MONTHYEARML20196D0071999-06-16016 June 1999 Application for Amend to License DPR-35,changing TS Re Reactivity Control by Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8101999-05-11011 May 1999 Application for Amend to License DPR-35,requesting NRC Review & Approval of Change to TS Section 3/4.5.C, HPCI, Sys,Section 3/4.5.D, RCIC Sys & Bases Associated with Sections ML20206H9651999-05-0505 May 1999 Application for Amend to License DPR-35,modifying Licensing Basis for EDG on-site Diesel Fuel Storage Requirement & Corresponding TSs ML20203B5721999-02-0505 February 1999 Redacted Application for Amend to License DPR-35, Transferring FOL & Matls License 20-07626-04 from Boston Edison to Entergy Nuclear ML20202B4821999-01-21021 January 1999 Application for Amend to License DPR-35,using New Values for post-accident Containment Pressure in Plant NPSH Analyses Performed for ECCS Pumps.Calculations Supporting Request, Encl ML20198G5731998-12-21021 December 1998 Application for Amends to License DPR-35 & Matls License 20-07626-04,transferring PNPS from Boston Edison to Entergy Nuclear.Proprietary Info Encl.Proprietary Info Withheld. Pages 608 Through 621 of Incoming Submittal Not Included ML20249C7081998-06-26026 June 1998 Application for Amend to License DPR-35,correcting Typos & Updating Bases.Changes Are Considered Administrative ML20217H2681998-03-25025 March 1998 Application for Amend to License DPR-35,modifying Tech Specs 3.6.A.1 & 4.6.A.1 as It Pertains to Primary Sys Boundary, Thermal & Pressurization Limitations & Surveillance Requirements & Basis 3/4.6.A.Calculation Encl ML20203D4851998-02-20020 February 1998 Application for Amend to License DPR-35,to Change TS 3/4.5.B & Bases to Incorporate Ultimate Heat Sink Temperature 75 F, as Required by Amend 173.Request Fulfills Commitment to Submit TS Amend for UHS Temperature by First Quarter 1998 ML20203A0781998-02-11011 February 1998 Application for Amend to License DPR-35 UFSAR Section 10.7, Clarifying Design Basis for Salt Water Svc Water Sys BECO-LTR-97-107, Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed1997-10-24024 October 1997 Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed BECO-97-096, Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-14331997-09-19019 September 1997 Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-1433 BECO-LTR-97-002, Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld1997-01-24024 January 1997 Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld ML20135C1271996-11-26026 November 1996 Application for Amend to License DPR-35,modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consistent W/Lco 3/4.7.A.2.a.4 BECO-96-042, Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control1996-05-0101 May 1996 Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control ML20111B4121996-05-0101 May 1996 Application for Amend to License DPR-35,revising TS to Reflect Implementation of 10CFR50 App J,Option B ML20108C0781996-05-0101 May 1996 Application for Amend to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Util QA Manual ML20108C0261996-05-0101 May 1996 Application for Amend to License DPR-35 Re Core Alteration & LCO & Surveillance Conditions Associated W/Secondary Containment BECO-LTR-96-040, Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant1996-04-25025 April 1996 Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant BECO-95-074, Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 111995-07-14014 July 1995 Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078N4751995-02-0909 February 1995 Application for Amend to License DPR-35,increasing Reactor High Water Level Isolation Trip Level Setting BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-2011994-11-22022 November 1994 Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 ML20078K7881994-11-22022 November 1994 Application for Amend to License DPR-35 to TS Re Change to MSIV Leakage Requirement BECO-94-127, Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly1994-11-22022 November 1994 Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly BECO-94-126, Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days1994-11-22022 November 1994 Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days BECO-94-098, Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe1994-09-0606 September 1994 Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe ML20072S0741994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20072S0331994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Setpoint for Reactor Pressure to Isolate Shutdown Cooling Sys ML20072R9891994-09-0606 September 1994 Application for Amend to License DPR-35 Involving Proposed Administrative Change to TSs Re Control Room Annunciator. Amend Involves Relocation of Alarms for Drywell Suppression Vacuum Breakers ML20069M3181994-06-0909 June 1994 Application for Amend to License DPR-35,revising TS to Increase Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys.Proposed Change Also Made to Section 4.5.H, Maint Of...Discharged Pipe to Reflect Amend 149 ML20067B6941994-02-0909 February 1994 Application for Amend to License DPR-35,proposing Changes to TS by Revising Wording for Page 3 of License DPR-35,adding Clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion ML20058N0131993-12-10010 December 1993 Application for Amend to License DPR-35,proposing Changes to Ts,Re Request for Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20062J3311993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to Remove Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint BECO-93-133, Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors1993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors ML20046D0411993-08-0909 August 1993 Application for Amend to License DPR-35,proposing 24 Month Fuel Cycle ML20044G1251993-05-20020 May 1993 Application for Amend to License DPR-35,revising TS Re MSIV Turbine Inlet Low Pressure Setpoint to Reduce Potential Spurious Isolations Caused by Existing Higher Setpoint.Ge Repts MDE-70-0586 & NEDO-31296 Encl ML20128P3651993-02-11011 February 1993 Application for Amend to License DPR-35,changing TS to Increase Allowed Fuel Assembly Storage Cells from 2,320 to 3,859 & Changing Max Loads Allowed to Travel Over Spent Fuel Assemblies to 2,000 Lbs.Holtec Rept HI092925 Encl BECO-92-126, Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii)1992-10-30030 October 1992 Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii) BECO-92-121, Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time1992-10-23023 October 1992 Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time BECO-92-116, Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations1992-10-0808 October 1992 Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations BECO-92-101, Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.971992-08-17017 August 1992 Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.97 BECO-92-097, Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations1992-08-10010 August 1992 Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations BECO-92-079, Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions1992-07-24024 July 1992 Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions BECO-92-039, Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing1992-04-0808 April 1992 Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing BECO-92-012, Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests1992-02-0707 February 1992 Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests ML20086J5411991-12-0606 December 1991 Application for Amend to License DPR-35,revising Section 3/4.9, Auxiliary Electrical Sys,To Incorporate Surveillance for Inverters Associated W/Hpci & RCIC Sys BECO-91-136, Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO1991-10-24024 October 1991 Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO BECO-91-127, Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR1991-10-0707 October 1991 Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR BECO-91-076, Application for Amend to License DPR-35,revising Thermal & Pressurization Limit Curves of Tech Specs Figures 3.6.1 & 3.6.2 & Adding New Curve to Figure 3.6.3 to Cover Operation Between 10 & 32 Effective Full Power Years1991-06-11011 June 1991 Application for Amend to License DPR-35,revising Thermal & Pressurization Limit Curves of Tech Specs Figures 3.6.1 & 3.6.2 & Adding New Curve to Figure 3.6.3 to Cover Operation Between 10 & 32 Effective Full Power Years BECO-91-052, Revised Application for Amend to License DPR-35,changing Tech Spec Re Reactor Coolant Leakage Detection Sys at Plant1991-04-10010 April 1991 Revised Application for Amend to License DPR-35,changing Tech Spec Re Reactor Coolant Leakage Detection Sys at Plant 1999-06-16
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20196D0071999-06-16016 June 1999 Application for Amend to License DPR-35,changing TS Re Reactivity Control by Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8101999-05-11011 May 1999 Application for Amend to License DPR-35,requesting NRC Review & Approval of Change to TS Section 3/4.5.C, HPCI, Sys,Section 3/4.5.D, RCIC Sys & Bases Associated with Sections ML20206H9651999-05-0505 May 1999 Application for Amend to License DPR-35,modifying Licensing Basis for EDG on-site Diesel Fuel Storage Requirement & Corresponding TSs ML20203B5721999-02-0505 February 1999 Redacted Application for Amend to License DPR-35, Transferring FOL & Matls License 20-07626-04 from Boston Edison to Entergy Nuclear ML20202B4821999-01-21021 January 1999 Application for Amend to License DPR-35,using New Values for post-accident Containment Pressure in Plant NPSH Analyses Performed for ECCS Pumps.Calculations Supporting Request, Encl ML20198G5731998-12-21021 December 1998 Application for Amends to License DPR-35 & Matls License 20-07626-04,transferring PNPS from Boston Edison to Entergy Nuclear.Proprietary Info Encl.Proprietary Info Withheld. Pages 608 Through 621 of Incoming Submittal Not Included ML20249C7081998-06-26026 June 1998 Application for Amend to License DPR-35,correcting Typos & Updating Bases.Changes Are Considered Administrative ML20217H2681998-03-25025 March 1998 Application for Amend to License DPR-35,modifying Tech Specs 3.6.A.1 & 4.6.A.1 as It Pertains to Primary Sys Boundary, Thermal & Pressurization Limitations & Surveillance Requirements & Basis 3/4.6.A.Calculation Encl ML20203D4851998-02-20020 February 1998 Application for Amend to License DPR-35,to Change TS 3/4.5.B & Bases to Incorporate Ultimate Heat Sink Temperature 75 F, as Required by Amend 173.Request Fulfills Commitment to Submit TS Amend for UHS Temperature by First Quarter 1998 ML20203A0781998-02-11011 February 1998 Application for Amend to License DPR-35 UFSAR Section 10.7, Clarifying Design Basis for Salt Water Svc Water Sys BECO-LTR-97-107, Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed1997-10-24024 October 1997 Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed BECO-97-096, Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-14331997-09-19019 September 1997 Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-1433 BECO-LTR-97-002, Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld1997-01-24024 January 1997 Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld ML20135C1271996-11-26026 November 1996 Application for Amend to License DPR-35,modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consistent W/Lco 3/4.7.A.2.a.4 ML20108C0261996-05-0101 May 1996 Application for Amend to License DPR-35 Re Core Alteration & LCO & Surveillance Conditions Associated W/Secondary Containment BECO-96-042, Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control1996-05-0101 May 1996 Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control ML20111B4121996-05-0101 May 1996 Application for Amend to License DPR-35,revising TS to Reflect Implementation of 10CFR50 App J,Option B ML20108C0781996-05-0101 May 1996 Application for Amend to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Util QA Manual BECO-LTR-96-040, Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant1996-04-25025 April 1996 Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant BECO-95-074, Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 111995-07-14014 July 1995 Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078N4751995-02-0909 February 1995 Application for Amend to License DPR-35,increasing Reactor High Water Level Isolation Trip Level Setting BECO-94-126, Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days1994-11-22022 November 1994 Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days ML20078K7881994-11-22022 November 1994 Application for Amend to License DPR-35 to TS Re Change to MSIV Leakage Requirement BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-2011994-11-22022 November 1994 Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 BECO-94-127, Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly1994-11-22022 November 1994 Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly ML20072S0741994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20072S0331994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Setpoint for Reactor Pressure to Isolate Shutdown Cooling Sys ML20072R9891994-09-0606 September 1994 Application for Amend to License DPR-35 Involving Proposed Administrative Change to TSs Re Control Room Annunciator. Amend Involves Relocation of Alarms for Drywell Suppression Vacuum Breakers BECO-94-098, Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe1994-09-0606 September 1994 Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe ML20069M3181994-06-0909 June 1994 Application for Amend to License DPR-35,revising TS to Increase Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys.Proposed Change Also Made to Section 4.5.H, Maint Of...Discharged Pipe to Reflect Amend 149 ML20067B6941994-02-0909 February 1994 Application for Amend to License DPR-35,proposing Changes to TS by Revising Wording for Page 3 of License DPR-35,adding Clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion ML20058N0131993-12-10010 December 1993 Application for Amend to License DPR-35,proposing Changes to Ts,Re Request for Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20059J1651993-11-0404 November 1993 Corrected Amend 149 to License DPR-35,correcting Administrative Errors ML20062J3311993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to Remove Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint BECO-93-133, Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors1993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors ML20046D0411993-08-0909 August 1993 Application for Amend to License DPR-35,proposing 24 Month Fuel Cycle ML20044G1251993-05-20020 May 1993 Application for Amend to License DPR-35,revising TS Re MSIV Turbine Inlet Low Pressure Setpoint to Reduce Potential Spurious Isolations Caused by Existing Higher Setpoint.Ge Repts MDE-70-0586 & NEDO-31296 Encl ML20128P3651993-02-11011 February 1993 Application for Amend to License DPR-35,changing TS to Increase Allowed Fuel Assembly Storage Cells from 2,320 to 3,859 & Changing Max Loads Allowed to Travel Over Spent Fuel Assemblies to 2,000 Lbs.Holtec Rept HI092925 Encl ML20127P5311993-01-25025 January 1993 Amend 145 to License DPR-35,revising TS SRs for Station Batteries by Replacing Rated Load Discharge Test W/Svc Discharge Test once-per-cycle & Performance Discharge Test Every Five Yrs BECO-92-126, Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii)1992-10-30030 October 1992 Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii) BECO-92-121, Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time1992-10-23023 October 1992 Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time BECO-92-116, Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations1992-10-0808 October 1992 Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations BECO-92-101, Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.971992-08-17017 August 1992 Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.97 BECO-92-097, Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations1992-08-10010 August 1992 Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations BECO-92-079, Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions1992-07-24024 July 1992 Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions BECO-92-039, Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing1992-04-0808 April 1992 Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing BECO-92-012, Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests1992-02-0707 February 1992 Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests ML20086J5411991-12-0606 December 1991 Application for Amend to License DPR-35,revising Section 3/4.9, Auxiliary Electrical Sys,To Incorporate Surveillance for Inverters Associated W/Hpci & RCIC Sys BECO-91-136, Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO1991-10-24024 October 1991 Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO BECO-91-127, Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR1991-10-0707 October 1991 Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR 1999-06-16
[Table view] |
Text
m--
7 - ,
~
.Aa . . 7 :.
W
+
' BOSTON EDISON Pilgnm Nuclear Poner station 10CFR50.90
> Rocky Hi:1 Road Plymouth Massachusetts 02360
, -May 20, 1993 BEco 93-062
' E. T. Boulette, PhD Sgnior Vee Presiderit-Nuclear U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS:
MAIN STEAM INSOLATION VALVE TURBINE INLET LOW PRESSURE SETPOINT I Boston Edison Company (BECO) proposes the attached changes to Appendix A of Operating License No. DPR-35 in accordance with 10CFR50.90. 0ne proposed change reduces the Main Steam Isolation Valve Low Turbine Inlet Pressure (MSIVLTIP) setpoint from 1880 pounds per square inch gauge (psig) to 2810 psig. This change is proposed to reduce potential spurious isolations caused by the existing higher setpoint. The other proposed change reduces the minimum pressure in the definition of RUN mode from 880 psig to 785 psig.
This change is proposed to realize fully the potential of enhanced operating flexibility provided by the proposed reduction in the MSIVLTIP.
The-requested changes are described in Attachment A. The revised Technical Specification pages are in Attachment B. Attachment C provides the existing pages marked-up to show the proposed changes. Attachment D is a copy of
!' General Electric report #MDE-70-0586, " Evaluation of the Effect on_ Plant Operation of MSIV Low Turbine Inlet Pressure Isolation Setpoint. Change for
~ Pilgrim Nuclear Power Station". Attachment E is a copy of General Electric report "NED0-31296".
lI 0_ QDDLL JY E.T. Boulette Seninr Vice President - Nuclear Commonwealth of Massachusetts)
County of Plymouth )
Then personally appeared bef' ore me, E. T. Boulette, ..io being duly sworn, did state that he is Senior Vice President - Nuclear of Boston Edison Company and that he is duly authorized to execute and file the submittal. contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.
.My commission expires: (c/M & /99C C7/ d/m -
DATE /' \ ~ NOTARY PUBLIC 9306020057 930520
'PDR:,ADOCK 05000293
)' [
L :P' PDR r
in, ._c x w
., o BOSTON EDISON COMPANY .
U.S. Nuclear Regulatory Commission p
Page 2 r
Attachments: (A) Description of Proposed Change (B) Amended Technical Specification Pages (C) Marked-up Pages from Current Technical Specifications '
(D) MDE-70-0586, " Evaluation of the Effect on Plant Operation of MSIV Low Turbine Inlet Pressure Isolation Setpoint Change at Pilgrim Nuclear Power Station" (E) NED0-31296, " Safety Evaluat:cn of MSIV Low Turbine Inlet Pressure Isolation Setpoint Change for Pilgrim Nuclear Power Station" i
I signed original and 37 copies cc: Mr. R. Eaton, Project Manager Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Mail Stop: 14D1 1 U. S. Nuclear Regulatory Commission 1 White Flint North ;
11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 ,
Senior NRC Resident Inspector Pilgrim Nuclear Power Station Mr. Robert M. Hallisey, Director -
Radiation Control Program ,
Massacht.sc tts Department of Public Health '
305 South Street Jamaica Plain, MA 02130 l
1 PMK/nas/mainstm I
l d
s ATTACHMENT A Proposed Chance Two changes are proposed. One proposed change lowers the " Low Pressure Main Steam Line" setpoint from 2880 psig to 1810 psig. The other proposed change reduces the minimum pressure in the definition of RUN mode from 880 psig to 785 psig.
The specific chances are identified by change bars in the margins of the proposed pages in Attachment B, and by the marked-up current Technical Specification pages in Attachment C.
Reason for Chanae The Main Steam Isolation Valve (MSIV) low-pressure isolation setpoint is part of the primary containment and reactor vessel isolation control system. It provides isolation in response to pressure regulator malfunctions. The setpoint should be high enough to provide timely detection of pressure regulator malfunctions and low enough to prevent spurious isolations. The current supoint of 2 880 psig fulfills its detection function but has resulted in spurhus isolations. Based on General Electric's analysis NED0-31296, " Safety Evaluation of MSIV Low Turbine Inlet Pressure Isolation Setpoint Change for Pilgrim Nuclear Power Station", changing the setpoint to 2810 psig provides protection against regulator malfunctions while providing greater margin against spurious isolations.
The reduced minimum pressure in the definition of RUN mode is to realize fully the potential of enhanced operating flexibility provided by the reduced MSIVLTIP setpoint. By reducing this setpoint to 785 psig, operators may- '
switch to the RUN mode and exceed 25% power immediately upon clearing the MSIVLTIP setpoint during startups. A value of 785 psig for the minimum :
pressure in the definition of the RUN mode is consistent with the lower bound i of the range of applicability of the GEXL correlation. !
Safety Evaluation and Determination of No Sionificant Hazards Considerations The Code of Federal Regulations (10CFR50.91) requires licensees requesting an f amendment to provide an analysis, using the standards in 10CFR50.92, that !
determines whether a significant hazards consideration exists. The following analysis is provided in accordance with 10CFR50.91 and 10CFR50.92 for the i proposed amendment to lower the MSIV Low Turbine Inlet Pressure (MSIVLTIP) !
setpoint from 2880 psig to 2810 psig and to lower the minimum pressure in the _
definition of RUN mode from 880 psig to 785 psig. i
- 1. The operation of Pilgrim Station in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously identified.
The MSIVLTIP setpoint is associated with.the primary containment and :!
reactor vessel isolation control system. The safety purpose of this system is to automatically initiate closure of isolation valves to ensure radiological releases to the environs are less than the maximum allowed by 10CFR100. However, the MSIVLTIP setpoint does not affect the safety function of the primary containment and reactor vessel isolation control system. While the MSIV low-pressure setpoint can initiatr isolation of the primary containment and reactor vessel, assessments of radiological Page 1 of 3 1
I
. ~- _. - - . - .
s -
s releases do not take credit for automatic isolation initiated by a trip of the MSIV low-pressure setpoint. For the design basis steam line break, radiological releases are assessed assrming automatic isolation initiated ;
by a high steam line flow rate. For a small steam line break, ,
radiological releases are assessed assuming-automatic isolation initiated ~
by high radiation-in the steam tunnel or high temperature in the turbine - :
bui? ding. MSIVLTIP setpoint is nevertheless important to power ?
operations. The MSIVLTIP setpoint prevents excessive vessel depressurization should the nuclear system pressure regulator fail open. !
Excessive vessel depressurization can impose significant thermal stresses on the nuclear system process barrier, resulting in.an increase in the !
nuclear system process barrier's lifetime fatigue usage factor. NEDD- :
31296 and BECO calculation I-NI-30 show the lifetime fatigue usage factor, assuming eight pressure regulator failure (open) events, is not ,
significantly increased by reducing the allowable value MSIVLTIP setpoint :
from 1880 to 2 810 psig. '
Other potential effects were analyzed:
l
- a. Reducing the MSIVLTIP setpoint will have no impact on the Minimum Critical Power Ratio (MCPR). As noted in the analysis (NE00-31296), MSIV closure following a pressure regulator failure transient with the current setpoint i of 1880 psig corresponds to a neutron flux of less than 1%. This result. !
. is based on the assumption Turbine Control Valves (TCVs) open '
instantaneously upon failure of the pressure regulator. A lower setpoint a
will postpone MSIV closure. However, this postponement is not of concern :
because MCPR is not near the safety limit due to the very low reactor i powers involved and remain bounded by the MCPR associated with the ;
transients in the reload license submittal. This conclusion remains valid !
in the event the TCV's open slowly. l
- b. Reducing the MSIV low-pressure isolation setpoint does result in an ,
l extended depressurization time prior to isolation. An extended depressurization results in a greater bulk water level swell with the i potential of reaching the steam line nozzle, thereby trapping liquid in
. the steam line between the vessel and the in-board MSIV. However, a GE l 7 analysis of this event (MDE-70-0586), using a bounding set of initial !
conditions chosen to maximize the severity of the water-level swell, shows '
water level will not increase to the bottom of the steam line nozzle !
elevation. Hence, no liquid would be trapped in the steam lines, and SRV ;
performance would not be affected. ;
- c. If the MSIV low-pressure isolation setpoint were removed, a rapid 4 depressurization of the reactor vessel due to a pressure regulator i failure while the rea: tor is near full power could result in differential pressures across the fuel channels sufficient to cause mechanical deformation of the channels. From a safety perspective, these ,
deformations are bounded by the deformations associated with the steam '!
line break accident and do not challenge Pilgrim's accident analysis.
- d. Reducing the MSIV low-pressure setpoint to 1810 psig continues to provide i automatic protection of the low-pressure core thermal power safety limit - ,
(<25% of rated core thermal power for reactor pressure less than 785 l psig).
I 1
Page 2 of 3 ;
l i
The other proposed change reduces the minimum pressure in the definition ;
of RUN mode from 880 psig to 785 psig. Reactor modes are determined by !
the position of the mode switch. The safety function of the mode switch l is to select the necessary scram functions for various plant conditions- *
.The mode switch also provides necessary scram bypasses to facilitate j operation. -
i Reducing the minimum pressure for the reactor to be in the RUN mode ;
affects none of these functions. Specifically, the scram on high flux at i less than 25% power (with the reactor in STARTUP) will not- be bypassed before 785 psig is exceeded. This pressure is the minimum pressure for using the minimum critical power ratio (MCPR) as the basis for fuel ;
cladding protection. Below this pressure, the scram at less than 25% of rated power provides the basis for protecting fuel cladding.
Based on the results of the various analyses, reducing the MSIVLTIP
, setpoint from >880 psig and reducing the minimum pressure in the RUN mode ,
definition to 785 psig will not result in a significant increase in the ;
probability or consequences of an accident previously identified. i
- 2. The operation of Pilgrim Station in accordance with the proposed amendment will not create the possibility of a new or different kind of accident i from any accident previously analyzed. !
This proposed change modifies an existing instrument setpoint and reduces ,
the minimum pressure for the reactor to be in the RUN mode. No other !
modifications to Pilgrim are involved. All plant scenarios affected by !
this setpoint have been reanalyzed as described in the above Part 1. For
- this reason it is concluded that this change does not create a new or i different kind of accident from any accident previously analyzed. i i
- 3. The operation of Pilgrim Station in accordance with the proposed amendment i will not involve a significant reduction in the margin of safety. !
k As discussed in (1), the MSIVLTIP setpoint does not affect the safety l function of the primary containment and reactor vessel isolation control ;
system, and assessments of radiological releases related to 10CFR100 ;
requirements do not take credit for it, Also, the MSIVLTIP does not !
- affect the margin of safety for any system or component that is indirectly !
impacted by this setpoint function and the minimum pressure in which the !
reactor mode switch may be in RUN remains consistent with the bases for !
ensuring the integrity of the fuel cladding. Therefore, operating Pilgrim l in accordance with the proposed changes does not involve a significant ' !
reduction in the margin of safety.
This proposed change has been rr ewed and approved by the Operations Review ,
Committee and reviewed by the Nalcar Safety Review and Audit Committee. l Schedule of Change i This change will be implemented within 30 days following BECo's receipt of its i approval by the Commission. !
4 i
Page 3 of 3 {