Application for Amend to License DPR-35 to TS Re Change to MSIV Leakage Requirement
ML20078K788
Person / Time
Site: Pilgrim
Issue date: 11/22/1994
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078K794 List:
References
94-125, NUDOCS 9411250207
Download: ML20078K788 (2)


Text

. -. _ . _ . . _ _ -

~ i

=

  • l G i Boston Edison  ;

Pugrim Nuclear Power Station Rocky Hdi Road Plyrnouth. Massachusetts 02360 E. T. Boulette, PhD .

Senior Vice President - Nuclear Novemaer 22, 1994 BECo Ltr. #94125 j U.S. Nuclear Regulatory Commission i Attention: Document Control Desk l Washington, DC 20555 l l

Docket No. 50-293 i License No. DPR-35 Proposed Technical Specification Change to the  !

Main Steam Isolation Valve Leakaae Reauirement i l

Boston Edison Company (BECo) proposes the attached change to Pilgrim Nuclear Power Station i Technical Specification section 4.7.A.2.a.4. This proposed change revises the allowable leak rate for  ;

the main steam isolation valves (MSIVs) from the current 11.5 standard cubic feet per hour (scfh) for l each valve, to a maximum combined main steam line leak rate of 46 scfh. '

This change is proposed as a Cost Beneficial Licensing Action (CBLA). Revising the method of i calculating leakage performance will result in a reduction in MSIV repairs and refurbishment costs, reduce dose exposures to maintenance personnel, reduce outage durations, and extend the effectin service life of the MSIVs.

To maximize the benefit we request approval of this change to coincide with the next scheduled testing of the MSIVs currently planned during our upcoming refueling outage commencing April 1, 1995.

Attachment A provides the change details. The revised technical specification page is provided in Attachment B. Attachment C provides the existing page marked-up to show the proposed change.

C h0VIk E. T. Boulette, PhD Commonwealth of Massachusetts)

County of Plymouth )

Then personally appeared before me, E. T. Boulette, who being duty swom, did state that he is Senior Vice President - Nuclear of Boston Edison Company and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.

My commission expires: '?%Z M d'#

DATE '

uw b .1su -

, (/ NOTARY POBLIO' ETB/JDK/nas/ NEWTS /Mainstm y/ #-

9411250207 941122 m Ii o4 PDR ADDCK 05000293 P PDR i

p Attachmentst (A)

Description of Change

-(B) Amended Tech Spec Page (C) Marked-up page from Current Tech Specs cc: Mr. R. Eaton, Project Manager Division of Reactor Projects - l/ll Mail Stop: 14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station Mr. Robert M. Hallisey, Director Radiation Control Program Center for Communicable Diseases Mass. Dept. of Public Health 305 South Street Jamaica Plain, MA 02130