Monthly Operating Rept for Oct 1992 for Wolf Creek Generating Station
ML20116K774
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/31/1992
From: Maynard O, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-92-0137, WO-92-137, NUDOCS 9211170368
Download: ML20116K774 (7)


Text

NUCLEAR OPERATING CORPORATION November 11, 1992 WO 92-0137 U. S. Nuclear Regulatory Conctission ATTN: Docurnent Control Desk Mail Station P1-137 Washington, D. C. 20555 Subject Docket No. 50-482: October, 1992, Monthly Operating Report Gentlemen i

Attached is the october, 1992, Monthly Operating Report for Wolf Creek Generating Station. This submittal la being made in accordance with the requirements of Technical Specification 6.9.1.8, _

Very truly yours, A i 10j_ % ,>+ v/

Otto L. Maynaro

}

Vice President

-Plant Operations ,

OIR/jad Attachment cct A. T. 1owell (NRC), w/a J. L. Milhoan (NRC), w/a G. A. Pick (NRC), w/a

  • W. D. Beckley (NRC), w/a t

17000G  :

PO. % 411/ Ikwhngton,'kS em?9 / Prvme: (316) 364 8831

. bit abo JO PDR 482 w

__._-R..__._ _ . _ . . _ _ . _ _ _ . , _ , _ .

_. . . . _ _ .. -. . _ . . , . ~ . _ . _ _ _ _ _ . . _ . . _ _ _ . _ . - _ _ . _ . - . . . _ _ _ . _ _ . . . . - _ . . _ . , . _ . _

I

c. ,

..

. .1 i

?

VOLF CREEK NUCLEAR OPERATING CORPORATION l WOLF CREEK GENERATING STATION HONTHLY OPERATING REPORT MONT!!: _ October YEAR: 1992 f

Docket No.: 50-482 -

'l

?acility Operating License-No.: NPF Report No. 92  ;

t

?

b t

e h

Prepared.by:

1 Merlin G. Williams

.i

-+

9

- ',.,s..'d........,'n N- An ...$, .m'w.+,. ,..,,...,,-,-,.G.,,...,

.,..,-n.~.',.

, , .,,,,e, +;-,.w.-,.,,. , , n.L , - . , , ,r, c,',',

, w,

+;r.s. , 4, ,wi

r

.e Attachment to VO 92-0137  ;

i SUltiARY  !

1 The following report highlights the operating experience of Wolf Creek i Generating Station for the month of October. 1992. This report is being j provided pursuant to Technical Specification 6.9.1.8. i i

I.

SUMMARY

OF OPERATINC EXPERIENCE The unit operated at or near 1002 power throughout the month of October.

11. MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES No major safety related maintenance activities were performed during the ,

month of October.

?

1 l

l L.

r l'

Wolf Creek Generating Station-Monthly' Operating Report ~

October ~1992i '

Page 1,of 5"-

l.

, , . . - , - . , . u , u ..--. ,~,. ; .., _...;,-.-..

. - _ . ._._...,u~-~u..._-.. - , . , . . _ . . - - . .

p: p. ,

~ . - . . -

. _ - . ~ _ - - - - - - . . - . - . - .

(: r
d. ' / h ft- w:.  ? cu sQ 92-0137 h !. , e' d' l OPERATING DATA REPORT DOCKET NO. 50 482 WOLF CRE7.K GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 11-01-92 COMPLETED BY M. Williams'  ;

TELEPHONE 316-364-8831 OPERATING STATUS

1. Reporting Peclod: October. 1992 Gross Hours in Reporting Period: 745
2. Currently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (MWe-Net): 1131  !

i Design Electrical Rating (MWe-Net): 1170

3. Power Level to Vhich Restricted (If Any)(MWe-Net): N/A
4. Reasons for restriction (If Any): N/A This Month Yr. to Date Cumulative -
5. Number of Hours Reactor was Critical 745.0 6.174.1 49.864.2
6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8 ,
7. Hours Generator on Line 745.0 6.106.5 49.218.7  ;
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2.534.881 20.603.892 160.697.483
10. Gross Electrical Energy Generated (HWH) 889.513 7.190.754, $5.904.260 l'. . Net Electrical Energy Generated (HWH) 855.716 6.868.638 -53.324.109'-

-12, Reactor Service Factor 100.0 84.3 79.4

13. Reactos Availability Factor 100.0- 84.3 8'0.0
14. Unit Service Factor 100.0 -83.4 78.4

-15. Unit Availability Factor -100.0 83.4 78.4

.16. Unit Capacity Factor (Uning MDC) 101.6 83.0 75.1

-17. -Unit Capacity Factor (Using Design MWe) 98.2 80.2- 72.6 18.-~ Unit Forced Outage Rate 0.0 16.6 0.5

19. - Shutdowns = Scheduled Over Next 6 Months-(Type. Date, and Duration-of each):- Refueling

-Outage on March 4, 1993.for 65 days.

20. If Shut Down at_End of Report Period, Estimated-Date of-Startups- -N/A .

Wolf, Creek Generating Station '

Monthly:Operat.ing. Report.

October 1992 Page 2-~off5-

' , a , _ . . .._.2,, _ , , _ _ . . _ . . - - . . . _ _._ . . - - - _ . .

Attoehment to WO 92-0137 AVERAGE DAILY U!IIT POWER LEVEL DOCKET 110. 50-482 VOLF CREEK GE11ERATIl4G STATIO!i WOLF CREEK IJUCLEAR OPERATI!JG CORPORATIO!1 DATE 11-01-92 COMPLETED BY M. Villiams TELEPfl0!iE 316-364-8831 M0!JTil October. 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

( MWe-!Je t ) (MWe-fie t )

1 1146 17 1149 2 1148 18 1149 3 1148 19 1145 4 1148 20 1144 5 1148 21 1150 6 1148 22 1149 7 1148 23 1149 8 1150 24 1149 9 1150 25 1149*

10 1150 26 1149 11 1150 27 1149 12 1145 28 1149 13 1149 29 1149 14 1144 30 1149 15 1149 31 1150 16 1149

~

'h/

  • Adjusted for time change .hr Volf Creek Generating Station Monthly Operating Report October 1992 Page 3 of 5

' Attachment to VO 92 0137 - -

UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET N. 50 482 <

WCLF CREEK GENERAT4!G STATION WOLF CREEK NUCLEAR CPERATING CORPCRATION DATE 11-01-92 CCMPLETED BY M. Williams REPORT MONTH October, 1992 TELEPHONE 316-354-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONSICOPMENTS No Date S:' SCHEDULED (HOURS) (1) OR REDUCING POWER (2) t SIR 9fARY: The unit operated at or near 100! power throughout the month of October.

1) , REASON: A: EQUIPMENT FAILURE (r_iPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCPAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCPAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTINUED
5. REDUCED LOAD
9. OTHER Wolf Creek Generating Station Monthly Operating Report October 1992 Page 4 of 5

.- . nj Atta* chm @nt to VO- 92-0137 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK CENERATING STATION UNIT NO. 1 MONTH October. 1992 SUM 1ARY OF OPERATING EXPERIENCE Listed below Jn chronological sequence is a summary of operating experiences for this month which required load reduction or resulted in significant non-load related-incidents.

DATE TIME EVENT.

October l. 1992 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 1002 power.

October 31. 1992 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100Z power.

Wolf: Creek Generating; Station

Monthly Operating Report
0ctober 1992
Page 5 of-5: