ML20084F918

From kanterella
Jump to navigation Jump to search
Informs of Periodic Insp of Hydraulic Shock Absorbers on 740619 & 20 Per Skovholt .Snubbers Considered Operable
ML20084F918
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/01/1974
From: Amish K
ROCHESTER GAS & ELECTRIC CORP.
To: Goller K
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084F681 List:
References
NUDOCS 8304210321
Download: ML20084F918 (1)


Text

n C,!

/^

V e-

?

.i 2.-

Y"',

a? ;- :: LCin!C CC; ~ OF ATiDN s E? E A S T,WDIUE, RCC!iE5 7E." N.Y.1.:M ?

.... a u o. n

. N!

July 1, 1974

, c,.N.

V,. ; c.

s n.

. u -l i x ;.s,

]a t((i(r?,,

\\'

~

n.

Mr. Karl Coller A

c.

n('S ' '

Assistant Director for Operating Reactors Directorate of Licensing U. S. Atomic Energy Commission

'Q/};

Washington, D.C. 20545 wn '

Subject:

Inspection of Hydraulic Shock Absorbers (Snubbers)

R. I:. Ginaa Nuclear Power Plant, Unit No.1 Docket No. 50-244

Dear Mr. Goller:

In accordance with Mr. Skovholt's letter of October 1,1973, concerning periodic inspection of hydraulic shock absorbers (snubbers), an inspection of all snubbers, noth inside and cutside of containment, was conducted on Junc 19 and.10,19/ t / c:at:cr maintenance perconnel.

~

A small quantity of fluid was added to tivo of the Bergen-Paterson snubber accu:r.ulators outside the containment. All snubbers were considered operable at this inspection.

During an outage on June 21, 1971 through June 26, 1974 these two units as well as a third unit were replaced or repaired. Plans for this action were stated in our letter to you dated June 10, 1974.

Very truly yours, l

i[,h[,y! hybut. //

t l

Keith W. Amish l

\\/

i U

's L-f y'

3 A

b

[

D N

(s1

(

0304210321 751223 J . a. ~

4 PDR ADOCK 05000244 G

PDR COPY SENT ltEGION

__