, Monthly Progress Rept for May 1981 ML19347E9251981-03-31031 March 1981 Environ Statements Project, Progress Rept for Mar 1981 ML20003F9571981-02-28028 February 1981 Environ Statements Project, Monthly Progress Rept for Feb 1981 ML19341C6981980-12-31031 December 1980 Environ Statements Project, Monthly Progress Rept for Dec 1980 ML19294B2881979-12-31031 December 1979 Environ Statements Project, Monthly Progress Rept for Dec 1979 1996-12-10 Category:QUICK LOOK MONTHYEARML20140H5791996-12-10010 December 1996
[Table view]Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station ML20116A4841992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant ML20113H1051991-11-30030 November 1991 Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant ML20091K1001991-11-19019 November 1991 Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation ML20082P8291991-06-30030 June 1991 Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept ML20151K7891988-04-30030 April 1988 Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept ML20195J1521987-12-31031 December 1987 Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept ML20235L9151987-06-30030 June 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Summer, Informal Rept ML20245B5391987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept ML20214S0391987-03-31031 March 1987 Analysis of Pressurizer Safety Valve Discharge Piping of VC Summer Nuclear Power Station,Unit 1, Informal Rept ML20245A4321987-03-10010 March 1987 Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20211G7431986-05-31031 May 1986 Conformance to Reg Guide 1.97,VC Summer Nuclear Station, Informal Rept ML20205F0541985-10-29029 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based On...Atws Events),Item 1.2, `Post-Trip Review,' Data & Info Capabilities for VC Summer Nuclear Station Unit 1 ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML20078D0731983-08-31031 August 1983 Control of Heavy Loads at Nuclear Power Plants,Vc Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept ML20127D7381983-08-31031 August 1983 Rev 1 to Control of Heavy Loads at Nuclear Power Plants, VC Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept ML20087Q0851983-07-13013 July 1983 Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept ML20028B4921982-10-31031 October 1982 Ser,Inservice Testing Program,Vc Summer Nuclear Station, Interim Rept ML20054E8961982-03-31031 March 1982 Control of Heavy Loads at Nuclear Power Plants,Virgil C Summer Nuclear Station,Unit 1, Draft ML20009A0861981-06-30030 June 1981 V.C. Summer Nuclear Station Unit 1 Emergency Feedwater System Reliability Study Evaluation ML20005B1721981-05-31031 May 1981 Environ Statements Project, Monthly Progress Rept for May 1981 ML19347E9251981-03-31031 March 1981 Environ Statements Project, Progress Rept for Mar 1981 ML20003F9571981-02-28028 February 1981 Environ Statements Project, Monthly Progress Rept for Feb 1981 ML19341C6981980-12-31031 December 1980 Environ Statements Project, Monthly Progress Rept for Dec 1980 ML19294B2881979-12-31031 December 1979 Environ Statements Project, Monthly Progress Rept for Dec 1979 1996-12-10 Category:ETC. (PERIODIC MONTHYEARML20140H5791996-12-10010 December 1996
[Table view]Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station ML20116A4841992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant ML20113H1051991-11-30030 November 1991 Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant ML20091K1001991-11-19019 November 1991 Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation ML20082P8291991-06-30030 June 1991 Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept ML20151K7891988-04-30030 April 1988 Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept ML20195J1521987-12-31031 December 1987 Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept ML20235L9151987-06-30030 June 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Summer, Informal Rept ML20245B5391987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept ML20214S0391987-03-31031 March 1987 Analysis of Pressurizer Safety Valve Discharge Piping of VC Summer Nuclear Power Station,Unit 1, Informal Rept ML20245A4321987-03-10010 March 1987 Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20211G7431986-05-31031 May 1986 Conformance to Reg Guide 1.97,VC Summer Nuclear Station, Informal Rept ML20205F0541985-10-29029 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based On...Atws Events),Item 1.2, `Post-Trip Review,' Data & Info Capabilities for VC Summer Nuclear Station Unit 1 ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML20078D0731983-08-31031 August 1983 Control of Heavy Loads at Nuclear Power Plants,Vc Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept ML20127D7381983-08-31031 August 1983 Rev 1 to Control of Heavy Loads at Nuclear Power Plants, VC Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept ML20087Q0851983-07-13013 July 1983 Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept ML20028B4921982-10-31031 October 1982 Ser,Inservice Testing Program,Vc Summer Nuclear Station, Interim Rept ML20054E8961982-03-31031 March 1982 Control of Heavy Loads at Nuclear Power Plants,Virgil C Summer Nuclear Station,Unit 1, Draft ML20009A0861981-06-30030 June 1981 V.C. Summer Nuclear Station Unit 1 Emergency Feedwater System Reliability Study Evaluation ML20005B1721981-05-31031 May 1981 Environ Statements Project, Monthly Progress Rept for May 1981 ML19347E9251981-03-31031 March 1981 Environ Statements Project, Progress Rept for Mar 1981 ML20003F9571981-02-28028 February 1981 Environ Statements Project, Monthly Progress Rept for Feb 1981 ML19341C6981980-12-31031 December 1980 Environ Statements Project, Monthly Progress Rept for Dec 1980 ML19294B2881979-12-31031 December 1979 Environ Statements Project, Monthly Progress Rept for Dec 1979 1996-12-10 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20140H5791996-12-10010 December 1996
[Table view]Technical Evaluation Rept of IPE Submittal & RAI Responses for VC Summer Nuclear Station ML20116A4841992-09-30030 September 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the Virgil C. Summer Nuclear Power Plant ML20113H1051991-11-30030 November 1991 Auxiliary Feedwater System Risk-Based Insp Guide for Virgil Summer Nuclear Power Plant ML20091K1001991-11-19019 November 1991 Final Technical Evaluation Rept Virgil C Summer Station Blackout Evaluation ML20082P8291991-06-30030 June 1991 Rev 2 to Pump & Valve Inservice Testing Program,Vc Summer Nuclear Station, Technical Evaluation Rept ML20151K7891988-04-30030 April 1988 Conformance to Reg Guide 1.97:Summer, Technical Evaluation Rept ML20195J1521987-12-31031 December 1987 Rev 1 to Pump & Valve Inservice Testing Program, VC Summer Nuclear Station, Technical Evaluation Rept ML20235L9151987-06-30030 June 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Summer, Informal Rept ML20245B5391987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept ML20214S0391987-03-31031 March 1987 Analysis of Pressurizer Safety Valve Discharge Piping of VC Summer Nuclear Power Station,Unit 1, Informal Rept ML20245A4321987-03-10010 March 1987 Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20211G7431986-05-31031 May 1986 Conformance to Reg Guide 1.97,VC Summer Nuclear Station, Informal Rept ML20205F0541985-10-29029 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based On...Atws Events),Item 1.2, `Post-Trip Review,' Data & Info Capabilities for VC Summer Nuclear Station Unit 1 ML20138J9491985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Farley Units 1 & 2,Turkey Point Units 3 & 4,Robinson Unit 2 & Summer Unit 1 ML20078D0731983-08-31031 August 1983 Control of Heavy Loads at Nuclear Power Plants,Vc Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept ML20127D7381983-08-31031 August 1983 Rev 1 to Control of Heavy Loads at Nuclear Power Plants, VC Summer Nuclear Station,Unit 1 (Phase I), Technical Evaluation Rept ML20087Q0851983-07-13013 July 1983 Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept ML20028B4921982-10-31031 October 1982 Ser,Inservice Testing Program,Vc Summer Nuclear Station, Interim Rept ML20054E8961982-03-31031 March 1982 Control of Heavy Loads at Nuclear Power Plants,Virgil C Summer Nuclear Station,Unit 1, Draft ML20009A0861981-06-30030 June 1981 V.C. Summer Nuclear Station Unit 1 Emergency Feedwater System Reliability Study Evaluation ML20005B1721981-05-31031 May 1981 Environ Statements Project, Monthly Progress Rept for May 1981 ML19347E9251981-03-31031 March 1981 Environ Statements Project, Progress Rept for Mar 1981 ML20003F9571981-02-28028 February 1981 Environ Statements Project, Monthly Progress Rept for Feb 1981 ML19339D0471981-02-12012 February 1981 Power Sys Coordination & Integration Agreement Between Sc Public Svc Authority & Central Electric Power Cooperative,Inc. ML19341C6981980-12-31031 December 1980 Environ Statements Project, Monthly Progress Rept for Dec 1980 ML19294B2881979-12-31031 December 1979 Environ Statements Project, Monthly Progress Rept for Dec 1979 1996-12-10 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20113H105&oldid=2810690"