Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G1521999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Wolf Creek Generating Station.With ML20212A0251999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Wolf Creek Generating Station.With ML20210R5741999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Wolf Creek Generating Station ML20210R5921999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20209H0821999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20210R5871999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1021999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1071999-04-30030 April 1999 Revised MOR for Apr 1999 for Wolf Creek Generating Station ML20206P8261999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Wcgs.With ML20210R5841999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Wolf Creek Generating Station ML20205Q0761999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Wolf Creek Generating Station.With ML20207K5991999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Wolf Creek Generating Station.With ML20199E6531998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Wolf Creek Generating Station.With ML20198D7321998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Wolf Creek Generating Station.With ML20195D1791998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Wolf Creek Generating Station.With ML20154L4591998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Wolf Creek Generating Station.With ML20151W1491998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Wcgs.With ML20237B0841998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Wolf Creek Generating Station ML20236P3441998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Wolf Creek Generating Station ML20236P3481998-05-31031 May 1998 Corrected Page of MOR for May 1998 for Wolf Creek Generating Station ML20249A0171998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Wolf Creek Generating Station ML20247H0901998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Wolf Creek Generating Station ML20216F6101998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Wolf Creek Generating Station ML20216G1971998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Wolf Creek Nuclear Operating Corp ML20202H0721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Wolf Creek Generating Station ML20198P1931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Wolf Creek Generating Station ML20197J0321997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Wolf Creek Generating Station ML20199C7081997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Wolf Creek Generating Station ML20211N7161997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Wolf Creek Generating Station ML20216H9561997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Wolf Creek Generating Station ML20210M4401997-07-31031 July 1997 Monthly Operating Rept for July 1997 for WCGS ML20148L8781997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Wolf Creek Generating Station ML20141H7541997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Wolf Creek Generating Station ML20137W5021997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Wolf Creek Generating Station ML20147E5931997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Wolf Creek Generating Station ML20134M9821997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Wolf Creek Generating Station ML20133M3991996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Wolf Creek Generating Station ML20132C0871996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Wolf Creek Generating Station ML20134L7281996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Wolf Creek Generating Station ML20128N0301996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Wolf Creek Generating Station ML20134C1291996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Wolf Creek Generating Station ML20134C1371996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Wolf Creek Generating Station ML20116M5431996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Wolf Creek Generating Station ML20116M5471996-07-0808 July 1996 Revised Monthly Operating Rept for June 1996 for Wolf Creek) Generating Station ML20134C1321996-06-30030 June 1996 Revised Monthly Operating Rept for June 1996 for Wolf Creek ML20115F1211996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Wolf Creek Generating Station ML20112J1781996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Wolf Creek Generating Station.W/Undated Ltr ML20115F1251996-04-30030 April 1996 Monthly Operating Rept Revisions for April 1996 for Wolf Creek Generating Station ML20117D7701996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Wolf Creek Generating Station ML20107D8971996-03-31031 March 1996 Monthly Operating Rept for March 1996 for WCGS 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G1521999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Wolf Creek Generating Station.With ML20211N0161999-09-0202 September 1999 Safety Evaluation Supporting GL 95-07 to License NPF-42 ML20212A0251999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Wolf Creek Generating Station.With ML20217P6451999-08-30030 August 1999 Requests Commission Approval to Publish Encl Pr,Rg & SRP & to Issue Encl Ltr to Parties of Wolf Creek Transfer Proceeding Re Disposition of Existing Antitrust License Conditions in Event OL Transfer Approved ML20210R5741999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Wolf Creek Generating Station ML20210J1561999-07-29029 July 1999 Rev 0 to Wolf Creek Generating Station,Unit 1 Pressure & Temp Limts Rept ML20210R5921999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20209H0821999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Wolf Creek Generating Station ML20195D5261999-06-0202 June 1999 Safety Evaluation Approving Proposed ISI Program Alternative for Limited Reactor Vessel Shell Weld Exams & Relief Request from Requirements of ASME Code,Section XI ML20210R5871999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1021999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Wolf Creek Generating Station ML20195K1071999-04-30030 April 1999 Revised MOR for Apr 1999 for Wolf Creek Generating Station ML20206P8261999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Wcgs.With ML20196L3401999-04-30030 April 1999 Rev 1 to WCGS Cycle 11 Colr ML20210R5841999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Wolf Creek Generating Station ML20205Q0761999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Wolf Creek Generating Station.With ML20207K5991999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Wolf Creek Generating Station.With ML20207K9761998-12-31031 December 1998 Annual SER 14,for Period 980101-1231, for WCGS ML20199E6531998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Wolf Creek Generating Station.With ML20195C0011998-12-31031 December 1998 Ks City Power & Light Co 1998 Annual Rept & Financial Statements as of 981231 & 1997 for Ks Electric Power Cooperative,Inc ML20195B9901998-12-31031 December 1998 Western Resources Annual Rept for 1998 ML20198D7321998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Wolf Creek Generating Station.With ML20195H9801998-11-17017 November 1998 Safety Evaluation Supporting Proposed Changes to WCGS Radiological Emergency Response Plan ML20195E7591998-11-10010 November 1998 WCNOC Proposed PASS Function Reduction ML20195D1791998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Wolf Creek Generating Station.With ML20154L4591998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Wolf Creek Generating Station.With ML20153G2771998-09-30030 September 1998 Rev 1 to WCAP-15079, Wolf Creek Heatup & Cooldown Limit Curves for Normal Operation ML20153G2851998-09-30030 September 1998 Rev 1 to WCAP-15080, Evaluation of Pressurized Thermal Shock for Wolf Creek ML20153G2691998-09-30030 September 1998 Rev 1 to WCAP-15078, Analysis of Capsule V from Wolf Creek Nuclear Operating Corp Wolf Creek Reactor Vessel Radiation Surveillance Program ML20153G7301998-09-23023 September 1998 Special Rept 98-003:on 980814,station Entered TS 3.3.3.6, Action Statment a Due to Inoperability of RVLIS B Train. Cause Has Not Yet Been Identified.Work Order 98-202813-000 Has Been Generated ML20151W1491998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Wcgs.With ML20237B7381998-08-14014 August 1998 Special Rept 98-001:on 980615,oxygen Analyzer on Wgs Was Declared Inoperable.Wgs Oxygen Analyzer OARC-1119A Was Indicating 0 Ppm on 980814 & Fluctuated Between 200 & 900 Ppm on 980615.Completed Work Order & Declared Wgs Operable ML20237B0841998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Wolf Creek Generating Station ML20236P3441998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Wolf Creek Generating Station ML20236P3481998-05-31031 May 1998 Corrected Page of MOR for May 1998 for Wolf Creek Generating Station ML20249A0171998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Wolf Creek Generating Station ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20247H0901998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Wolf Creek Generating Station ML20216J7791998-04-15015 April 1998 SER Approving Requests for Relief I1R-46 Through I1R-49 & I2R-21 Submitted by Licensee on 970523.Relief for Exam Category B-A,Item B1.12,RPV Shell Welds Deferred Until Licensee Satisfies Regulations for Augmented Rv Exam ML20216C2641998-04-0606 April 1998 SER Accepting Addl Info Re GL 92-08, Thermo- Lag 330-1 Fire Barriers, for Plant ML20216F6101998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Wolf Creek Generating Station ML20217H3491998-03-31031 March 1998 SER Accepting Operational Quality Assurance Program Description Change for Wolf Creek Generating Station ML20217H7241998-03-30030 March 1998 SER Accepting Proposed Change to Operational Quality Assurance Program for Plant ML20216G1971998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Wolf Creek Nuclear Operating Corp ML20202H0721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Wolf Creek Generating Station ML20217G4311997-12-31031 December 1997 Western Resources 1997 Annual Rept & Financial Statements for Years Ended 971231 & 1996 for Ks Electric Power Cooperative,Inc ML20203H0151997-12-31031 December 1997 Annual Operating Rept 13 for Jan-Dec 1997 ML20217G3711997-12-31031 December 1997 Kansas City Power & Light Co 1997 Annual Rept ML20216D7771997-12-31031 December 1997 Annual SER 12 for Jan-Dec 1997, for Wolf Creek Generating Station 1999-09-30
[Table view] |
Text
.
, . I l
s l
~
WQLF CREEK NUCLEAR OPERATING CORPORATION l
I Otto L. Maynard VK.e Presdent Plant Operatons l
July 11, 1995 l i
WO 95-0112 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 1 Mail Station 91-137 Washington, D. C. 20555 l
Subject:
Docket No. 50-482: June, 1995, Monthly l Operating Report I
Gentlemen:
l Attached is the June, 1995, Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accordance with the requirements.of Technical Specification 6.9.1.8. l i
i J
Very truly yours, l l
1 1
Otto L. Maynard OLM/jra Attachment l
1 cc: L. J. Callan (NRC), w/a D. F. Kirsch (NRC) , w/a J. F. Ringwald (NRC), w/a J. C. Stone (NRC), w/a 9507210151 950630 PDR R ADOCK 05000482 PDR
- O P O Dox 411/ Uunington, KS 66839 / Phone. (316) 3644831 An Equa! Opportunity Employer MT/HCNET
((A git
/
i Attachment to WO 95-0112 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH: June YEAR: 1995 Docket No.: 50-482 :
Facility Operating License No.- NPF-42 Report No. 124 l
l 1
i l
I i
i i I
Wolf Creek Generating Station Monthly Operating Report June, 1995 Page 1 of 6
. ,. _ . ~ . . . . - . - . - . - . _ .. . . . ~
Attachment 'to WO 95-0112 l
l
SUMMARY
l The following report highlights the operating experience of Wolf Creek Generating Station for the month of June, 1995. This report is being provided pursuant to Technical Specification 6.9.1.8.
I.
SUMMARY
OF OPERATING EXPERIENCE The unit operated at or near 100% power, Mode 1, from June 1, 1995, through June 17, 1995.
On June 18 at 2025, the "C" Circulating Water Pump tripped, and the Reactor subsequently stabilized at 65% power, Mode 1. The pump trip was caused by the Field Monitor Relay actuation due to a burned spot on the Field Potentiometer. On June 18, at 2115, the unit commenced increasing Reactor power, which was stabilized at 74% for troubleshooting.
Power increase commenced again on June 19, at 1201, and the plant returned to 100% power, Mode 1, at 1527 on June 19, 1995.
The unit continued to operate at or near 100% power, Mode 1, until June 28, 1995, at 0237, when power was reduced to 71%, Mode 1, in preparation for removing "B" Circulating Water Pump from service for maintenance. Power was returned to 100% power, Mode 1, at 1650 on June 28, 1995.
Power remained at or near 100% power, Mode 1, through the remainder of June, 1995.
II. MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES r
NONE :
l l
l 1
)
Wolf Creek Generating Station Monthly Operating Report June, 1995 Page 2 of 6 I
. I Attachment'to WO 95-0112
, . OPERATING DATA REPORT DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 7-6-95 1 TELEPHONE 316-364-8831 1 OPERATING STATUS
- 1. Reporting Period: June, 1995 Gross Hours in Reporting Period 720
- 2. Currently Authorized Power Level (MWt): 3565 Max. Depend, Capacity (MWe-Net) : 1166 Design Electrical Rating (MWe-Ne t) : 1170
- 3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A
- 4. Reasons for Restriction (If Any) : N/A This Month Yr. to Date Cumulative
- 5. Number of Hours Reactor was Critical 720 4,231.7 70,199.8
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8
- 7. Hours Generator on Line 720 4,208.1 69,362.7
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
- 9. Gross Thermal Energy Generated (MWh) 2,524,794 14,476,797 229,779,115
- 10. Gross Electrical Energy Generated (MWh) 871,485 5,115,507 79,879,722
- 11. Net Electrical Energy Generated (MWh) 834,180 4,901,953 76,276,627
- 12. Reactor Service Factor 100.0% 97.4% 81.5%
- 13. Reactor Availability Factor 100.0% 97.4% 81.9%
- 14. Unit Service Factor 100.0% 96.9% 80.6%
- 15. Unit Availability Factor 100.0% 96.9% 80.6%
- 16. Unit Capacity Factor (Using MDC) 99.4% 96.8% 78.1%
- 17. Unit Capacity Factor (Using Uesign MWe) 99.0% 96.5% 75.7%
- 18. Unit Forced Outage Rate 0.0% 3.1% 5.0%
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):
No outages are scheduled at this time.
- 20. If Shut Down at End of b : art Period, Estimate Date of Startup: N/A Wolf Creek Generating Station l
Monthly Operating Report June, 1995 Page 3 of 6 l
. Attachment to WO 95-0112
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 7-6-95 TELEPHONE 316-364-8831 MONTH June, .995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1178 17 1172 2 1170 18 1118 3 1173 19 992 4 1174 20 1168 5 1174 21 1167 ;
6 1173 22 1166 7 1172 23 1160 8 1165 24 1170 9 1169 25 1172 10 1176 26 1174 11 1177 27 1173 12 1177 28 1018 13 1176 29 1171 14 1174 30 1173 no.
15 1165 31 N/A 16 1172 >
I l
l
)
Wolf Creek Generating Station l Monthly Operating Report June, 1995 Page'4 of 6 I l
mm
, . . to WO 95-0112 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.~$0'-482 WOLF CREEK GENERATING STATION ^
WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 7-6-95 TELEPHONE 316-364-BB31 Type METHOD OF SHIRTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /CCMMENTS No Date S: SCHEDULED (Hours) (1) OR REDUCING POWER (2) 1 6/18/95 F 19 A 4 N/A 2 6/28/95 S 14 B 4 N/A
SUMMARY
- The unit operated at or near 100% power Mode 1, from June 1, 1995, through June 17, 1995. On June 18 at 2025, the *C" Circulating water Pump tripped, and the Reactor subsequently stabilized at 65% power, Mode 1. The pump trip was caused by the Field Monitor Relay actuation due to a burned spot on the Field Potentiometer. On June 18 at 2115, the unit commenced increasing Reactor power, which was stabilized at 74% for troubleshooting. Power increase commenced again on June 19, at 1201, and the plant returned to 100% power, Mode 1, at 1527 on June 19, 1995. The unit continued to operate at or near 100% power, Mode 1, until June 28, 1995, at 0237, when power was reduced to 71%, Mode 1, in preparation t w removing *B" Circulating Water Pump from service for maintenance. Power was returned to 100% power, Mode 1, at 1650 on June 28, 1995. Power remained at or near 100% power, Mode 1, through the remainder of June, 1995.
- 1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGUIATORY RESTRICTION H: OTHER (EXPLAIN) 4. REDUCED LOAD
- 5. OTHER Wolf Creek Generating Station Monthly Operating Report June, 1995 Page 5 of 6
Attcchment*1 to WO 95-0112
, s WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH June, 1995
SUMMARY
OF OPERATING EXPERIENCE :
i Listed below in chronological sequence is a summary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents. I DATE TIME EVENT l
?
6/18/95 2025 "C" Circulating ifater Pump tripped 6/28/95 0237 "B" Circulating dater Pump maintenance ,
4 i
l f
I t
t b
Wolf Creek Generating Station Monthly Operating Report June, 1995 '
Page 6 of 6 e- v .-