ML20084F886

From kanterella
Revision as of 23:47, 17 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs of Periodic Insp of Hydraulic Shock Absorbers on 741010-14 Per Skovholt 731001 Ltr.Snubbers Considered Operable
ML20084F886
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/28/1974
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Goller K
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084F681 List:
References
NUDOCS 8304210306
Download: ML20084F886 (1)


Text

(3 m

\Y N/

,7%

fk U * '). .-

ROCHES TER GAS AND ELECTRIC CORPCRATION e 89 EAST AVENUE, RCCHL: STER, N.Y. N64.3 t e em o v, o n 2 , ,,

October 28, 1974 g b 'p

~

0c7., . c/j A._

J t.: UQIb)' ,

~:

Mr. Karl Goller Assistant Director for Operating Reactors h[., f.Q.6))%y"- 0 Directorate of Licensing U. S. Atomic Energy Commission

'C/

t 5w;,__'

[4' ,,

Washington, D.C. 20545

Subject:

Inspection of Hydraulic Shock Absorbers (Snubbers)

R. E. Ginna Nuclear Power Plant, Unit No.1 Docket No. 50-244

Dear Mr. Goller:

In accordance with Mr. Skovholt's letter of October 1,1973 con-cerning periodic inspection of hydraulic shock absorbers (snubbers),

an inspection of all snubbers, both incide and outside of contain-ment, was conducted during the period of October 10, 1974 through October 14, 1974.

All snutbers were considered operoble at this inspection. A small quantity of hydraulic fluid was added to three snubbers which were located outside of the containment. This was the first addition of fluid to any of these units in approximately four months. There was no definite indications of leakage in the area.

Very truly yours ,

pv-$,T'-[m.

- s.

L^ 7

/

L. D. White , Jr.

.pel 8304210306 751223 /)(ud -111<

~' "> 1 : -

PDR ADOCK 05000244 PDR O

LU1'r ti6N1' REGION _

Z