ML20086L339

From kanterella
Revision as of 12:38, 13 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for June 1995 for Wolf Creek Station
ML20086L339
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/30/1995
From: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-95-0112, WO-95-112, NUDOCS 9507210151
Download: ML20086L339 (7)


Text

.

, . I l

s l

~

WQLF CREEK NUCLEAR OPERATING CORPORATION l

I Otto L. Maynard VK.e Presdent Plant Operatons l

July 11, 1995 l i

WO 95-0112 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 1 Mail Station 91-137 Washington, D. C. 20555 l

Subject:

Docket No. 50-482: June, 1995, Monthly l Operating Report I

Gentlemen:

l Attached is the June, 1995, Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accordance with the requirements.of Technical Specification 6.9.1.8. l i

i J

Very truly yours, l l

1 1

Otto L. Maynard OLM/jra Attachment l

1 cc: L. J. Callan (NRC), w/a D. F. Kirsch (NRC) , w/a J. F. Ringwald (NRC), w/a J. C. Stone (NRC), w/a 9507210151 950630 PDR R ADOCK 05000482 PDR

    • O P O Dox 411/ Uunington, KS 66839 / Phone. (316) 3644831 An Equa! Opportunity Employer MT/HCNET

((A git

/

i Attachment to WO 95-0112 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH: June YEAR: 1995 Docket No.: 50-482  :

Facility Operating License No.- NPF-42 Report No. 124 l

l 1

i l

I i

i i I

Wolf Creek Generating Station Monthly Operating Report June, 1995 Page 1 of 6

. ,. _ . ~ . . . . - . - . - . - . _ .. . . . ~

Attachment 'to WO 95-0112 l

l

SUMMARY

l The following report highlights the operating experience of Wolf Creek Generating Station for the month of June, 1995. This report is being provided pursuant to Technical Specification 6.9.1.8.

I.

SUMMARY

OF OPERATING EXPERIENCE The unit operated at or near 100% power, Mode 1, from June 1, 1995, through June 17, 1995.

On June 18 at 2025, the "C" Circulating Water Pump tripped, and the Reactor subsequently stabilized at 65% power, Mode 1. The pump trip was caused by the Field Monitor Relay actuation due to a burned spot on the Field Potentiometer. On June 18, at 2115, the unit commenced increasing Reactor power, which was stabilized at 74% for troubleshooting.

Power increase commenced again on June 19, at 1201, and the plant returned to 100% power, Mode 1, at 1527 on June 19, 1995.

The unit continued to operate at or near 100% power, Mode 1, until June 28, 1995, at 0237, when power was reduced to 71%, Mode 1, in preparation for removing "B" Circulating Water Pump from service for maintenance. Power was returned to 100% power, Mode 1, at 1650 on June 28, 1995.

Power remained at or near 100% power, Mode 1, through the remainder of June, 1995.

II. MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES r

NONE  :

l l

l 1

)

Wolf Creek Generating Station Monthly Operating Report June, 1995 Page 2 of 6 I

. I Attachment'to WO 95-0112

, . OPERATING DATA REPORT DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 7-6-95 1 TELEPHONE 316-364-8831 1 OPERATING STATUS

1. Reporting Period: June, 1995 Gross Hours in Reporting Period 720
2. Currently Authorized Power Level (MWt): 3565 Max. Depend, Capacity (MWe-Net) : 1166 Design Electrical Rating (MWe-Ne t) : 1170
3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A
4. Reasons for Restriction (If Any) : N/A This Month Yr. to Date Cumulative
5. Number of Hours Reactor was Critical 720 4,231.7 70,199.8
6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8
7. Hours Generator on Line 720 4,208.1 69,362.7
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
9. Gross Thermal Energy Generated (MWh) 2,524,794 14,476,797 229,779,115
10. Gross Electrical Energy Generated (MWh) 871,485 5,115,507 79,879,722
11. Net Electrical Energy Generated (MWh) 834,180 4,901,953 76,276,627
12. Reactor Service Factor 100.0% 97.4% 81.5%
13. Reactor Availability Factor 100.0% 97.4% 81.9%
14. Unit Service Factor 100.0% 96.9% 80.6%
15. Unit Availability Factor 100.0% 96.9% 80.6%
16. Unit Capacity Factor (Using MDC) 99.4% 96.8% 78.1%
17. Unit Capacity Factor (Using Uesign MWe) 99.0% 96.5% 75.7%
18. Unit Forced Outage Rate 0.0% 3.1% 5.0%
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):

No outages are scheduled at this time.

20. If Shut Down at End of b : art Period, Estimate Date of Startup: N/A Wolf Creek Generating Station l

Monthly Operating Report June, 1995 Page 3 of 6 l

. Attachment to WO 95-0112

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 7-6-95 TELEPHONE 316-364-8831 MONTH June, .995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1178 17 1172 2 1170 18 1118 3 1173 19 992 4 1174 20 1168 5 1174 21 1167  ;

6 1173 22 1166 7 1172 23 1160 8 1165 24 1170 9 1169 25 1172 10 1176 26 1174 11 1177 27 1173 12 1177 28 1018 13 1176 29 1171 14 1174 30 1173 no.

15 1165 31 N/A 16 1172 >

I l

l

)

Wolf Creek Generating Station l Monthly Operating Report June, 1995 Page'4 of 6 I l

mm

, . . to WO 95-0112 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.~$0'-482 WOLF CREEK GENERATING STATION ^

WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 7-6-95 TELEPHONE 316-364-BB31 Type METHOD OF SHIRTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /CCMMENTS No Date S: SCHEDULED (Hours) (1) OR REDUCING POWER (2) 1 6/18/95 F 19 A 4 N/A 2 6/28/95 S 14 B 4 N/A

SUMMARY

The unit operated at or near 100% power Mode 1, from June 1, 1995, through June 17, 1995. On June 18 at 2025, the *C" Circulating water Pump tripped, and the Reactor subsequently stabilized at 65% power, Mode 1. The pump trip was caused by the Field Monitor Relay actuation due to a burned spot on the Field Potentiometer. On June 18 at 2115, the unit commenced increasing Reactor power, which was stabilized at 74% for troubleshooting. Power increase commenced again on June 19, at 1201, and the plant returned to 100% power, Mode 1, at 1527 on June 19, 1995. The unit continued to operate at or near 100% power, Mode 1, until June 28, 1995, at 0237, when power was reduced to 71%, Mode 1, in preparation t w removing *B" Circulating Water Pump from service for maintenance. Power was returned to 100% power, Mode 1, at 1650 on June 28, 1995. Power remained at or near 100% power, Mode 1, through the remainder of June, 1995.
1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGUIATORY RESTRICTION H: OTHER (EXPLAIN) 4. REDUCED LOAD
5. OTHER Wolf Creek Generating Station Monthly Operating Report June, 1995 Page 5 of 6

Attcchment*1 to WO 95-0112

, s WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH June, 1995

SUMMARY

OF OPERATING EXPERIENCE  :

i Listed below in chronological sequence is a summary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents. I DATE TIME EVENT l

?

6/18/95 2025 "C" Circulating ifater Pump tripped 6/28/95 0237 "B" Circulating dater Pump maintenance ,

4 i

l f

I t

t b

Wolf Creek Generating Station Monthly Operating Report June, 1995 '

Page 6 of 6 e- v .-