!.I ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER. N.Y.14649 GM ANGE R F.. G RE E N i
aeta coor e 516 2 700 June 10,1974 4'b5 I
4X f
Mr. Karl Goller 6
h }nr 'l}
Assistant Director for Operating Reactors
's Directorate of Licensing g
L U. S. Atomic Energy Commission JUN141974>
-i Washington, D. C.
20545 u.s. nc: :a ecca Sc::J.::s::ca <
Subject:
Inspection of Hydraulic Shock Absorbers hj,[-jg g
I (Snubbers) 6 j/
y\\
R. E. Ginna Nuclear Power Plant, Unit No.1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1,1973, concerning periodic inspection of hydraulic shock absorbers (snubbers), an inspection of all ca.ubberc, both incidc cnd cutcidc of centcinment, viss conducted on May 23,1974 by station maintenance personnel.
Fluid was added to six of the Bergen-Paterson snubbers outside the containment. Three of these exhibited minor leakage of fluid, and will be repaired or replaced at the first hot shutdown of at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. All snubbers were considered operable at this inspection.
l Ve ly yours,
(
l
/
an E
re-i
[
\\
,g
\\f l],} YL(
h(e~
f
/C 0304210325 751223 9
PDR ADOCK 05000244 G
/