ML20084F938

From kanterella
Jump to navigation Jump to search
Informs of Periodic Insp of Hydraulic Shock Absorbers During 740101-0425 Outage Per Skovholt .Seven Snubbers Replaced W/Spares or Rebuilt Units & Twelve Addl Snubbers Added
ML20084F938
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/10/1974
From: Amish K
ROCHESTER GAS & ELECTRIC CORP.
To: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084F681 List:
References
NUDOCS 8304210330
Download: ML20084F938 (1)


Text

e -. s, e

'C O

O s.

l t

l

.y.

y g/

\\ h

.a ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y.14549 3 n n <, miss vuse ow u,. o n. c. - u. n e. r ansa coce m 546.270o e 6. s,.. ;..., - s r. ne

'p(g%

j May 10,1974

,j l

l 0

p' n

r 1l g

MAY151974 b~

Mr. Donald J. Skovholt 5

Assistant Director for Operating Reactors

~

l- ;l Directorate of Licensing O.

u'$$lyd (Y/

U. S. Atomic Energy Commission

[# "rt A7

,ch l

'3 g&

Washington, D.C. 20545 co

Subject:

Inspection of Hydraulic Shock Abscrbers (Snubbers)

R. E. Ginna Nuclear Power Plant, Unit No.1 Docket No. 50-244

Dear Mr. Skovholt:

In accordance with your letter of October 1,1973 concerning periodic inspection of hydraulic shock absorbers (snubbers), an inspection of all Ginna Plant snubbers was conducted during the unit outage of January 1 ilu vuuis Apill 2's, 1374.

In the Containment, the seven Bergen-Paterson snubbers were replaced with spares or rebuilt units, all of which use the ethylene-propolene "O" rings. The remaining snubbers, of different manufacturers, were also inspected and did not require maintenance.

For the balance of the plant, five Bergen-Paterson snubbers were replaced because they had previously exhibited minor leakage of fluid. Twelve additional Grir el snubbers were added to the steam dump and reheat steam lines.

All the snubbers, including those which were replaced, were considered o' erable. Inspections of all units were completed on April 8,1974, while p

the plant was in a shutdown condition, and again on April 28,1974 after -

the plant was at power. All hydraulic units are operable.

Very tru y yours,